Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹183.8 CrAccepted-AOC 12 106 LAXMINAGAR GOPALAPATNAM GOPALAPATNAM VISAKHAPATNAM ANDHRA PRADESH 530027 | VISAKHAPATANAM | ANDHRA PRADESH | 530027 | ₹183.8 Cr | L1 | Accepted-AOC Approved by Government |
| 2 | L2₹194.6 Cr+₹10.8 Cr (5.87%)Rejected-AOC DWARIKA NAGAR REWA M P | ₹194.6 Cr+₹10.8 Cr (5.87%) | L2 | Rejected-AOC L2 |
| 3 | L3₹194.6 Cr+₹10.8 Cr (5.87%)Rejected-AOC CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | ₹194.6 Cr+₹10.8 Cr (5.87%) | L3 | Rejected-AOC L3 |
| 4 | L4₹194.7 Cr+₹10.8 Cr (5.88%)Rejected-AOC JINDAL ITF CENTRE 28 SHIVAJI MARG MOTI NAGAR NEW DELHI 110015 INDIA | NEW DELHI | WEST DELHI | DELHI | 110015 | ₹194.7 Cr+₹10.8 Cr (5.88%) | L4 | Rejected-AOC L4 |
| 5 | L5₹194.6 Cr+₹10.8 Cr (5.87%)Rejected-AOC 343 ISCON MALL 150 FEET RING ROAD OPP IMPERIAL HEIGHTS RAJKOT 360005 | RAJKOT | RAJKOT | GUJARAT | 360005 | ₹194.6 Cr+₹10.8 Cr (5.87%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | MEGHA ENGINEERING AND INFRASTRUCTURES LIMITED L1 | LARSEN AND TOUBRO LIMITED L5 | LCC Projects Limited L2 | VIJAY KUMAR MISHRA CONSTRUCTION PVT. LTD. L4 | RADHE CONSTRUCTION L3 | LC Infra Projects Pvt Ltd L6 | JWIL INFRA LIMITED L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Execution of 04 nos. of Lift Irrigation Schemes with intake points on Tel River , Mahanadi (ISS Kapasira) and Tel River Confluence Point Of Tel & Suktel River having Command area between 500Ha. to 2000 Ha. in Cluster No. XXX in the district of Sonepur including its distribution network, up to 1 Ha Chak having total planned Culturable Command Area of 6,025Ha. on “EPC –Turn Key” basiscomprising work of Detailed Survey, Planning, Design, Drawing, Estimation, Preparation of Land Acquisition Cases, Preparation of cases for forest land if any, Installation of electrical system connectivity from the Local/Identified Grid Substations, and commissioning of all the LI schemes. | 1 | Nos | 1,70,22,04,031.6 ₹1,70,22,04,031.6 Lowest | 1,80,03,20,377 ₹1,80,03,20,377 | 1,78,12,73,428.97 ₹1,78,12,73,428.97 | 1,84,83,92,944.5 ₹1,84,83,92,944.5 | 1,72,12,91,399 ₹1,72,12,91,399 | 1,80,22,70,007.51 ₹1,80,22,70,007.51 | 1,80,05,19,581 ₹1,80,05,19,581 |
| 2.00 | Operation & maintenance of 4 schemes of the cluster including local substations for 15(fifteen) years or fifteen Khariff water supply seasons whichever is more, after completion as per relevant clauses of the agreement. | 1 | Nos | 13,61,76,323 ₹13,61,76,323 | 14,59,71,923 ₹14,59,71,923 | 14,33,92,511.03 ₹14,33,92,511.03 | 9,78,98,457 ₹9,78,98,457 Lowest | 22,50,00,000 ₹22,50,00,000 | 14,42,36,102.77 ₹14,42,36,102.77 | 14,59,88,074 ₹14,59,88,074 |
Tender Value
₹216.3 Cr
EMD Value
₹2.2 Cr
Closing Date
16 Apr 2025, 5:00 pmClosed
CHIEF ENGINEER, MEGALIFT
PLOT NO. A-8/2, BHOI NAGAR, BHUBANESWAR-751022
MEGALIFT PROJECTS
2025_CEMLP_111951_1
15ML/2024-25
Open Tender
Civil Works - Lift Irrigation Schemes
Turn-key
1080 days
SONEPUR
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,000
₹2.2 Cr
Yes
O/o CHIEF ENGINEER, MEGALIFT,BHUBANESWAR
5 May 2026
27 Mar 2025
22 Apr 2025
27 Mar 2025
16 Apr 2025
27 Mar 2025
27 Mar 2025 - 3 Apr 2025
7 Apr 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Execution of 04 nos. of Lift Irrigation Schemes with intake points on Tel River , Mahanadi (ISS Kapasira) and Tel River Confluence Point Of Tel & Suktel River having Command area between 500Ha. to 2000 Ha. in Cluster No. XXX in the district of Sonepur including its distribution network, up to 1 Ha Chak having total planned Culturable Command Area of 6,025Ha. on “EPC –Turn Key” basiscomprising work of Detailed Survey, Planning, Design, Drawing, Estimation, Preparation of Land Acquisition Cases, Preparation of cases for forest land if any, Installation of electrical system connectivity from the Local/Identified Grid Substations, and commissioning of all the LI schemes. | 1 | Nos | - | - |
| 2 | Operation & maintenance of 4 schemes of the cluster including local substations for 15(fifteen) years or fifteen Khariff water supply seasons whichever is more, after completion as per relevant clauses of the agreement. | 1 | Nos | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.41 MB
vol3.pdf
Tender Documents • 20.04 MB
BOQ_534488.xls
BOQ • 0.24 MB
vol1.pdf
Tender Documents • 3.52 MB
vol2.pdf
Tender Documents • 4.90 MB
Tenderdocument.pdf
Tender Documents • 4.90 MB
BOQ.xls
BOQ • 0.23 MB
Tenderdocument_2.pdf
Tender Documents • 3.52 MB
Tenderdocument_3.pdf
Tender Documents • 20.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .