Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance | -11.00% | ₹1.2 L | L1 | Admitted-Finance |
| 2 | L2₹1.3 L+₹5,313.68 (4.37%)Admitted-Finance | -7.11% | ₹1.3 L+₹5,313.68 (4.37%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical H NO 553 B 4 SHIV NAGAR JAMMU JAMMU KASHMIR 180001 | JAMMU | JAMMU AND KASHMIR | 180001 | - | - | - | Rejected-Technical Not Qualified in terms and conditions of e-NIT |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Not Qualified in terms and conditions of e-NIT |
Tender Value
₹1.4 L
EMD Value
₹2,720
Closing Date
12 Aug 2026, 6:00 pmClosed
Executive Engineer
BC Road Jammu
As refer boq
2026_PHE_319451_9
e-NIT No. 19 of 2026-27
Open Tender
Civil Works
Percentage
30 days
BC Road Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Chief Engineer JSD PHE Deptt. jammu
₹2,720
10 Sept 2026
4 Aug 2026
13 Aug 2026
4 Aug 2026
12 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping and sand papering and preparing the surface smooth
including necessary repairs to scratches etc. complete. | 309.87 | sqm | 18.7 | ₹5,794.57 |
| 2 | Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50grams/liter | 309.87 | sqm | 64.15 | ₹19,878.16 |
| 3 | Finishing walls with water proofing cement paint of required shade: Old work(one or more coats [email protected]/10sqm)complete | 309.87 | sqm | 64.45 | ₹19,971.12 |
| 4 | Providing and fixing double scaffolding system (cup locktype) on the exterior side, upto seven storey height made with 40mm dia M.S.tube
1.5 m centre to centre horizontal and vertical tubes joining with cup andlock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S.stair case system in the scaffoldings for working plat form etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall best iffened with bracings, runners, connection with the building etc. wherever required for inspection of work at required locations with essential safety features forthe workmenetc complete as per directions and approval of Engineer-in-charge.The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made on ceir respective of duration of scaffolding.
NOTE:-To be used for maintenance work judicially necessary deduction for scaffolding in the existing item to bed one | 294.55 | sqm | 265.3 | ₹78,144.12 |
| 5 | Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With ready mixed pink or grey primer onwood work (hard andsoftwood) having VOC contentless than 50grams/liter | 5.6 | sqm | 63.8 | ₹357.28 |
| 6 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade, one or more coats on old work. | 5.6 | sqm | 86.75 | ₹485.8 |
| 7 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 gradedstoneaggregate) finished with a floating coat of neat cement including cementslurry and curing complete, but excluding the cost of nosing of steps etc.complete. 25mmthick with 12.5mm nominal size stone aggregate. | 11.57 | sqm | 409.25 | ₹4,735.02 |
| 8 | Making plinth protection 50mm thic kof cement concrete 1:3:6 (1 cement: 3coarses and: 6 graded stone aggregate 20 mm nominal size) over 75mm bed of dry brick ballast 40mm nominal size well rammed and consolidated and grouted with fines and including finishing the top smooth and curing complete | 11.66 | sqm | 572.8 | ₹6,678.85 |
| 9 | Carriage of sand /stone aggregate below 40mm from source (to be identified by Engineer in charge) to site of work including loading , unloading & stacking for an av. Distance 20 km by MT. | 1.35 | Cum | 409.94 | ₹553.42 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
BOQ_1058194.xls
BOQ • 0.24 MB
disttcorr.pdf
PDF • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .