Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.3 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹22.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹24.7 L+₹2.4 L (11.0%)Admitted-Fee/PreQual/Technical/Finance | +11.00% | ₹24.7 L+₹2.4 L (11.0%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹22.3 L
EMD Value
₹22,300
Closing Date
20 Jul 2026, 5:00 pmClosed
DFO-cum-DMU Chief, Ghumsur North Division
Bhejiput, Bhanjanagar, Pin - 761126
Construction of Multi Product Cluster Building at Forest Colony, 2nd Line, Bhanjanagar
2026_DFOGN_134245_1
GHN(N)-BNJ-F.E AND C.C-01/2026-27
Open Tender
Civil Works - Buildings
Percentage
Forest Colony, 2nd Line, Bhanjanagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹22,300
Yes
22 Jul 2026
4 Jul 2026
21 Jul 2026
4 Jul 2026
20 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation of foundation in hard soil with initial lead of 1.5m initial and initial lift of 1.5 m including rough dressing and levelling the bed etc. and Complete | 72.37 | Cum | 267.78 | ₹19,379.24 |
| 2 | Filling in foundation and plinth with sand well watered and rammed with cost conveyence and rayality etc and complete. | 64.98 | Cum | 619.79 | ₹40,273.95 |
| 3 | Providing cement concrete (1:3:6) with 4 C.M size H.B.G metal including cost conveynce. | 26.2 | Cum | 5,661.14 | ₹1,48,321.87 |
| 4 | Fly-Ash Brick work with C:M (1: 6) in F/P with cost and conveyence of all matarials etc & complete. | 6.35 | Cum | 5,506.28 | ₹34,964.88 |
| 5.1 | RCC M20 using 20 mm & down graded CBG chips for R.C.C work with cost conveyence etc complete. Column base & Footing. | 10.01 | Cum | 6,158.32 | ₹61,644.78 |
| 5.2 | Plinth Beam | 5.58 | Cum | 6,773.84 | ₹37,798.03 |
| 5.3 | Lintel Band | 2.98 | Cum | 13,745.8 | ₹40,962.48 |
| 5.4 | Beam & Column | 10.82 | Cum | 15,329.52 | ₹1,65,865.41 |
| 5.5 | Chajja | 27.31 | Sqm | 1,191.82 | ₹32,548.6 |
| 5.6 | Slab | 24.51 | Cum | 13,334.49 | ₹3,26,828.35 |
stage.html
html • 0.02 MB
finance_599483.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.68 MB
DTCN_1.pdf
Tender Documents • 2.14 MB
BOQ_599483.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .