Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹33.7 L
EMD Value
₹33,700
Closing Date
16 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director, DRDA
DRDA, Collectorate Campus, Vengikkal, Tiruvannamalai
Providing Infrastructure Development works to AGAMT 2021-22 Village Panchayat at Vadapoondipattu Panchayat of Cheyyar Block in Package No. TVM/2021-22/157 Tiruvannamalai District
2022_RDTN_239926_1
Roc.No.1250/2022/A13 Dt.22.06.2022 157
Open Tender
Civil Works
Lump-sum
180 days
Cheyyar
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹33,700
24 Aug 2022
7 Jul 2022
16 Aug 2022
7 Jul 2022
16 Aug 2022
7 Jul 2022
45 days
Amount
Part I :Providing Paver block (85mt)@ Ambedkar street Vadapoondipattu ADC in Vadapoondipattu panchayat
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .GSB Grading III
Flooring with paver block 60 mm thickness laid over, interlocking blocks including cost and conveyance and all labour charges for 10 m2
Part II : Providing Paver block (35mt)@ Cross Street Vadapoondipattu ADC in Vadapoondipattu panchayat
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .GSB Grading III
Flooring with paver block 60 mm thickness laid over, interlocking blocks including cost and conveyance and all labour charges for 10 m2
Part III : Construction of Girls Toilet @ PUMS in Vadapoondipattu Panchayat
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Supply Filling in foundation and basement with excaveted earth including cost and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation etc complete
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete.
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete - Above GL
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete - Above GL
Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works
Special Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Ceramic tiles flooring laying with new ceramic tiles of size 300x300x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2 20mm thick and pointing with white cement 0.4kg/sqm mixed with colouring pigment to suit the colour of the tiles including finishing the joint neatly complying with std specification
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion two coats with best approved Plastic Emulsion including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Supplying and fabrication of the following steel doors , window,Ventilators and counter including cost and conveyance and all charges etc complete.
Steel Door -D1 0.90X1.8
Steel Door -D1 0.75.X1.20
Cost and supply of European water closet with "P" or "S" trap etc., complete.
Supplying and fixing in position best quality and approved make Indian made white / colour glazed earthernware wash hand basin of size 550 x 400mm (with pedestal / without pedestal) with a pair of cast iron brackets, including cost 15mm dia brass CP pillar tap, 32mm dia "B" class GI waste pipe with rubber plug and chain, 15mm dia GM wheel valve, 15mm brass nipple, 15mm dia nylone connection, 32mm dia CP brass waste coupling including fixing of wash basin using CI brackets on to the wall in position with TW plugs and screws, rubber washers, white lead and giving necessary water supply connection and painting the brackets with two coat of painting over a priming coat of anti-corrosive paint including testing for leakages etc., complete complying with standard specification and as directed by the departmental officers. (The wash hand basin and specials should be got approved by the Executive Engineer before use on
Urinals
Wash basion
25mmPVC Pipe
25mmPVC bend
25mmPVC tee
90mmPVC Pipe
90mmPVC bend
90mmPVC tee
63mm PVC pipe
Earth work excavation in Hard stiff gravely soil for narrow foundation with initial lead and lift as per SS 20 B,etc complete
Towards Labour Charges for Laying of Pvc Pipes and specials including all labour charges etc complete.
Refilling the excavated earth to the Pipe line trench including all labour charges etc complete.
Provision for Electrification
for PVC concealed light / Fan Point (For electronic regulator) (5 Points Per Coil) Concealed (SD 25)
Supply and fixing of fancy glass shade and 11W CFL for BH point. (SD 80)
Wiring with 2x1.50 sqm PVC insulated unsheated Sc.alu Cable of conductor of 1100V grade insulated for open plug point .(SD38)
Supply and fixing run off 2x1.50sqm PVC insulated Sc . Un sheated Sc conductor of 1100 v grade on 7/20 GI Bearer wire for Service Main(SD64)
Part IV : Construction Kitchen shed @ PUES in Vadapoondipattu Panchayat (Type I)
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Supply Filling in foundation and basement with Filling Sand including cost and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation etc complete
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete.
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete - Above GL
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete - Above GL
Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works
Special Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Granolethic floor finish with cement concrete 1:2:4 mix using 10-12mm ISS chips including cost and conveyance of all materials and all labourcharges etc, complete.
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion two coats with best approved Plastic Emulsion including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Supplying and fixing of Cuddapha Slab including cost and conveyance and all charges etc complete.
Supplying and fabrication of the following steel doors , window,Ventilators and counter including cost and conveyance and all charges etc complete.
Steel Door -D 1.00x2.1m
Steel Door -D1 0.90X2.10m
Steel Window -W 0.90x1.20m
Steel Ventilator 0.60x0.60m
Provision for Water supply Arrangements
25mm PVC pipe
25mm PVC Elbow
25mm PVC Coupling
32mm PVC Pipe
63mm PVC pipe
63mm PVC Elbow
63mm PVC Coupling
25mm GM Gate valve
Earth work excavation in Hard stiff gravely soil for narrow foundation with initial lead and lift as per SS 20 B,etc complete
Towards Labour Charges for Laying of Pvc Pipes and specials including all labour charges etc complete.
Refilling the excavated earth to the Pipe line trench including all labour charges etc complete.
Part V : Construction of Anganwadi building's in Vadapoondipattu Panchayat
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Supply Filling in foundation and basement with US Gravel including cost and conveyance of all materials to site and all labour charges etc complete
Supply Filling in foundation and basement with Filling Sand including cost and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation etc complete
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete.
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete - Above GL
Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works
Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc
Terrace flooring with one coarce of old &new machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same
Special Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Ceramic tiles flooring laying with new ceramic tiles of size 300x300x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2 20mm thick and pointing with white cement 0.4kg/sqm mixed with colouring pigment to suit the colour of the tiles including finishing the joint neatly complying with std specification
Granolethic floor finish with cement concrete 1:2:4 mix using 10-12mm ISS chips including cost and conveyance of all materials and all labourcharges etc, complete.
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion two coats with best approved Plastic Emulsion including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Supplying and fabrication of the following steel doors , window,Ventilators and counter including cost and conveyance and all charges etc complete.
Steel Door -D1 0.90X2.10
Steel Door -D1 1.10.X2.10
Steel Door -D1 0.75.X1.20
Window 1.20X1.30
Ventilator 0.90X0.45
Labour Charges for Fixing the Doors inculding all Charges etc..
Labour Charges for Fixing theSteel Window inculding all Charges etc..
Wiring with 2x1.5(22/0.3) sqmm PVC unsheathed SC Copper conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with T.W. switch box with 5amps F.T. switch in flush with wall covered with hylum sheet of 3mm thick with painting of suitable colour with continuous earth wireconnection of 14 SWG wire for cocealed Light point/fan point (5 points per coil) [ SD No. 24 ]
Wiring with 2x1.5(22/0.3) sqmm PVC unsheathed SC Copper conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with 150×100×113mmTW switch box for 5A - 3 pin- non inter locking CS plug Including pin top with painting of suitable colour with continuous earth wire connection of 14 SWG TC wire for concealed PVC Plug Point [SD NO 37 ]
Supply and Run of 2X1.5Sqmm PVC Insulated SC Unsheathed copper Conductor of 1100V grade 25mm dia GI Pipe (Clss B) Sutiably bent at both ends with necessary angles iron upright and End Support for main SD 70
Supplying and fixing of Ceiling FAN
Bulk head Fitting
Cost and supply of Oriya type Indian baby friendly water closet with "P" or "S" trap etc., complete. ( White )
Cost and supply of European water closet with "P" or "S" trap etc., complete.
Supplying and fixing in position best quality and approved make Indian made white / colour glazed earthernware wash hand basin of size 550 x 400mm (with pedestal / without pedestal) with a pair of cast iron brackets, including cost 15mm dia brass CP pillar tap, 32mm dia "B" class GI waste pipe with rubber plug and chain, 15mm dia GM wheel valve, 15mm brass nipple, 15mm dia nylone connection, 32mm dia CP brass waste coupling including fixing of wash basin using CI brackets on to the wall in position with TW plugs and screws, rubber washers, white lead and giving necessary water supply connection and painting the brackets with two coat of painting over a priming coat of anti-corrosive paint including testing for leakages etc., complete complying with standard specification and as directed by the departmental officers. (The wash hand basin and specials should be got approved by the Executive Engineer before use on
Provision of Rainwater Pipe
Supply and fixixng of 1000 litre HDPE tank
Provision for PVC and GI Pipe and Specials for Water supply and Sanitary arrangment
25mm PVC pipe
25mm PVC Elbow
25mm PVC Coupling
32mm PVC Pipe
63mm PVC pipe
63mm PVC Elbow
63mm PVC Coupling
25mm GM Gate valve
Earth work excavation in Hard stiff gravely soil for narrow foundation with initial lead and lift as per SS 20 B,etc complete
Towards Labour Charges for Laying of Pvc Pipes and specials including all labour charges etc complete.
Refilling the excavated earth to the Pipe line trench including all labour charges etc complete.
Part VI :Construction of Threasing floor near Ramar koil @ Vadapoondipattu Panchayat
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Supply Filling in foundation and basement with Filling Sand including cost and conveyance of all materials to site and all labour charges etc complete
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
C.C. 1:2:4 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Provision for Bittuman Pad
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SRK Construction
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .