Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹29.3 LAdmitted-Fee/PreQual/Technical/Finance AT BADAMANGA PO KALASPUR DIST KENDRAPARA 754239 | KALASPUR | KENDRAPARA | ODISHA | 754239 | -30.84% | ₹29.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹31.8 L+₹2.5 L (8.40%)Admitted-Fee/PreQual/Technical/Finance | -25.03% | ₹31.8 L+₹2.5 L (8.40%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹33.5 L+₹4.2 L (14.2%)Admitted-Fee/PreQual/Technical/Finance PLOT NO N 6 356 IRC VILLAGE NAYAPALLI BHUBANESWAR DIST KHORDHA | BHUBANESWAR | KHORDHA | ODISHA | -21.00% | ₹33.5 L+₹4.2 L (14.2%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹34.7 L+₹5.4 L (18.4%)Admitted-Fee/PreQual/Technical/Finance | -18.10% | ₹34.7 L+₹5.4 L (18.4%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹37.9 L+₹8.6 L (29.4%)Admitted-Fee/PreQual/Technical/Finance | -10.50% | ₹37.9 L+₹8.6 L (29.4%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹42.4 L
EMD Value
₹42,400
Closing Date
21 Aug 2026, 3:00 pmClosed
Executive Engineer (Central Tender Cell)
Central Tender Cell, BMC, ICOMC Tower, Unit-09, Satyanagar
Construction of Paver Block Road from Sani Mandir front towards Sameigadia in Ward No. 5
2026_ORULB_138148_3
BMC-EE-Tender Cell-48/2026-27 dt. 06.08.2026
Open Tender
Civil Works - Others
Percentage
120 days
BMC AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹42,400
Yes
Office chamber of the EE,Central Tender Cell
21 Aug 2026
10 Aug 2026
21 Aug 2026
10 Aug 2026
21 Aug 2026
10 Aug 2026
10 Aug 2026 - 14 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour for scrapping, cleaning the road surface applying tack coat using 3.00 Kg of bitumen for 10M2 and laying 75 mm. thick built up spray grouting in two layers 37.50 mm. thick each layer using 0.45 Cum of 25 mm. to 40 mm. size hard grauite metal and 12.00 kg penetration grade of bitumen for 10.00M2 in each layer with 0.12 Cum of 12 mm. chips as key stone for 10M2 spreading over and laying including heating pouring and spreading over and spreading bitumen metal and chips and rolling with P.R.R. including hire and running charges of P.R.R and all other machineries but including costs and conveyance of bitumen metal and chips as per specification and direction of Engineer-in-charge. | 115.5 | Sqm | 762.61 | ₹88,081.46 |
| 2 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including cleaning the road surface spraying primer @ of 0.60Kg/M2 using manual means including cleaning the surface and applying primer coat as per clause 502 of MoSRTSH specification. | 3,990 | Sqm | 63.05 | ₹2,51,569.5 |
| 3 | Providind and laying "BITUMINOUS MACADAM" with hot mix plant using crushed aggregates of specified grading premixed with Bituminous binder of 60/70 penetration grade of bitumen transportred to site laid over a previously prepared surface with a hydrostatic paver finisher with mechanical control to the required grade level and alignment and rolling with smooth wheeled vibrating and tandem rollers to achieve the desired compaction as per clause 504 of MoSRT&H specification for Road & Bridge works. | 219.45 | Cum | 10,374.26 | ₹22,76,631.36 |
| 4 | Providing and laying semi dense bituminous concrete with batch type hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen transporting the hot mix to work site laying with a hydro static paver finisher with mechanical control to the required grade, level and alignment rolling with smooth wheeled vibratory and tendem rollers to achieve the desired compaction as per clause 508 of MoSRT&H specification for road & bridge work. | 99.75 | Cum | 14,158.95 | ₹14,12,355.26 |
| 5 | C.C (1:2:4)with 12mm to 20mm size HG chips for CC/RCC works including all cost, conveyance, royalty & taxes etc. comp. of all materials to work site as per schedule item of work and the specification approved by the department & direction of Engg-in-charge | 18.09 | Cum | 7,744.33 | ₹1,40,094.93 |
| 6 | Road Marking with hot applied thermoplastic compound with refleat rising glass beads on bituminious surface etc complete.Providing and laying of hot applied thermoplastic compound 2.5mm thick including rafleat rising glass beads @ 250gms per sqmt area thickness of 2.5mm is exclusive of surface applied glass beads as per IRC-35. The finished surface to be level, uniform and free from streaks and holes etc complete. | 180.6 | Sqm | 362.84 | ₹65,528.9 |
| 7 | Cost of Display board,paint & Letter writing over display board | 1 | nos | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
finance_605070.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
DTCN_48.pdf
Tender Documents • 0.90 MB
BOQ_605070.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .