| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr Quoted ₹1.6 Cr | L1 | Accepted-AOC Work order issued |
| 2 | L2₹1.6 Cr+₹1.6 L (1.06%)Rejected-Finance 142 SECTOR 16 AVAS VIKAS COLONY FRONT OF RAILWAY LINE SIKANDRA AGRA AGRA UTTAR PRADESH 282007 | AGRA | UTTAR PRADESH | 282007 | ₹1.6 Cr+₹1.6 L (1.06%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.6 Cr+₹6.9 L (4.44%)Rejected-Finance 288 B AZAAD NAGAR NAHAR ROAD NEAREST PNB RUSTAMPUR DISTRICT GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | ₹1.6 Cr+₹6.9 L (4.44%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical GORAKHPUR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | - | - | Rejected-Technical Technical Evaluation Dis Qualify |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technical Evaluation Dis Qualify |
Tender Value
Refer Docs
EMD Value
₹3.3 L
Closing Date
27 Feb 2026, 5:00 pmClosed
EE
Nagar Nigam Gorakhpur
Ward 02 semara marg om globle se goddhoiya pulliya hote huye semra puliya tak hot mix plant dwara sadak aur rcc nali ka nirman
2026_DOLBU_1116698_1
Ward 02
Open Tender
Civil Works
Percentage
180 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Nagar Nigam Gorakhpur
₹3.3 L
14 May 2026
16 Feb 2026
28 Feb 2026
16 Feb 2026
27 Feb 2026
16 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A | |||||
| 1.01 | Dismantling of RCC slab incl all | 38 | Cum | 850 | ₹32,300 |
| 1.02 | Earth work in excavation in foul position soil lead 50mt.& lift 1.5 mt. incl. lab. T&P etc all complete . | 1,180.19 | Cum | 120 | ₹1,41,622.8 |
| 1.03 | P/L of base concrete in 1:4:8 with cement, L-Sand and 40mm S/B including mat. Lab. T&P,etc all complete. | 94.42 | Cum | 5,435 | ₹5,13,145.53 |
| 1.04 | RCC Work with cement concrete (1:1.5:3) including all completion of work. | 398.01 | Cum | 9,082 | ₹36,14,726.82 |
| 1.05 | M.S or iron work in renforcement cutting bending , binding ,and placeing incl. etc. all. | 329.84 | qtl | 7,690 | ₹25,36,469.6 |
| 1.06 | Scraping of old damaged existing H.M.P. road surface by JCB Machine including T&P ,etc all complete. | 30 | Hrs | 920 | ₹27,600 |
| 1.07 | S/Laying of GSB 53.-9.5 mm thick S/B upto 15Cm loose Layer including etc. all complete of work. | 903 | Cum | 3,134.25 | ₹28,30,227.75 |
| 1.08 | Consolidation of GSB upto 10 cm thick loose layer by Road Roller including etc. all.complete. | 903 | Cum | 295 | ₹2,66,385 |
| 1.09 | Water allowance to be allowed on above incl.Lab. T&P,etc all complete. | 903 | Cum | 34.5 | ₹31,153.5 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.67 MB
r.pdf
Tender Documents • 2.65 MB
BOQ_2074173.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .