Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 00 JALESAR MAHAVIR GANJ 00 VILLAGE TOWN JALESAR CITY ETAH ETAH UTTAR PRADESH 207302 INDIA | ETAH | UTTAR PRADESH | 207302 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
30 Mar 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
132 KV Substation Odpura Mathura Road Hathras
Radiators Gasket replacement of 63 MVA Transformer at 132 KV substation Odpura under ETD Hathras
2021_UPTCL_567529_2
17/ETD(H)/2020-21
Open Tender
Electrical Works
Lump-sum
60 days
132 KV substation Odpura Hathras
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ETD Hathras
₹2,000
30 Mar 2021
24 Mar 2021
30 Mar 2021
24 Mar 2021
30 Mar 2021
24 Mar 2021
60 days
Amount
Shifting of 20 KL oil tank from any substation within 100 Km to 132 KV S/S Odpura (Hathras) including loading & unloading.
Shifting of 20 KL oil tank from 132 KV S/S Odpura, Hathras (After completion of work) to the substation as directed by Engineer incharge, within 100 Km including loading & unloading.
Complete draining the transformer oil from 63 MVA T/F -I into empty 20 KL oil tank (Approximate 20 KL) after proper cleaning of oil tank.
Dismantling of radiators from T/F main tank and blanking of main tank. Work also include proper stacking of radiators at disignated place after blanking.
Replacement of all old and damaged gaskets of radiators by providing and cutting of new best quality cork sheet from Nu-Cork/Talbros make.
Erection of radiators, complete in all respect after gasket replacement.
Complete evacuation of 63 MVA transformer main tank and filling of dry air/nitrogen of dew point -50Cᵒ better in vacuum up to pressure of 0.25Kg/cm² and again evacuating the transformer tank after required time interval (approximate 24 hours) using centrifuging machine. The work include connection of pipe of machine as required for measuring the dew point value of nitrogen/dry air after every cycle till the required value is achieved. Dry air plant shall be provided by the contractor at his own cost.
Creating vacuum in 63 MVA T/F for 24 hrs at 760 mm Hg.
Filling of centrifuged T/F oil in T/F main tank from 20 KL oil tank.
Centrifuging of 63 MVA transformer oil in 20 KL storage tank after draining of oil and in main tank after refilling of oil including conservator tank, radiators and OLTC tank for atleast 72 hours by minimum 10 KL/Hour capacity centrifuging machine to match required standard of oil parameters. Centrifuging machine with fresh oil filters shall be arranged by the contractor alongwith operator and taking the B.D.V values of the oil periodically till the required value is achieved as per direction of supervising engineer. Calibrated BDV machine shall be provided by the contractor at his own cost.
Versha and Brothers
Reliance Enterprises
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .