| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.6 CrAdmitted-Finance GAT NO 43 DAWARGAON WALSA TQ BHOKARDAN DIST JALNA MAHARASHTRA 431114 | BHOKARDAN | JALNA | MAHARASHTRA | 431114 | +21.10% | ₹22.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹22.8 Cr+₹20.5 L (0.91%)Admitted-Finance PLOT NO G 5 ADDL MIDC PHASE I JALNA | JALNA | JALNA | MAHARASHTRA | +22.20% | ₹22.8 Cr+₹20.5 L (0.91%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical 802 IMPRESSA RISE 8 AMBAZARI ROAD OPP LAD COLLEGE SHIVAJI NAGAR NAGPUR 440010 | NAGPUR | MAHARASHTRA | 440010 | - | - | - | Rejected-Technical As per Tender Clause-Section 2 Instructions to Bidders ITB A. General 4.4A |
Tender Value
₹18.7 Cr
EMD Value
₹10.1 L
Closing Date
12 May 2026, 5:00 pmClosed
SE/PMGSY/Chhatrapati Sambhajinagar
Near Renuka mata mandir kaman Beed by pass Chh.Sambhajinagar
1) NH-52 To Takali - Borsar Bk -Up to Taluka Border ( (ODR-22,122,MRL-18) )Block Kannad.2.Aurala (ODR-100 ) To NIPANI (MDR-24) ( VR-164,LR-51) Road Block Kannad
2026_MMGSY_1298554_1
MMGSY/CSN/RD-AUR-A-105
Open Tender
Civil Works - Roads
Percentage
548 days
Kannad
Tender
2 documents required · 2 mandatory
₹29,500
₹10.1 L
SE office Chhatrapati Sambhajinagar
30 Jul 2026
28 Apr 2026
14 May 2026
28 Apr 2026
12 May 2026
28 Apr 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 11) NH-52 To Takali - Borsar Bk -Up to Taluka Border Km 0/000 to 10/900 Tq Kannad | |||||
| 1.01 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned ,up to lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201
(A) In area of non-thorny jungle | 4.02 | Hect. | 26,530.8 | ₹1,06,653.82 |
| 1.02 | Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 31,687.65 | Sqm | 15.8 | ₹5,00,664.87 |
| 1.03 | Excavation for roadway in ordinary Soil including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. ( For Unlined Drain ) | 18,085 | Cum | 54.76 | ₹9,90,334.6 |
| 1.04 | Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.
(i)Excavation in Cutting in Soil by Mech means with lead upto 100 m | 3,396.6 | Cum | 73.96 | ₹2,51,212.54 |
| 1.05 | Cement Treated Soil Sub-base/Base - Providing Laying and spreading soil on a prepared subgrade, pulverising adding the designed quantity of cement to the spread soil, mixing in place with rotavator, grading with the motar grader and compating with the road roller at omc to achive the desired unconfined compressive strength and to form a layer of improved Sub-base /base as per Technical Specification Cluase 404. (for 4 per cent quantity of cement by weight of soil ) | 4,298.85 | Cum | 801.15 | ₹34,44,023.68 |
| 1.06 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | 8,592.64 | Cum | 83.86 | ₹7,20,578.79 |
| 1.07 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical specification. Clause 301.5 | 21,790.48 | Cum | 545.66 | ₹1,18,90,193.32 |
| 1.08 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per technical Specification Clause 303.1 | 15,722.99 | Cum | 656.73 | ₹1,03,25,759.22 |
| 1.09 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density,complite as per Technical Specification Clause 401 -GSB | 7,455.49 | Cum | 2,322.35 | ₹1,73,14,257.2 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_2230268.xls
BOQ • 0.39 MB
UplodSBD.pdf
Tender Documents • 1.26 MB
Corrigendum-01-RD-AUR-A-105.pdf
PDF • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .