Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹58.0 LAdmitted-Finance | -27.27% | ₹58.0 L | L1 | Admitted-Finance |
| 2 | L2₹68.9 LAdmitted-Finance | -13.51% | ₹68.9 L | L2 | Admitted-Finance |
| 3 | L3₹71.6 LAdmitted-Finance | -10.11% | ₹71.6 L | L3 | Admitted-Finance |
| 4 | L4₹73.5 LAdmitted-Finance | -7.77% | ₹73.5 L | L4 | Admitted-Finance |
Tender Value
₹83.7 L
EMD Value
₹1.7 L
Closing Date
7 Jul 2026, 11:00 amClosed
EXECUTIVE ENGINEER BDA BIKANER
BDA CAMPUS BIKANER
E-BID-05-2026-27 WORK NO 03
2026_UITBK_570941_3
E-BID-05-2026-27
Open Tender
Civil Works
Percentage
180 days
BIKANER
E-BID-05-2026-27 WORK NO 03
2 documents required · 2 mandatory
₹1,000
SECRETARY BDA BIKANER
₹1.7 L
Yes
22 Jul 2026
24 Jun 2026
7 Jul 2026
24 Jun 2026
7 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m, disposed earth to be levelled and neatly dressed : All kinds of soil | 810 | Cum | 178 | ₹1,44,180 |
| 2 | Carriage of Earth sand line Murom with all leads | 810 | Cum | 125 | ₹1,01,250 |
| 3 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 165 | Cum | 3,302 | ₹5,44,830 |
| 4 | Brick masonry with F.P.S. bricks of class designation 100 in foundation and plinth with bricks Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 355 | Cum | 4,426 | ₹15,71,230 |
| 5 | Brick work with F.P.S. bricks of class designation 100 in superstructure above plinth level upto floor V level in all shapes and sizes in: Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 230 | cum | 5,250 | ₹12,07,500 |
| 6 | Providing and fixing steel gate, grating , and grills made of angles, tees, square bars, flats,or black pipe with holdfast and fittings complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide | 6,000 | Kg | 96 | ₹5,76,000 |
| 7 | Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish : 20mm thick . | 3,000 | Sqm | 202 | ₹6,06,000 |
| 8 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix | 70 | Cum | 4,934 | ₹3,45,380 |
| 9 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level.
('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Cold twisted deformed bars (IS : 1786). | 1,800 | Kg | 77 | ₹1,38,600 |
| 10 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation, footings, strap beam, raft, bases of columns etc. | 400 | Sqm. | 157 | ₹62,800 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
BOQ_1015860.xls
BOQ • 0.33 MB
SP03.pdf
Tender Documents • 4.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].