Loading…
Loading…
Tender Value
₹29.7 L
EMD Value
₹59,480
Closing Date
15 Jun 2026, 4:00 pm6d left
Executive Engineer RnB Division Gurez
Executive Engineer RnB Division Gurez
Development of Park for recreation by way of fencing landscaping etc. at Dawar
2026_PWDJK_311770_1
E-NIT No 13 2026-27 EE-RnB-Grz-1936-42 E-tendering Dated-06-06-2026
Open Tender
Civil Works
360 days
Gurez
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,100
Executive Engineer RnB Division Gurez
₹59,480
Executive Engineer RnB Division Gurez
8 Jun 2026
8 Jun 2026
16 Jun 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | 164.4 | Cum | 256.85 | ₹42,226.14 |
| 1.01 | Labour for filling available earth in foundation trenches, drains etc incl dressing, leveling as directed by engineer in charge complete job. | 123.3 | Cum | 100 | ₹12,330 |
| 2 | P/L, of dry stone soling duly hand packed in foundation trenches ,drains etc.incl.all costs and carriage complete job. | 19.91 | Cum | 1,200 | ₹23,892 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 aggregate 40mm nominal) using Nallah aggregates. incl. all carriage complete job | 17.18 | Cum | 5,100 | ₹87,618 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: in 1:3:6 (1 Cement : 3 coarse sand : 6 aggregate 40 mm nominal size ) using Nallah aggregates. incl. all carriage complete job | 96.68 | Cum | 5,700 | ₹5,51,076 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 459 | Sqm | 286.35 | ₹1,31,434.65 |
| 6 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes. | 7,875 | KG | 156.95 | ₹12,35,981.25 |
| 7 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.Two or more coats on new work. | 504 | Sqm | 131.85 | ₹66,452.4 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level. (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) using nallah aggregate incl all carriages complete. | 5.89 | Cum | - | - |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 589 | KG | 123.2 | ₹72,564.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_1009324.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid