| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.8 LAdmitted-Finance | -38.00% | ₹32.8 L | L1 | Admitted-Finance |
| 2 | L2₹35.1 LAdmitted-Finance | -33.70% | ₹35.1 L | L2 | Admitted-Finance |
| 3 | L3₹36.0 LAdmitted-Finance R O SPITUK | -32.00% | ₹36.0 L | L3 | Admitted-Finance |
| 4 | L4₹37.0 LAdmitted-Finance | -30.00% | ₹37.0 L | L4 | Admitted-Finance |
Tender Value
₹52.9 L
EMD Value
₹1.2 L
Closing Date
25 May 2026, 4:00 pmClosed
Executive Engineer construction division Leh.
Executive Engineer construction division Leh.
Construction of Link road to Saboo Phoo from saboo main road (by way of widening, RRM side drain) (Under District Plan).
2026_PWD_18886_1
CDL 28 of Leh of 2026-27
Open Tender
Civil Works - Others
90 days
Leh
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
Executive Engineer construction division Leh.
₹1.2 L
1 Jun 2026
5 May 2026
26 May 2026
6 May 2026
25 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in
foundationtrenchesordrains(notexceeding1.5minwidthor10sqmonplan),
includingdressingof sidesandrammingofbottoms, liftupto1.5m, including
gettingouttheexcavatedsoilanddisposalofsurplusexcavatedsoilasdirected,
within a lead of 50 m.
All kinds of soil. | 378 | Cum | 278.09 | ₹1,05,118.02 | item 01 |
| 2 | Dumping stone including cost of stones. in Horizontal on level | 122.06 | Cum | 953.02 | ₹1,16,325.62 | item 02 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 78.75 | Cum | 5,725.33 | ₹4,50,869.74 | item 03 |
| 4 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) | 230.58 | Cum | 5,730.39 | ₹13,21,313.33 | item 04 |
| 5 | Random rubble masonry with hard stone laid dry in foundation, plinth &
walls Laid with bond stone | 345.87 | Cum | 4,010.9 | ₹13,87,249.98 | item 05 |
| 6 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size). | 472.5 | Sqm | 486.19 | ₹2,29,724.78 | item 06 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 153.2 | Sqm | 6,606.08 | ₹10,12,018.43 | item 07 |
| 8 | Providing and laying of MS pipe of 300 mm dia carriage all complete job. | 8 | Nos | 21,186.44 | ₹1,69,491.52 | item 08 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 598.5 | Sqm | 306.15 | ₹1,83,230.78 | item 09 |
| 10 | Carriage of material by MT from source to site of work, incl. loading, unloading complete job. a)Cement an avg lead upto 02 km | 73.55 | MT | 135.27 | ₹9,949.11 | item 10 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_45076.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid