Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.5 L+₹14,493 (4.29%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.6 L+₹24,155 (7.14%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹3.9 L+₹48,310 (14.3%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹4.3 L+₹96,620 (28.6%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.8 L
EMD Value
₹14,490
Closing Date
27 Jul 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
CONSTRUCTION OF DRAIN NEAR GRAVEYARD GUJJAR BASTI LIDROO BLOCK PAHALGAM
2026_RDPR_316703_26
ENIT68of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹14,490
28 Jul 2026
20 Jul 2026
28 Jul 2026
20 Jul 2026
27 Jul 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | site clearence by way of Engaging labours for removal of debris bushs etc i/c disposal | - | No | - | - |
| 0.0 | Earth work in excavation in foundation trenches (not exceeding 1.5 m in width as well as 10 Sqm. in plan) including dressing of slides and ramming of bottoms, lift up to 1.50 m and disposal lead upto 1.5m. All kinds of Soil. | - | Cum | - | - |
| 0.0 | P/L of dry stone soling hand packed and gsb filling including all carriages | 1 | Cum | - | - |
| 0.0 | P/L in position C.C of specified grade excluding the cost of centring and shuttering 1: 3: 6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size). | 1 | Cum | - | - |
| 0.0 | P/L OF PLUMS | 1 | Cum | - | - |
| 0.0 | P/F Centring and shuttering including strutting, propping etc. and removal of formwork complete job | - | Sqm | - | - |
| 0.0 | 12mm Cement plaster in 1:6 mix mortar | 1 | Sqm | 1 | ₹1 |
| 0.0 | Carriage of Sand/Agg. by MT of 40 KM (Paid as per Actual) hl 200m | 0.4 | Cum | - | - |
| 0.0 | Carriage of cement, shuttring etc by MT | - | Trip | - | - |
| 0.0 | Provision for signboard & photographs | - | L/S | 1 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_1035061.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .