| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC | ₹16.0 L | L1 | Accepted-AOC less than quotation rate |
| 2 | Rejected-Technical | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | A P CONSTRUCTIONS L1 |
|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation to the full depth as may be directed by departmental officers in all types of soils except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in the places shown by the departmental officers with initial lead of 10 Meters and initial lift 2 Metres and clearing and leveling the site etc. complete complying with standard specification. | 314 | M3 | 197.8 ₹62,109.20 |
| 2.00 | Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 45 | M3 | 5,651.1 ₹2.5 L |
| 3.00 | Supplying and errecting centering to sides and soffits inculding supports and strtting for drainage sides and culvertbody wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over(silver oak joists) of size 10cm x 6.50cm spaced at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. TNDSS NO. 30 & 86 | 768 | M2 | 575.4 ₹4.4 L |
| 4.00 | Plain Cement Concrete 1:2:4 (One Part of cement, two Part of sand, four Part of Aggregate) mix using 20mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting and curing the concrete to site and other incidental charges etc., complete. as per standard specification 28 V,VI S25 | 116 | M3 | 6,991.1 ₹8.1 L |
| 5.00 | Granolithic Floor finishing with Cement Concrete 1:2:4 (One part of cement, two parts of sand and four parts of ISS HBG metal) mix using 10mm to 12mm ISS size HBG metal to 25mm thick including cost and conveyance of all materials etc.and all lobour charges etc.complete as per Standard specification and as directed by the departmental officers. TNBP No:39-F | 192 | M2 | 174.2 ₹33,446.40 |
Tender Value
₹19.5 L
EMD Value
₹19,500
Closing Date
20 May 2026, 3:00 pmClosed
EXECUTIVE OFFICER
EXECUTIVE OFFICER C Pudupatti Town Panchayat
General Fund 2025-2026 Construction of Storm water Drainage for ward 15 Indira Colony from 8 th Cross Street to Sridar thottam in C Pudupatti Town Panchayat
2026_DTP_677292_1
116/2026
Open Tender
Civil Works - Others
180 days
C Pudupatti Town Panchayat Limit
As Per Tender Document
3 documents required · 3 mandatory
₹0
₹19,500
Yes
C Pudupatti Town Panchayat
26 May 2026
16 May 2026
20 May 2026
16 May 2026
20 May 2026
16 May 2026
16 May 2026 - 20 May 2026
18 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation for foundation to the full depth as may be directed by departmental officers in all types of soils except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in the places shown by the departmental officers with initial lead of 10 Meters and initial lift 2 Metres and clearing and leveling the site etc. complete complying with standard specification. | 314 | M3 | - | - |
| 2 | Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 45 | M3 | - | - |
| 3 | Supplying and errecting centering to sides and soffits inculding supports and strtting for drainage sides and culvertbody wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over(silver oak joists) of size 10cm x 6.50cm spaced at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. TNDSS NO. 30 & 86 | 768 | M2 | - | - |
| 4 | Plain Cement Concrete 1:2:4 (One Part of cement, two Part of sand, four Part of Aggregate) mix using 20mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting and curing the concrete to site and other incidental charges etc., complete. as per standard specification 28 V,VI S25 | 116 | M3 | - | - |
| 5 | Granolithic Floor finishing with Cement Concrete 1:2:4 (One part of cement, two parts of sand and four parts of ISS HBG metal) mix using 10mm to 12mm ISS size HBG metal to 25mm thick including cost and conveyance of all materials etc.and all lobour charges etc.complete as per Standard specification and as directed by the departmental officers. TNBP No:39-F | 192 | M2 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tendernotice_2.pdf
PDF • 0.30 MB
BOQ_813817.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid