Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance | ₹2.6 L | L1 | Admitted-Finance |
| 2 | L2₹2.8 L+₹20,710 (7.96%)Admitted-Finance | ₹2.8 L+₹20,710 (7.96%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Mahesh Kumar L1 | Acchan L2 |
|---|---|---|---|---|---|
| 1.00 | Excavating holes more than 0.10 cum & up to 0.5 cum including getting out the excavated soil etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto1.5 m.
a) All kinds of soil. | 18 | Each | 560 ₹10,080 Lowest | 600 ₹10,800 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
a) 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 5 | One Cubic Metre | 8,000 ₹40,000 | 850 ₹4,250 Lowest |
| 3.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 900 | One Kilogram | 150 ₹1,35,000 Lowest | 200 ₹1,80,000 |
| 4.00 | Extra for using MS pipe/plate in above item i.e in item no.3 instead of using normal structural MS member | 700 | One Kilogram | 25 ₹17,500 Lowest | 30 ₹21,000 |
| 5.00 | Extra for making hole of dia upto 10mm nominal bore for fixing barbed wired with GI staples all complete as per direction of Engineer-in-Charge. | 324 | Each | 20 ₹6,480 Lowest | 30 ₹9,720 |
| 6.00 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
A) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 100 | One Kilogram | 180 ₹18,000 Lowest | 200 ₹20,000 |
| 7.00 | Extra for using MS heavy duty hinge of 3" of approved design and manufacture with welding all complete as per direction of Engineer-in-Charge. | 3 | Each | 300 ₹900 Lowest | 300 ₹900 Lowest |
| 8.00 | Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement.
A) 12 mm cement plaster | 4 | One Square Metre | 600 ₹2,400 Lowest | 600 ₹2,400 Lowest |
| 9.00 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.
a) With G.I. barbed wire | 730 | One Square Metre | 30 ₹21,900 Lowest | 30 ₹21,900 Lowest |
| 10.00 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :
a) Two or more coats on new work. | 50 | One Square Metre | 160 ₹8,000 Lowest | 200 ₹10,000 |
Tender Value
₹2.4 L
EMD Value
₹4,769
Closing Date
28 May 2026, 6:00 pmClosed
EE (C)
Executive Engineer (Civil) BSNL, Civil Division, Gurugram
Provision of Barbed wire fencing at BSNL vacant plot at Uchcha Gaon, Ballabhgarh under Faridabad BA
2026_BSNL_277715_1
08/EE/BSNL/CD/GRG/2026-27
Open Tender
Civil Works
Item Rate
30 days
Uchcha Gaon, Ballabhgarh under Faridabad BA
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
A.O.(Cash)
₹4,769
30 May 2026
15 May 2026
30 May 2026
15 May 2026
28 May 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating holes more than 0.10 cum & up to 0.5 cum including getting out the excavated soil etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto1.5 m.
a) All kinds of soil. | 18 | Each | - | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
a) 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 5 | One Cubic Metre | - | - |
| 3 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 900 | One Kilogram | - | - |
| 4 | Extra for using MS pipe/plate in above item i.e in item no.3 instead of using normal structural MS member | 700 | One Kilogram | - | - |
| 5 | Extra for making hole of dia upto 10mm nominal bore for fixing barbed wired with GI staples all complete as per direction of Engineer-in-Charge. | 324 | Each | - | - |
| 6 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
A) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 100 | One Kilogram | - | - |
| 7 | Extra for using MS heavy duty hinge of 3" of approved design and manufacture with welding all complete as per direction of Engineer-in-Charge. | 3 | Each | - | - |
| 8 | Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement.
A) 12 mm cement plaster | 4 | One Square Metre | - | - |
| 9 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.
a) With G.I. barbed wire | 730 | One Square Metre | - | - |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :
a) Two or more coats on new work. | 50 | One Square Metre | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.42 MB
BOQ_324299.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .