| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹27.6 LAccepted-AOC NEAR CENTRAL JAIL LAXMI NAGAR P S RAMPUR DISTT GAYA PIN 823001 BIHAR | GAYA | GAYA | BIHAR | 823001 | L-1 | Accepted-AOC Being lowest bidder | |
| 2 | L-2₹27.7 L+₹8,111.50 (0.29%)Rejected-AOC | L-2 | Rejected-AOC Other than lowest bidder | |
| 3 | L-3₹29.3 L+₹1.7 L (6.17%)Rejected-AOC | L-3 | Rejected-AOC Other than lowest bidder | |
| 4 | L-4₹32.8 L+₹5.2 L (19.0%)Rejected-AOC 275 2 AJIT NAGAR UPPER GADIGARH AIR PORT ROAD JAMMU INDEX NO D 04 ADGNJ | JAMMU | JAMMU AND KASHMIR | 180001 | L-4 | Rejected-AOC Other than lowest bidder | |
| 5 | L-5₹33.1 L+₹5.5 L (19.9%)Rejected-AOC 5 A LANE 1 GREATER KAILASH JAMMU J K 180011 | JAMMU | JAMMU AND KASHMIR | 180011 | L-5 | Rejected-AOC Other than lowest bidder |
| Sl No | Description | Qty | Unit | GENESIS INDIA L4 | M/S ARUN ANAND L7 | NARESH KUMAR AND COMPANY L5 | Ghuman Builders L2 | TRADE INDIA L6 | bamral builder L9 | M/s Ashok Kumar L1 | M/S SUDAGAR MAL L3 | S R CONSTRUCTIONS L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of brick work or stone / boulder masonry including all quoins, arches, pillars, etc. built in cement mortar or cement lime mortar complete all as specified and directed. | 275 | Cum | 75 ₹20,625 | 300 ₹82,500 | 100 ₹27,500 | 30 ₹8,250 Lowest | 120 ₹33,000 | 50 ₹13,750 | 50 ₹13,750 | 85 ₹23,375 | 50 ₹13,750 |
| 2.00 | M & L for brick work with sub class ‘B’ old size bricks straight or curved on plan exc. 6.00 m mean radius built in cement mortar 1:4 complete all as specified and directed. | 245 | Cum | 4,813 ₹11,79,185 | 4,800 ₹11,76,000 | 3,700 ₹9,06,500 | 3,250 ₹7,96,250 | 3,000 ₹7,35,000 | 4,500 ₹11,02,500 | 3,000 ₹7,35,000 | 2,150 ₹5,26,750 Lowest | 4,800 ₹11,76,000 |
| 3.00 | M & L for brick work with sub class ‘B’ old size bricks (EXCEPT BRICKS) straight or curved on plan exc. 6.00 m mean radius built in cement mortar 1:4 complete all as specified and directed. NOTE: - OLD BRICKS OBTAINED FROM DEMOLITION SHALL BE USED UNDER THIS ITEM. | 30 | Cum | 1,575 ₹47,250 Lowest | 2,000 ₹60,000 | 3,300 ₹99,000 | 2,250 ₹67,500 | 1,800 ₹54,000 | 1,700 ₹51,000 | 1,800 ₹54,000 | 1,700 ₹51,000 | 2,000 ₹60,000 |
| 4.00 | Taking down cement plaster of any description on brick or stone walls or from concrete surface including raking out joints, hacking for key, scrubbing down with water etc, and removing unserviceable material outside cantt area, complete all as specified and directed. | 1,500 | Sqm | 5 ₹7,500 Lowest | 5 ₹7,500 Lowest | 10 ₹15,000 | 5 ₹7,500 Lowest | 40 ₹60,000 | 9 ₹13,500 | 5 ₹7,500 Lowest | 17 ₹25,500 | 5 ₹7,500 Lowest |
| 5.00 | Dismantling mild steel work of any description not otherwise provided for complete all as specified and as directed. | 1.6 | Qtl | 500 ₹800 | 900 ₹1,440 | 500 ₹800 | 1,000 ₹1,600 | 40 ₹64 Lowest | 200 ₹320 | 100 ₹160 | 5,000 ₹8,000 | 1,000 ₹1,600 |
| 6.00 | M & L for PCC 1:2:4, nominal mix, type B-0, using 12.5mm graded crushed stone aggregate as in lintels upto 1.5m clear span, cills, steps, seismic and other similar bands, plinth courses, coping, bed plates and the like including weathering, slightly rounded or chamfered angles and throating including necessary form work, complete all as specified and directed. | 7.11 | Cum | 3,900 ₹27,729 | 4,200 ₹29,862 | 4,000 ₹28,440 | 3,500 ₹24,885 | 1,800 ₹12,798 Lowest | 5,000 ₹35,550 | 4,000 ₹28,440 | 6,800 ₹48,348 | 6,000 ₹42,660 |
| 7.00 | S & F of galvanised, 2 strand, steel barbed wire 2.24 mm dia barbed with 2 mm dia barbs at 75 mm spacing and straining and fixing to any type of standard rails, straining bolts, including securing or tying at crossings with and provision of galvanised mild steel wire, straining bolts at ends, staples or steel pins etc. complete all as specified and directed. | 22 | 100 RM | 1,400 ₹30,800 | 1,800 ₹39,600 | 1,350 ₹29,700 | 1,200 ₹26,400 | 160 ₹3,520 Lowest | 1,450 ₹31,900 | 800 ₹17,600 | 1,020 ₹22,440 | 1,700 ₹37,400 |
| 8.00 | Restraining resecuring of galvanised, 2 strand, steel barbed wire 2.24 mm dia barbed with 2 mm dia barbs at 75 mm spacing and straining and fixing to any type of standard rails, straining bolts, including making good staples complete all as specified and directed. | 3.22 | 100 Rm | 1,000 ₹3,220 | 600 ₹1,932 | 500 ₹1,610 | 500 ₹1,610 | 90 ₹289.8 Lowest | 1,300 ₹4,186 | 300 ₹966 | 850 ₹2,737 | 500 ₹1,610 |
| 9.00 | M& L for hand rails, half round or others stock section or core for wooden hand rail straight portion, drilled and counter sunk for balusters running bars, for doors, balusters, nosing to steps including embedding in concrete and screwing etc, wind ties for roof including securing bolts, posts and struts brackets etc in fencing including cutting tops to shape as directed, drilling holes, notching for wire etc, flat iron fillets (for secuing wire mesh etc.,) including all necessary drilling, bolting or reveting etc., and similar work confirming to FE-290 Gde E-165 complete all as specified and directed. | 1,650 | Kg | 81 ₹1,33,650 | 75 ₹1,23,750 Lowest | 88 ₹1,45,200 | 80 ₹1,32,000 | 100 ₹1,65,000 | 90 ₹1,48,500 | 90 ₹1,48,500 | 75 ₹1,23,750 Lowest | 92 ₹1,51,800 |
| 10.00 | M& L for 15 mm thick rendering on fair faces of brick work or concrete surfaces of walls etc in CM 1:4 incl finished the surfaces even and smooth without using extra cement, complete all as specified and directed. | 2,900 | Sqm | 149 ₹4,32,100 | 180 ₹5,22,000 | 200 ₹5,80,000 | 135 ₹3,91,500 Lowest | 140 ₹4,06,000 | 160 ₹4,64,000 | 150 ₹4,35,000 | 200 ₹5,80,000 | 180 ₹5,22,000 |
Tender Value
₹48.4 L
EMD Value
₹97,000
Closing Date
25 Sept 2025, 6:00 pmClosed
Sh Tanuj Bagla IDSE EE GE
GE Kaluchak PIN-900673 C/O 56 APO
SPECIAL REPAIR TO BOUNDARY WALL AND PROVN OF HARD STANDING FOR PARKING OF SCHOOL BUSES OF CHILDREN SCHOOL AT RATNUCHAK MIL STN UNDER GE KALUCHAK
2025_MES_729313_1
GE/KC-41/2025-26
Open Tender
Civil Works
Works
180 days
Kaluchak
Please refer tender specifications
9 documents required · 9 mandatory
₹500
GE Kaluchak
₹97,000
Yes
4 Dec 2025
4 Sept 2025
27 Sept 2025
4 Sept 2025
25 Sept 2025
18 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .