| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.2 LAdmitted-Fee/PreQual/Technical/Finance | -6.00% | ₹8.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹8.2 L+₹8,680.46 (1.06%)Admitted-Fee/PreQual/Technical/Finance | -5.00% | ₹8.2 L+₹8,680.46 (1.06%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹9.1 L+₹95,398.24 (11.7%)Admitted-Fee/PreQual/Technical/Finance | +4.99% | ₹9.1 L+₹95,398.24 (11.7%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹9.2 L+₹1.1 L (13.4%)Admitted-Fee/PreQual/Technical/Finance HARIPUR COLLIERY PANDAVESHWAR SATGRAM 713378 WEST BENGAL INDIA | SATGRAM | PASCHIM BARDHAMAN | WEST BENGAL | 713378 | +6.55% | ₹9.2 L+₹1.1 L (13.4%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.7 L
EMD Value
₹10,900
Closing Date
4 Jul 2026, 4:00 pmClosed
Area Engineer Civil Kenda Area
Office of the General Manager, Kenda Area
Repairing of road from CL Jambad office para towards Bahula market at Kenda Area
2026_ECL_361283_1
ECL/GM/Knd/AE(C)/ e-tender/26-27/16
Open Tender
Civil Works - Roads
Percentage
45 days
CL Jambad
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,900
Yes
6 Jul 2026
23 Jun 2026
6 Jul 2026
23 Jun 2026
4 Jul 2026
24 Jun 2026
23 Jun 2026 - 30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 230.44 | cum | 128.35 | ₹29,577.23 |
| 1.02 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 15.19 | cum | 1,061.6 | ₹16,126.77 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 27.75 | cum | 6,458.3 | ₹1,79,243.66 |
| 1.04 | Dismantling of cement concrete platform along with curtain walls and base concrete etc. including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead : 210 x 120 cm (outside to outside) | 96.87 | each | 1,039.55 | ₹1,00,705.37 |
| 1.05 | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 10.37 | cum | 7,929.3 | ₹82,210.98 |
| 1.06 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 7.01 | cum | 6,903.9 | ₹48,382.53 |
| 1.07 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 4.84 | sqm | 269.3 | ₹1,303.41 |
| 1.08 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars | 1,476.96 | kg | 95.75 | ₹1,41,418.92 |
| 1.09 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,598.4 | kg | 85.5 | ₹1,36,663.2 |
| 2Total impact of GST for the purpose of CTC | |||||
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.91 MB
Tendernotice_2.pdf
PDF • 1.38 MB
BOQ_374163.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .