| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.2 CrAccepted-AOC | ₹3.2 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹3.2 Cr+₹5.3 L (1.66%)Rejected-AOC FARIDPUR PACHKHORA BALLIA U P | BALLIA | BALLIA | UTTAR PRADESH | ₹3.2 Cr+₹5.3 L (1.66%) | 2 | Rejected-AOC L2 |
| 3 | 3₹3.3 Cr+₹14.8 L (4.68%)Rejected-AOC 6 OM COMPLEX BHUJ BHACHAU BYPASS DABDA ROAD ANJAR KUTCH 370110 | ANJAR | KUTCH | GUJARAT | 370110 | ₹3.3 Cr+₹14.8 L (4.68%) | 3 | Rejected-AOC L3 |
| 4 | 4₹3.6 Cr+₹40.6 L (12.8%)Rejected-AOC NAN | ₹3.6 Cr+₹40.6 L (12.8%) | 4 | Rejected-AOC L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not qualified due to insufficient Similar work experience certificate uploaded as per eligibility criteria |
| Sl No | Description | Qty | Unit | M/s Bajrang Construction & Suppliars L4 | ARUN CONSTRUCTION L1 | Pratap Construction L2 | VELJI RATNA SORATHIA INFRA PVT. LTD L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantaling of R.C.C.Slab , including cost of labour, T&P, etc., complete in all respects, as per direction and to the full satisfaction of the Engineer-in-Charge. | 8.23 | Cum | 674.8 ₹5,553.6 | 500 ₹4,115 | 481 ₹3,958.63 | 450 ₹3,703.5 Lowest |
| 2.00 | Dismantaling of old Brick work & R.B.Slab, including cost of labour, T&P, etc., complete in all respects, as per direction and to the full satisfaction of the Engineer-in-Charge. | 34.44 | Cum | 421.76 ₹14,525.41 | 400 ₹13,776 | 393 ₹13,534.92 | 280 ₹9,643.2 Lowest |
| 3.00 | Earth work in Mar, Ranker & Kankar mixed soil for excavation foundation , including cost of labour, T&P, etc., complete in all respects, as per direction and to the full satisfaction of the Engineer-in-Charge. | 6,163.11 | Cum | 97.26 ₹5,99,424.08 | 65 ₹4,00,602.15 Lowest | 70 ₹4,31,417.7 | 65 ₹4,00,602.15 Lowest |
| 4.00 | C.C. 1 : 3: 6 with Stone Grit (20-40 mm) size including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. | 591.05 | Cum | 5,344.76 ₹31,59,020.4 | 4,500 ₹26,59,725 | 4,400 ₹26,00,620 Lowest | 5,900 ₹34,87,195 |
| 5.00 | C.C. 1 : 2 : 4 with Stone Grit(10-20 mm) size , including cost of labour, T&P, etc., complete in all respects, as per direction and to the full satisfaction of the Engineer-in-Charge. | 635.64 | Cum | 6,074.71 ₹38,61,328.66 | 5,000 ₹31,78,200 | 4,600 ₹29,23,944 Lowest | 6,500 ₹41,31,660 |
| 6.00 | Brick work in 1:4 cement, mortar, including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. | 1,526.78 | Cum | 5,414.34 ₹82,66,506.03 | 5,500 ₹83,97,290 | 4,180 ₹63,81,940.4 Lowest | 5,800 ₹88,55,324 |
| 7.00 | Centering & Shuttering for R.C.C. work , including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. | 988.03 | Sqm | 514.62 ₹5,08,460 | 400 ₹3,95,212 | 713 ₹7,04,465.39 | 350 ₹3,45,810.5 Lowest |
| 8.00 | Reinforcement for R.C.C work in slab binding placing in position with G.I wire, including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. | 6.47 | M.T. | 77,308.81 ₹5,00,033.38 | 8,000 ₹51,744 | 6,500 ₹42,042 Lowest | 77,000 ₹4,98,036 |
| 9.00 | R.C.C. 1 : 1.5 : 3 with Stone Grit (10-20 mm) size, including cost of labour, T&P, etc., complete in all respects, as per direction and to the full satisfaction of the Engineer-in-Charge. | 75.16 | Cum | 7,197.93 ₹5,40,996.42 | 8,000 ₹6,01,280 | 5,246 ₹3,94,289.36 Lowest | 8,500 ₹6,38,860 |
| 10.00 | Deep struck Pointing 1:2 Cement, Mortar including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. | 2,906.67 | Sqm | 109.13 ₹3,17,204.9 | 100 ₹2,90,667 | 98 ₹2,84,853.66 Lowest | 120 ₹3,48,800.4 |
Tender Value
₹4.2 Cr
EMD Value
₹8.4 L
Closing Date
13 Apr 2026, 3:00 pmClosed
Superintending Engineer, Fourth Circle, Irrigation
Office of the Superintending Engineer, Fourth Circle civil line station road Jhansi
Lot 2- Restoration of Khaksis Distributary between Km 0.000 and Km 16.200 and demarcation of canal land in District Jalaun.
2026_UPIDC_1129127_2
07/SE-IV/2025-26
Open Tender
Civil Works - Canal
Item Rate
540 days
Jalaun
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,980
₹8.4 L
5 May 2026
27 Mar 2026
13 Apr 2026
27 Mar 2026
13 Apr 2026
27 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantaling of R.C.C.Slab , including cost of labour, T&P, etc., complete in all respects, as per direction and to the full satisfaction of the Engineer-in-Charge. | |||||
| 2 | Dismantaling of old Brick work & R.B.Slab, including cost of labour, T&P, etc., complete in all respects, as per direction and to the full satisfaction of the Engineer-in-Charge. | 1 | Cum | - | - |
| 3 | Earth work in Mar, Ranker & Kankar mixed soil for excavation foundation , including cost of labour, T&P, etc., complete in all respects, as per direction and to the full satisfaction of the Engineer-in-Charge. | 1 | Cum | - | - |
| 4 | C.C. 1 : 3: 6 with Stone Grit (20-40 mm) size including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. | 1 | Cum | - | - |
| 5 | C.C. 1 : 2 : 4 with Stone Grit(10-20 mm) size , including cost of labour, T&P, etc., complete in all respects, as per direction and to the full satisfaction of the Engineer-in-Charge. | 1 | Cum | - | - |
| 6 | Brick work in 1:4 cement, mortar, including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. | 1 | Cum | - | - |
| 7 | Centering & Shuttering for R.C.C. work , including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. | 1 | Sqm | - | - |
| 8Reinforcement for R.C.C work in slab binding placing in position with G.I wire, including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. | |||||
| 9 | R.C.C. 1 : 1.5 : 3 with Stone Grit (10-20 mm) size, including cost of labour, T&P, etc., complete in all respects, as per direction and to the full satisfaction of the Engineer-in-Charge. | 1 | Cum | - | - |
| 10Deep struck Pointing 1:2 Cement, Mortar including cost of all materials, labour, T&P, etc., complete in all respects, as per direction of the Engineer-in-Charge. | |||||
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.62 MB
BOQ_2108843.xls
BOQ • 0.33 MB
07SEIVNIT2025-6.pdf
Tender Documents • 2.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .