Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-Finance | ₹9.9 L | L1 | Accepted-Finance OK |
| 2 | L2₹12.5 L+₹2.6 L (26.7%)Accepted-Finance | ₹12.5 L+₹2.6 L (26.7%) | L2 | Accepted-Finance OK |
| 3 | L3₹15 L+₹5.1 L (52.0%)Accepted-Finance | ₹15 L+₹5.1 L (52.0%) | L3 | Accepted-Finance OK |
| Sl No | Description | Qty | Unit | Vivek Electricals L1 | SS ASSOCIATES BSR L3 | C B S ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00fo|qr uxjh; forj.k [k.M&cqyUn'kgj] ds vUrxZr fctusl Iyku 2024&25 ¼ikVZ&1 o ikVZ&2½ ds vUrxZr Lohd`r dk;kZs esa izLrkfor ,l0Vh0ih0 iksy 11 eh0 Hk.Mkj dsUnz esa miyC/k ugh gksus ds dkj.k ,l0Vh0ih0 iksy ds LFkku ij ih0lh0lh0 iksy 11 eh0 Hk.Mkj dsUnz ls izkIr dj] yfEcr dk;Z dks iw.kZ djus dk dk;ZA | ||||||
| 2.00DESCRIPTION OF WORK/ITEM (S) | ||||||
| 3.00 | Safe carriage of 11 mtr long pcc pole from store center to site store with loading & unloading at both ends respectively distance within-0 to 50 Kms. | 125 | Nos. | 1,000 ₹1,25,000 Lowest | 2,000 ₹2,50,000 | 1,500 ₹1,87,500 |
| 4.00 | Erection of single pole PCC Pole 11 mtr long as per RESPO | 117 | Nos. | 6,100 ₹7,13,700 Lowest | 8,000 ₹9,36,000 | 7,000 ₹8,19,000 |
| 5.00 | Erection of double pole PCC Pole 11 mtr long as per RESPO | 4 | Nos. | 12,000 ₹48,000 Lowest | 16,000 ₹64,000 | 14,000 ₹56,000 |
| 6.00 | Excavation of For Each and grouting of PCC Pole 11 MTR as per RESPO Drawing and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. The support shall be grouted with cement, sand and stone ballast in ratio 1:4:8 including the cost of Cement, Sand, Stone Ballast, Stone Pad etc. as per actual site requirement | 125 | Nos. | 800 ₹1,00,000 Lowest | 2,000 ₹2,50,000 | 1,500 ₹1,87,500 |
Tender Value
₹10.9 L
EMD Value
₹10,910
Closing Date
1 Apr 2026, 1:00 pmClosed
SE EDC-I BSR
SE EDC-I HYDEL COLONY BULANDSHAHR
complete the pending work by getting 11 meter PCC pole from the storage centre in place of STP pole.
2026_PVVNL_1125887_1
T-81/EDC-I/B/2025-26
Open Tender
Electrical Works
Item Rate
30 days
BULANDSHAHR
PLZ REFER TENDER DOCUMENT
2 documents required · 2 mandatory
₹3,540
SE EDC-I
₹10,910
8 Apr 2026
26 Mar 2026
1 Apr 2026
26 Mar 2026
1 Apr 2026
26 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1fo|qr uxjh; forj.k [k.M&cqyUn'kgj] ds vUrxZr fctusl Iyku 2024&25 ¼ikVZ&1 o ikVZ&2½ ds vUrxZr Lohd`r dk;kZs esa izLrkfor ,l0Vh0ih0 iksy 11 eh0 Hk.Mkj dsUnz esa miyC/k ugh gksus ds dkj.k ,l0Vh0ih0 iksy ds LFkku ij ih0lh0lh0 iksy 11 eh0 Hk.Mkj dsUnz ls izkIr dj] yfEcr dk;Z dks iw.kZ djus dk dk;ZA | |||||
| 2DESCRIPTION OF WORK/ITEM (S) | |||||
| 3 | Safe carriage of 11 mtr long pcc pole from store center to site store with loading & unloading at both ends respectively distance within-0 to 50 Kms. | 125 | Nos. | - | - |
| 4 | Erection of single pole PCC Pole 11 mtr long as per RESPO | 117 | Nos. | - | - |
| 5 | Erection of double pole PCC Pole 11 mtr long as per RESPO | 4 | Nos. | - | - |
| 6 | Excavation of For Each and grouting of PCC Pole 11 MTR as per RESPO Drawing and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. The support shall be grouted with cement, sand and stone ballast in ratio 1:4:8 including the cost of Cement, Sand, Stone Ballast, Stone Pad etc. as per actual site requirement | 125 | Nos. | - | - |
stage.html
html • 0.04 MB
techsummary_2099284.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
T81PDF.pdf
Tender Documents • 1.18 MB
BOQ_2099284.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .