Loading…
Loading…
Tender Value
₹14 L
EMD Value
₹1.4 L
Closing Date
30 Sept 2026, 12:00 pm
EXECUTIVE ENGINEER, CD-1, PWD, RAEBARELI
OFFICE OF EXECUTIVE ENGINEER, CD-1, PWD, RAEBARELI
Erection and Dismantling of Pantoon Bridge on Sai River in Gram Sabha Poorab Nayan Block Deeh in Distt Raebareli
2026_CEUCZ_1186701_2
1653/8 Lekha/2026-27 Dt. 08-09-2026
Open Tender
Civil Works
Fixed-rate
210 days
RAEBARELI
Erection and Dismantling of Pantoon Bridge on Sai River in Gram Sabha Poorab Nayan Block Deeh in Distt Raebareli
2 documents required · 2 mandatory
₹860
₹1.4 L
Yes
OFFICE OF EXECUTIVE ENGINEER, CD-1, PWD, RAEBARELI
22 Sept 2026
22 Sept 2026
30 Sept 2026
22 Sept 2026
30 Sept 2026
22 Sept 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Erection Work :-
Laying of wooden anchors in the river on the up stream/ Down stream side of the pontoon bridge site including their weaving packing the sand filled bags (av 90 bags) properly before laying and ixing to pontoon with coir rope/ sisall rope excluding cost. (As per Kumbh Mela SOR SI No. 6, Page No. 5) | 30 | Each | 732 | ₹21,960 |
| 2 | Carrying of pantoon in pair from river bank in Baripur side up stream to bridge side 2 km. distance to the alignment of bridge in water and fixing the same with other pantoon pair and reflexing the same in bridge alignment.(up steem Poorab Nayan side to river bank in 2km.)(As per Kumbh Mela SOR SI No. 3, Page No. 5) | 8 | Pair | 962 | ₹7,696 |
| 3 | Cartage and laying of chaquered plate including loading unloading cost of carriage from store and laying at site as per direction of Engineer in charge. (As per Kumbh Mela SOR SI No. 7, Page No.5) | 146 | Nos. | 60 | ₹8,760 |
| 4 | Fixing of railing post in position including making 16 mm dia 25 cm deep hole with the help of gererator and drill machine over sleeper and all saf edging before fixing the railling post with hepl of 300x16 mm size nut and bolts at 1.25mtr. c/c including all labour, material T&P etc. (As per Kumbh Mela SOR SI No. 8, Page No. 5) | 160 | Nos. | 34.5 | ₹5,520 |
| 5 | Cartage of wooden anchor from store to bridge head including loading unloading cartage etc. as per direction of Engineer in Charge (only for Departmental work) (As per Kumbh Mela SOR SI No. 12, Page No. 5) | 30 | Nos. | 350 | ₹10,500 |
| 6 | Relaying of chaquered plate after making camber by spreading of local sand as per direction E/I (As per Kumbh Mela SOR SI No. 13, Page No. 5) | 146 | Nos. | 24.2 | ₹3,533.2 |
| 7 | Digging and cartage of local sand / earth from Poorab Nayan Side including loading unloading 2 km cartage and duly stacked along chequered plate road as per direction of Engineer incharge. (As per Kumbh Mela SOR SI No. 14, Page No. 5) | 450 | Cum | 105 | ₹47,250 |
| 8 | Maintenance of pontoon bridge Length of bridge including pile on either side period : Start to end of Day Night. (As per Kumbh Mela SOR SI No. 17, Page No. 5) | 70 | R.M. | 278 | ₹19,460 |
| 9 | Boat with Mallah
(i) Small Boat. (As per Kumbh Mela SOR SI No. 22(i), Page No. 3) | 210 | Days | 368.7 | ₹77,427 |
| 10 | Lattering and painting of sign board of size 4'x3' (As per Kumbh Mela SOR SI No. 24, Page No. 3) | 5 | Nos. | 732 | ₹3,660 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
T1cd1rbl.pdf
Tender Documents • 0.19 MB
BOQ_2233803.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .