Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H4₹10.7 CrAccepted-AOC 19 JYOTI NAGAR HOSHANGABAD ROAD BHOPAL MADHYA PRADESH BHOPAL 462026 | BHOPAL | MADHYA PRADESH | 462026 | ₹10.7 Cr | H4 | Accepted-AOC WORK ORDER |
| 2 | H1₹11.2 CrRejected-Finance | ₹11.2 Cr | H1 | Rejected-Finance ORDER BY CMO |
| 3 | H2₹11.1 CrRejected-Finance | ₹11.1 Cr | H2 | Rejected-Finance ORDER BY CMO |
| 4 | H3₹11.0 CrRejected-Finance | ₹11.0 Cr | H3 | Rejected-Finance ORDER BY CMO |
| Sl No | Description | Qty | Unit | RAJ CONSTRUCTION AND ENGINEERING SOLUTIONS | PARAMOUNT ENGINEERS GROUP | JNB CONSTRUCTION | Meco Technologies Private Limited |
|---|---|---|---|---|---|---|---|
| 1.00Interception & Diversion of Nallahs with STP works Project of Pipariya town under SBM 2.0 | |||||||
| 1.01 | 1. Design and build sewage treatment plant of installed capacity 3.00 & 1.90 MLD and all appurtenant structures and allied works. 2. Survey and Investigation, Preparation of detailed Design and Construction drawing, Construction and Commissioning of wastewater collection (including I&D), treatment and disposal / reuse system and its operation and maintenance. | 1 | LUMPSUM | 11,22,73,588 ₹11.2 Cr | 10,68,84,576 ₹10.7 Cr | 11,11,10,990 ₹11.1 Cr | 10,97,00,000 ₹11.0 Cr |
Tender Value
₹11.6 Cr
EMD Value
₹5.8 L
Closing Date
21 Jan 2025, 5:30 pmClosed
Chief Municipal Officer PIPARIYA
Municipal Council PIPARIYA
Interception and Diversion for tapping nallah and setup of sewage treatment plant for Used Water Management of Pipariya Town under SBM 2.0
2024_UAD_390197_1
NIT No 825_Dated 20.12.2024
Open Tender
Miscellaneous Works
365 days
Work
Please refer Tender documents.
4 documents required · 4 mandatory
₹30,000
₹5.8 L
18 Aug 2025
23 Dec 2024
23 Jan 2025
23 Dec 2024
21 Jan 2025
23 Dec 2024
Interception & Diversion of Nallahs with STP works Project of Pipariya town under SBM 2.0
1. Design and build sewage treatment plant of installed capacity 3.00 & 1.90 MLD and all appurtenant structures and allied works. 2. Survey and Investigation, Preparation of detailed Design and Construction drawing, Construction and Commissioning of wastewater collection (including I&D), treatment and disposal / reuse system and its operation and maintenance.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid