| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 CrAdmitted-Finance | ₹10.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹10.0 CrAdmitted-Finance | ₹10.0 Cr | L2 | Admitted-Finance |
| 3 | L3₹10.6 CrAdmitted-Finance | ₹10.6 Cr | L3 | Admitted-Finance |
| 4 | L4₹15.5 CrAdmitted-Finance F 31 INDUSTRIAL AREA PHASE VIII SAS NAGAR MOHALI 160071 | S A S NAGAR | PUNJAB | 160071 | ₹15.5 Cr | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Lahoty Buildcon Limited L1 | 21st Century Enviro Engineers Pvt. Ltd. L2 | LEGEND INDIA ENVIRONMENT PROTECTION PRIVATE LIMITED L3 | Hydrotech Paryavaran India Pvt. Ltd. L4 |
|---|---|---|---|---|---|---|---|
| 1.00Schedule A - Design & Drawing | |||||||
| 1.01 | Submission and approval of Surveys, Soil Investigations ,Designs, Working Drawings including all layout, sections, typical details, Shop Drawings, as Built drawings ..etc complete for all components of works like 1.5 MLD STP at Dhalli based on Advanced modern SBR technology including all auxillary buildings / structures and all allied works as mentioned in Tender document. Contractor shall submit working Drawing and Implementation schedule as per Priority given by Engineer-In-Charge for approval. Payment shall be released on Prorata basis only after approval of working Drawings as per implementation schedule. | 1 | Lumpsum | - | - | - | - |
| 2.00Total for Schedule B (1.50 MLD at Dhalli)- Sewerage Treatment Plant of Capacity 1.50 MLD, SBR Type. | |||||||
| 2.01 | Designing, construction, Site development, hydraulic testing, commissioning and giving satisfactorily trials of 1.5 MLD STP of Advanced modern SBR technology which can be accommodated in limited identified land space consisting of Primary, Secondary and Tertiary Treatment Units as per the requirement of designed CPHEEO norms relevant IS codes etc. necessary piping work with required valves, gates, drains, path Ways, Administration Block cum Laboratory, Laboratory Equipments, Internal Roads, Pathways, Compound Wall, Tools and plants, Treated effluent arrangements complete as turnkey job with all involved Civil, electrical, Instrumentation and mechanical works Inclusive of following Items, units as per detailed specifications for civil, electrical, Instrumentation and mechanical components complete to achieve latest CPCB/ HPPCB / CPHEEO discharge standards BOD < 10ppm, TSS < 10ppm,Biological TN<10 ppm & PO4 < 2ppm to get recyclable quality of water for Industrial / agricultural purposes. All units shall be interconnected with administration building by suitable or RCC overhead walkways at the STP component as per the scope and confirming norms as mentioned above. The plant should be completely automated with PLC - SCADA etc complete. This item is inclusive of Design and Construction of RCC Retaining wall for Average 4 m height, Dismantling of existing structure if any, Site Development including any cutting, filling, grading etc. at site, All approach Roads / Access to Site, Piling/Anchoring with all labour, material as per Standard CPWD specifications and design approved by engineer in charge including all taxes (GST and other) and levies etc | 1.5 | MLD | - | - | - | - |
| 3.00Total of Schedule C -Operation and Maintenance of New 1.50 MLD Sewerage Treatment Plant at Lalpani for Seven years | |||||||
| 3.01 | Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for New 1.5 MLD Sewerage Treatment Plant of Dhalli For 1st year O&M | 12 | Month | - | - | - | - |
| 3.02 | Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for New 1.5 MLD Sewerage Treatment Plant of Dhalli For 2nd year O&M | 12 | Month | - | - | - | - |
| 3.03 | Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for New 1.5 MLD Sewerage Treatment Plant of Dhalli For 3rd year O&M | 12 | Month | - | - | - | - |
| 3.04 | Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for New 1.5 MLD Sewerage Treatment Plant of Dhalli For 4th year O&M | 12 | Month | - | - | - | - |
| 3.05 | Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for New 1.5 MLD Sewerage Treatment Plant of Dhalli For 5th year O&M | 12 | Month | - | - | - | - |
Tender Value
₹7.1 Cr
EMD Value
₹7.1 L
Closing Date
30 Dec 2019, 11:00 amClosed
Additional General Manager
Additional General Manager Sewerage SJPNL US Club Shimla 171001
Design Supply Construction Installation Testing and Commissioning of Sewage Treatment Plant of 1 5 MLD at Dhalli based on Advanced modern SBR technology with all contingent civil electrical mechanical piping and instrumentation work etc
2019_MC_32970_1
dated 28-11-2019
Open Tender
Miscellaneous Works
548 days
Shimla
Please refer Tender documents.
8 documents required · 8 mandatory
₹10,000
Yes
AGM Sew SJPNL US Club Shimla 171001
₹7.1 L
3 Feb 2020
29 Nov 2019
31 Dec 2019
29 Nov 2019
30 Dec 2019
29 Nov 2019
29 Nov 2019 - 30 Dec 2019
Amount
Schedule A - Design & Drawing
Submission and approval of Surveys, Soil Investigations ,Designs, Working Drawings including all layout, sections, typical details, Shop Drawings, as Built drawings ..etc complete for all components of works like 1.5 MLD STP at Dhalli based on Advanced modern SBR technology including all auxillary buildings / structures and all allied works as mentioned in Tender document. Contractor shall submit working Drawing and Implementation schedule as per Priority given by Engineer-In-Charge for approval. Payment shall be released on Prorata basis only after approval of working Drawings as per implementation schedule.
Total for Schedule B (1.50 MLD at Dhalli)- Sewerage Treatment Plant of Capacity 1.50 MLD, SBR Type.
Designing, construction, Site development, hydraulic testing, commissioning and giving satisfactorily trials of 1.5 MLD STP of Advanced modern SBR technology which can be accommodated in limited identified land space consisting of Primary, Secondary and Tertiary Treatment Units as per the requirement of designed CPHEEO norms relevant IS codes etc. necessary piping work with required valves, gates, drains, path Ways, Administration Block cum Laboratory, Laboratory Equipments, Internal Roads, Pathways, Compound Wall, Tools and plants, Treated effluent arrangements complete as turnkey job with all involved Civil, electrical, Instrumentation and mechanical works Inclusive of following Items, units as per detailed specifications for civil, electrical, Instrumentation and mechanical components complete to achieve latest CPCB/ HPPCB / CPHEEO discharge standards BOD < 10ppm, TSS < 10ppm,Biological TN<10 ppm & PO4 < 2ppm to get recyclable quality of water for Industrial / agricultural purposes. All units shall be interconnected with administration building by suitable or RCC overhead walkways at the STP component as per the scope and confirming norms as mentioned above. The plant should be completely automated with PLC - SCADA etc complete. This item is inclusive of Design and Construction of RCC Retaining wall for Average 4 m height, Dismantling of existing structure if any, Site Development including any cutting, filling, grading etc. at site, All approach Roads / Access to Site, Piling/Anchoring with all labour, material as per Standard CPWD specifications and design approved by engineer in charge including all taxes (GST and other) and levies etc
Total of Schedule C -Operation and Maintenance of New 1.50 MLD Sewerage Treatment Plant at Lalpani for Seven years
Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for New 1.5 MLD Sewerage Treatment Plant of Dhalli For 1st year O&M
Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for New 1.5 MLD Sewerage Treatment Plant of Dhalli For 2nd year O&M
Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for New 1.5 MLD Sewerage Treatment Plant of Dhalli For 3rd year O&M
Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for New 1.5 MLD Sewerage Treatment Plant of Dhalli For 4th year O&M
Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for New 1.5 MLD Sewerage Treatment Plant of Dhalli For 5th year O&M
Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for New 1.5 MLD Sewerage Treatment Plant of Dhalli For 6th year O&M
Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges forNew 1.5 MLD Sewerage Treatment Plant of Dhalli For 7th year O&M
21st Century Enviro Engineers Pvt. Ltd.
LEGEND INDIA ENVIRONMENT PROTECTION PRIVATE LIMITED
Hydrotech Paryavaran India Pvt. Ltd.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Vol-1.pdf
Tender Documents • 1.90 MB
Vol-II.pdf
Tender Documents • 6.20 MB
Vol-III.pdf
Tender Documents • 0.22 MB
Vol-IV.pdf
Tender Documents • 2.47 MB
BOQ_47495.xls
BOQ • 0.28 MB