Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹64,315.01Admitted-Finance DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | -27.89% | ₹64,315.01 | L1 | Admitted-Finance |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
2 May 2026, 6:00 pmClosed
Executive Engineer Irrigation Division No.II Jammu
Jammu
Maintenance Repair works including Petty works to be executed at site as per the necessity demands emergent nature for up keeping of LIS Biaspur Parlah, LIS Pandorian, LIS Pindi Sarochan LS, LIS Kothey Kalyana LS, LIS Kothey Kalyana RS, LIS Dhama
2026_IFC_307415_9
e-NIT No. 03 of 04/2026-27
Open Tender
Civil Works - Canal
Percentage
240 days
Jammu
As per NIT
2 documents required · 2 mandatory
₹200
Executive Engineer Irrigation Division No.II Jammu
₹3,000
18 May 2026
6 Apr 2026
4 May 2026
6 Apr 2026
2 May 2026
6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | - | Per 100 Sqm | 1 | - |
| - | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth upto and including 120 cm girth. | - | Per No. | - | - |
| - | Removal of dead animals and disposal at safe plase far off from locality as per the diections of Engineer In-Charge. | - | Per No. | - | - |
| - | Supply of labour for all sort of works as per requirement. | - | Per No. | - | - |
| - | Deployment of JCB Machine including POL Charges and Operator. | - | Per Hr. | - | - |
| - | Filling E.C.Bags with Sand/Earth including loading, unloading, carriage, placing in position in dry including cost of emprty cement bags, supply and carriage of material for filling (Complete Job). | - | Per No. | 1 | - |
| - | Filling E.C.Bags with Sand/Earth including loading, unloading, carriage, placing in position in wet including cost of emprty cement bags, supply and carriage of material for filling (Complete Job). | - | Per No. | 1 | - |
| - | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) - Dry | - | Per Cum | - | - |
| - | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) - Wet | - | Per Cum | 1 | - |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)- Crushed. | - | Per Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_997396.xls
BOQ • 0.30 MB
Corrigedumextension2.pdf
PDF • 0.13 MB
Corrigendum1.pdf
PDF • 0.48 MB
Corrigedumextension.pdf
PDF • 0.13 MB
Corrigedum.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .