Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.7 LAccepted-AOC | ₹4.7 L | 1 | Accepted-AOC L1 |
| 2 | Rejected-Technical KHANDRA BARDHAMAN 713363 WEST BENGAL INDIA | KHANDRA | BARDHAMAN | WEST BENGAL | 713363 | - | - | Rejected-Technical Not as per NIT |
| 3 | Rejected-Technical 59 R G S ROAD USHAGRAM DURGAMANDIR ASANSOL BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | - | - | Rejected-Technical Not As per NIT |
| Sl No | Description | Qty | Unit | NEW ELECTRICAL CONCERN L1 |
|---|---|---|---|---|
| 1.00Items Description | ||||
| 2.00Complete repairing & rewinding Stator & Rotor Portion of 125kW, 3.3kV, 1480 RPM Yaskawa Electric make 3-phase Slip Ring HT Pump-Motor of Narsamuda Colliery under Sodepur Area. | ||||
| 2.01 | New conductor with Super Enamel double glass copper strip | 165 | Nos. | 905 ₹1.5 L |
| 2.02 | Complete dismantling of Motor | 1 | Nos. | 2,800 ₹2,800 |
| 2.03 | Old coils removal from slot | 1 | Nos. | 4,000 ₹4,000 |
| 2.04 | Cleaning and filling all slots and petrol wash | 1 | Nos. | 2,500 ₹2,500 |
| 2.05 | Glass Mica Polyester tape | 62 | Nos. | 280 ₹17,360 |
| 2.06 | Nomex paper for slot insulating | 1 | Nos. | 6,000 ₹6,000 |
| 2.07 | Baking and finishing varnish | 5 | Nos. | 600 ₹3,000 |
| 2.08 | Cost of Thinner | 3 | Nos. | 350 ₹1,050 |
Tender Value
₹4.3 L
EMD Value
₹5,400
Closing Date
3 Jan 2026, 3:05 pmClosed
Area Engineer(EnM)
Area Engineer(EnM), Sodepur Area
Complete repairing and rewinding Stator and Rotor Portion of 125kW, 3.3kV, 1480 RPM Yaskawa Electric make 3-phase Slip Ring HT Pump-Motor of Narsamuda Colliery under Sodepur Area.
2025_ECL_350013_1
ECL/SDPA/AE(EnM)/e/25-26/301 dt.12.12.2025
Open Tender
Miscellaneous Works
10 days
Sodepur Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,400
29 May 2026
24 Dec 2025
5 Jan 2026
24 Dec 2025
3 Jan 2026
24 Dec 2025
24 Dec 2025 - 27 Dec 2025
New conductor with Super Enamel double glass copper strip
Complete dismantling of Motor
Old coils removal from slot
Cleaning and filling all slots and petrol wash
Glass Mica Polyester tape
Nomex paper for slot insulating
Baking and finishing varnish
Cost of Thinner
H' class insulating materials
Motor coil connection brazing with siphons rod
After rewinding, heating, baking, of stator coil for improvement of IR value & de-moistening
Double glass connection lead and socket
Both side end cover by metal depositing & machining as per bearing size
Greasing & assembling of motor with required nuts, bolts, paints, etc. hardware materials
Less. Scrap value of unused copper conductor
Dismantling of complete Motor including Pulley, Rotor, Bearing Fan etc.
Dismantling of all Rotor strip from Rotor slot
New electrolyte grade copper strip against burn strip
Formation of new Rotor
F' class insulating materials
Industrials gas & brazing rod for Rotor bar with both end ring
Binding the both end of the Rotor by glass epoxy materials
Heating and baking properly of all stator coil for improvement of insulation resistance value and varnishing by 'F' class insulating varnish with overhauling & testing
Complete assembling of motor including fitting of bearing pulling & fan etc
Cost of New Bearing (6318 M/C3)
Less. Scrap value of unused copper conductor
Labour charges for formation of new coils for Stator & Rotor and complete fitting in core slot, inter connection etc.
Overhead & profit @10%
Add. CMPF/EPF @ 12% on Labour charges
Add. Bonus @ 8.33% on Labour charges 8.33%
Add. Pension @ 7% on Labour charges
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.57 MB
Tendernotice_2.pdf
PDF • 1.21 MB
BOQ_362764.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid