| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.6 CrAdmitted-Finance | -4.06% | ₹9.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹10.7 Cr+₹1.1 Cr (11.2%)Admitted-Finance | +6.66% | ₹10.7 Cr+₹1.1 Cr (11.2%) | L2 | Admitted-Finance |
Tender Value
₹11.4 Cr
EMD Value
₹22.8 L
Closing Date
30 Jan 2023, 4:00 pmClosed
Executive Engineer RnB Division Kulgam
Executive Engineer RnB Division Kulgam
Construction of Tranist Accommodation for Kashmiri Migrant Employees at Mirhama Blocks G,H,I,J,K and L (Six Blocks)
2023_PWDJK_202560_2
162/RnB/Kulgam/13719-39 Dtd. 16-01-2023
Open Tender
Civil Works
Percentage
900 days
Kulgam
Please refer Tender documents.
10 documents required · 10 mandatory
₹11,000
MH 0059
₹22.8 L
Cheif Engineer PW (RnB) Kashmir, Srinagar
11 Feb 2023
16 Jan 2023
31 Jan 2023
16 Jan 2023
30 Jan 2023
16 Jan 2023
18 Jan 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in foundation trenches, drains, pipes, cables etc (not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plane, depth upto 1.5 mtr including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil . | 3,776.2 | Cum | 225.31 | ₹8,50,815.62 |
| 2 | Filling available excavated earth (excluding rock) in trenches,plinth,sides of foundation etc. in layers not exceeding20 cm in depth, consolidating by ramming and watering complete job. | 1,888.1 | Cum | 191.58 | ₹3,61,722.2 |
| 3 | Providing/Laying of stone soling handpacked in foundation trunches including dressing watering compacting and all carriage up to site of work complete job. | 250.8 | Cum | 789.47 | ₹1,97,999.08 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) including cost and carriage of all materials involved complete. | 249.3 | Cum | 4,563.95 | ₹11,37,792.74 |
| 5Providing and laying in position specified grades of reinforced cement concrete 1:1.5:3 in beams, slabs, walls(any thickness) including attached pillasters, buttresses, plinth and string courses, filets, columns, , stairs,pillars, piers, abutments, posts and struts etc. using 20mm thick crushed stone agg. Excluding the cost of centring, shuttering, finishing and reinforcement. All work upto plinth level | |||||
| 5.01 | All work upto plinth level | 685.26 | Cum | 6,831.93 | ₹46,81,648.35 |
| 5.02 | All work above plinth level | 1,421 | Cum | 8,428.75 | ₹1,19,77,253.75 |
| 6 | Reinforcement for RCC works including straightening, cutting, bending, binding & placing in position all complete. TMT reinforcement of grade Fe-500D steel bars at all levels. | 2,52,750 | Kg | 78 | ₹1,97,14,500 |
| 7Centering and shuttering including strutting, propping etc. and removal of form work for:- | |||||
| 7.01 | Raft Foundation etc. | 1,452.7 | Sqm | 251.18 | ₹3,64,889.19 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
Tendernotice_2.pdf
PDF • 1.15 MB
BOQ_541497.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .