Loading…
Loading…
Tender Value
₹39.7 L
EMD Value
₹79,500
Closing Date
10 Jul 2026, 5:00 pm2d left
GM P
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Repair and Resurfacing work from Sector-32, Road No. 18 to Village Veerampur, YEIDA WC-06
2026_YEIDA_1164740_13
YEA/GM(PROJECT)/2026/531 DT-24/06/2026
Open Tender
Civil Works
120 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
REFER TENDER DOC
5 documents required · 5 mandatory
₹990
₹79,500
1 Jul 2026
1 Jul 2026
14 Jul 2026
1 Jul 2026
10 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift up to 1.5 m. DAR/18/2.28 based on UPPWD SOR 2020 | - | Sqm | - | - |
| 2 | Dry brick on edge flooring in required pattern with bricks of class designation 150 including filling joints with local stand (With F.P.S bricks) complete . | - | Sqm | - | - |
| 3 | Supplying and stacking at site. 63 mm to 45 mm size stone aggregate. UPPWD SOR2020/DAR/16.3.2 | 1 | Cum | 1 | ₹1 |
| 4 | Supplying and stacking at site. 53 mm to 22.4 mm size stone aggregate. UPPWD SOR2020/DAR/16.3.3 | 1 | Cum | - | - |
| 5 | Supply and stacking of moorum at site UPPWD SOR2020/DAR/16.3.10 | - | Cum | - | - |
| 6 | Laying spreading and compacting stone aggregate of specified sizes to WBM specifications including spreading in uniform thickness, hand picking, rolling with 3 wheeled road I vibratory roller 8-10 tonne in stages to proper grade and camber, applying and brooming requisite type of screening I binding material to fill up interstices of coarse aggregate watering and compacting to the required density. UPPWD SOR2020/DAR/17.6.1 | - | Cum | - | - |
| 7 | Providing and applying tack coat on the prepared surface with bitumen VG10 Using bitumen Preusser distributer and spraying on bitumen boiler including cleaning, preparing the existing road surface as per specifications at the rate of 0.25 kg per sqm (MORTH-503(b)/AR/YEIDA) MORTH 2019/5.02/503 | - | Sqm | - | - |
| 8 | Providing and laying dense graded bitumen macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder 60/70 @ 4.25% of mix and filler transporting the hot mix to work site, laying with hydrostatic paver finisher with sensor control to the required grade, level, and alignment rolling with smooth, wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause 507 complete in all respects. (MORTH/507) (A.R./YEIDA) 40mm compacted thickness with bitumen penetration of 60/70 @ 4.25% by weight of total mix. | - | Cum | - | - |
| 9 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.0 per cent of mix and filler transporting the hot mix to work site, laying with hydrostatic paver finisher with sensor control to the required grade, level, and alignment rolling with smooth, wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause 509 complete in all respects. (MORTH-509/AR/YEIDA) 30mm compacted thickness with bitumen penetration of CRMB-55 @ 5% by weight of total mix | 1 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.17 MB
13.pdf
Tender Documents • 2.39 MB
BOQ_2185091.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid