Tender Value
₹11.2 L
EMD Value
₹22,448
Closing Date
2 Oct 2026, 3:00 pmDue today
Chief Executive Officer
Chief Executive Officer, South Goa Zilla Panchayat, Old Collectorate Bldg., 3rd Floor, Margao-Goa
Construction of toilet near to the Dudhsagar Temple for Public use art Sonaulim in V.P. Collem Shigao of Dharbandora Constituency
2026_ZP_31670_1
3/6/SGZP/2026-27/TN-191/L3
Open Tender
Civil Works - Buildings
Percentage
120 days
V.P. Collem
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
₹22,448
9 Sept 2026
9 Sept 2026
5 Oct 2026
9 Sept 2026
2 Oct 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. A)All kinds of soil | 25.47 | M3 | 291 | ₹7,411.77 |
| 2 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : A)All kinds of soil | 12 | M3 | 286 | ₹3,432 |
| 3 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 6.34 | M3 | 2,211 | ₹14,017.74 |
| 4 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a)All works upto plinth level | 7.27 | M3 | 6,810 | ₹49,508.7 |
| 5 | Centering & shuttering including Strutting, Propping & removal of forms for :i)Foundations, Footings, Bases for columns | 1.76 | M2 | 407 | ₹716.32 |
| 6 | Centering & shuttering including Strutting, Propping & removal of forms for :iii)Columns, Piers, Pillars, Aburments, Posts and struts (square rectangle polygon in plan) | 5.3 | M2 | 598 | ₹3,169.4 |
| 7 | iv)Sides and Soffits of beams, Beam Haunchings, Cantilever, Girders, bressumers and Lintels plinth beams not exceeding 1m in depth | 13.48 | M2 | 412 | ₹5,553.76 |
| 8 | Centering & shuttering including Strutting, Propping & removal of forms for : xiii)Suspended floors, roofs landings, shelves & their supports | 13.05 | M2 | 644 | ₹8,404.2 |
| 9 | Providing and laying in position (1:11/2:3) Reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement (1 cement: 1½ coarse sand:3 graded stone aggregate 20mm nominal size) A)All works upto plinth level | 0.54 | M3 | 7,178 | ₹3,876.12 |
| 10 | B) in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level | 0.27 | M3 | 8,034 | ₹2,169.18 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Tendernotice_2.pdf
PDF • 2.93 MB
Tendernotice_3.pdf
PDF • 1.03 MB
BOQ_32055.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .