Loading…
Loading…
Tender Value
₹82.2 Cr
EMD Value
₹1.6 Cr
Closing Date
14 Aug 2026, 3:00 pm5d left
Yes (up to 3 members)
No
Two Packet System
Normal Tender
Yes
24/07/2026 11:00
Lowest to Highest
90 days
Expenditure
Capital (Works)
GSUBKN
15 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees, N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Bid Capacity: The tender/technical bid will be evaluated based on bid capacity formula detailed as Annexure-VI of GCC April 2022 (Amended up to date). Bid capacity shall be calculated for works costing more than 10 cr. or as prescribed by the Railways through an instruction/NIT issued for the work.
11 conditions · 3 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Structural drawing & design calculations for work duly proof checked by recognized engineering college is to be submitted by the contractor at his own expense If required by railways.
The quantities/amount mentioned above are rough and for guidance only and are subject to change according to the needs of the railway & variation thereof to any extent will not be the basis of any claim against the Railway. 2.The work shall be carried out as per CPWD DSR - 2023 (Amended up to date) & IRUSSOR -2021 (Amended up to date). 3.The rates should be inclusive of all labor and materials, taxes, lead, lift, loading, unloading, sales tax, etc. Nothing extra payment other than the accepted rates will be made in any circumstances. 4.The contract shall be Governed by the General Condition of Contract and Instructions to the Tenderers 2022 (Amended up to date). 5.All Tools and plants and mechanical equipments as required to execute the work shall be arranged by the contractor.6.Contractors/Suppliers/ Service providers/Parties shall register their firms under EPFO & GSTIN(GST identification Number)
A pre-bid conference will be held at 11:00 hrs on 24.07.2026 in the office of the Chief Project Manager, Gati Shakti Unit, in front of the Railway Ground, Bikaner. Contact No- 9001195259, Dy. CE/GSU/BKN.
Civil work in C/W Augmentation of Coaching Maintenance Facilities at Lalgarh (Phase-II).
06R-2026-GSU-BKN
06R-2026-GSU-BKN
Open
Works - General
15 Months
Bikaner, Rajasthan
₹0
₹1.6 Cr
16 Jul 2026
16 Jul 2026
31 Jul 2026
24 Jul 2026
229 items across 10 schedules · ₹79,28,80,595.09 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| (CAST IN SITU) | — | — | — | — | |
| laying in position cement grade excluding the and shuttering - All level : | — | — | — | — | |
| 1 | 1 1/2 coarse sand from natural sources : 3 aggregate 20 mm nominal natural sources) | cum | 5000 | 8,340.85 | 4,17,04,250 |
| 2 | : 4 coarse sand (zone- natural sources : 8 aggregate 40 mm nominal natural sources) | cum | 600 | 6,812 | 40,87,200 |
| Item- 2 | Concrete" appearing | in chapter-5 | of CPWD | — | DSR-2023(Amended up- |
| Schedule total | ₹4,57,91,450 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
specialconditionsforlalgarhphase21-1-38.pdf
ATTACHMENT
BIDCAPACITYFORMAT.pdf
ATTACHMENT
GCCCorrectionSlipsuptoACS11_1.pdf
ATTACHMENT
GCC-2022-UPTOACS09.pdf
ATTACHMENT
GeneralconditionGSU17.04.20261.pdf.pdf
ATTACHMENT
Correctedcompendiumofinstructiononsafetyatworkssite31.3.14_1.pdf PCE Circular
ATTACHMENT
procedureofdigginginvivnityofstcable1.pdf
ATTACHMENT
2022-CE-I-CT-GCCCorrespondencedated.14.05.2024.pdf
ATTACHMENT
AnnexureVIofGCC.pdf
ATTACHMENT
Annexure-A-2.pdf
ATTACHMENT
Correctedcompendiumofinstructiononsafetyatworkssite31.3.14_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].