Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 CrAdmitted-Finance | -18.55% | ₹3.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.8 Cr+₹1.0 L (0.27%)Admitted-Finance | -18.33% | ₹3.8 Cr+₹1.0 L (0.27%) | L2 | Admitted-Finance |
| 3 | L3₹3.8 Cr+₹2.4 L (0.64%)Admitted-Finance | -18.03% | ₹3.8 Cr+₹2.4 L (0.64%) | L3 | Admitted-Finance |
| 4 | L4₹3.8 Cr+₹3.1 L (0.82%)Admitted-Finance | -17.88% | ₹3.8 Cr+₹3.1 L (0.82%) | L4 | Admitted-Finance |
| 5 | L5₹3.8 Cr+₹4.7 L (1.23%)Admitted-Finance | -17.55% | ₹3.8 Cr+₹4.7 L (1.23%) | L5 | Admitted-Finance |
Tender Value
₹4.7 Cr
EMD Value
₹9.3 L
Closing Date
23 Sept 2024, 6:00 pmClosed
EE, PWD Dn. III, Pratapgarh
EE, PWD Dn. III, Pratapgarh
Construction of Road Dhamotar Bori Bhuwasiya Gadol Road
2024_CEPWD_420715_1
ACE, PWD Zone-II, Udaipur(Basnwara) NIT 05/2024-25
Open Tender
Civil Works
Percentage
240 days
Pratapgarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
EE, PWD Dn. III, Pratapgarh by eGRAS Challan
₹9.3 L
Yes
1 Oct 2024
19 Sept 2024
24 Sept 2024
19 Sept 2024
23 Sept 2024
19 Sept 2024
eProcurement System Government of Rajasthan Created By: Suresh Chandra Meena Created Date/Time: 01-Oct-2024 05:45 PM Tender Title: Construction of Road Dhamotar Bori Bhuwasiya Gadol Road Tender ID: 2024_CEPWD_420715_1
Tender Inviting Authority: ADDL. CHIEF ENGINEER, PWD ZONE-II UDAIPUR (BANSWARA)
Name of Work: Construction of BT Road Dhamotar Bori Bhuwasiya Gadol Road Km 0/0 to 9/000
Contract No: ACE NIT NO. 05/2024-25
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 M/S BALAJI CONSTRUCTION - SANTOSH KUMAR PATIDAR (GSTN-08CARPP1697R1ZD) BID ID -2935441 46622256.69 -18.33 38076397.04 Three Crore Eighty Lakh Seventy Six Thousand Three Hundred and Ninty Seven
2.00 M/s UMESH CONSTRUCTION (GSTN-08ACIPB5921H1ZS) BID ID -2935920 46622256.69 -15.99 39167357.85 Three Crore Ninty One Lakh Sixty Seven Thousand Three Hundred and Fifty Seven
3.00 Shree Sanwaliya Construction (GSTN-08BYKPS5994N1Z5) BID ID -2935928 46622256.69 -18.55 37973828.07 Three Crore Seventy Nine Lakh Seventy Three Thousand Eight Hundred and Twenty Eight
4.00 Ranawat Construction (GSTN-08ADOPR1731L1Z3) BID ID -2935939 46622256.69 -13.76 40207034.17 Four Crore Two Lakh Seven Thousand Thirty Four
5.00 M/S VIRAT ENTERPRISES (GSTN-08AGMPA7534M1Z1) BID ID -2935945 46622256.69 -17.88 38286197.19 Three Crore Eighty Two Lakh Eighty Six Thousand One Hundred and Ninty Seven
6.00 Rajshree Construction (GSTN-08AHCPT8224A1ZI) BID ID -2936293 46622256.69 -18.03 38216263.81 Three Crore Eighty Two Lakh Sixteen Thousand Two Hundred and Sixty Three
7.00 M/s Sumit Enterprises (GSTN-08ASQPR6626P1ZM) BID ID -2936626 46622256.69 -17.55 38440050.64 Three Crore Eighty Four Lakh Fourty Thousand Fifty
Lowest Amount Quoted BY: Shree Sanwaliya Construction(37973828.07)
BOQ Summary Details Tender Title: Construction of Road Dhamotar Bori Bhuwasiya Gadol Road Tender ID: 2024_CEPWD_420715_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Shree Sanwaliya Construction 37973828.07 L1
2 M/S BALAJI CONSTRUCTION - SANTOSH KUMAR PATIDAR 38076397.04 L2
3 Rajshree Construction 38216263.81 L3
4 M/S VIRAT ENTERPRISES 38286197.19 L4
5 M/s Sumit Enterprises 38440050.64 L5
6 M/s UMESH CONSTRUCTION 39167357.85 L6
7 Ranawat Construction 40207034.17 L7
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.65 MB
BOQ_755887.xls
BOQ • 0.27 MB
Financial_Bid.pdf
Tender Documents • 28.90 MB
Potential_BID_Dhamotar_Bori_Bhuwasiya.pdf
Tender Documents • 0.92 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .