| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-Finance | L1 | Accepted-Finance Rate quoted is lowest | |
| 2 | L2₹9.9 L+₹1.1 L (12.0%)Accepted-Finance | L2 | Accepted-Finance Rate quoted is second lowest | |
| 3 | L3₹14.2 L+₹5.4 L (60.8%)Accepted-Finance | L3 | Accepted-Finance Rate quoted is highest |
Tender Value
₹15.5 L
EMD Value
₹16,000
Closing Date
19 Jul 2022, 4:00 pmClosed
Superintending Engineer
SE ETC Sultanpur 400KV S/S Campus Payagipur Sultanpur
ROUTINE/EMERGENCY PATROLLING AND PERIODIC CUTTING /LOPPING and CHOPPING OF TREE IN LINE CORRIDOR, THERMOGRAPHY AND JUMPER TIGHTENING OF 220KV TRANSMISSION LINE ALONG WITH OTHER ASSOCIATED WORKS UNDER ETD, SULTANPUR.
2022_UPTCL_710476_1
T. No. 20/ETCS/2022-23
Open Tender
Electrical Works
Item Wise
365 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,888
SE ETC Sultanpur
₹16,000
23 Jul 2022
24 Jun 2022
20 Jul 2022
24 Jun 2022
19 Jul 2022
24 Jun 2022
Amount
Following work are to be Carried out on 220KV Transmission Lines under ETD-Sultanpur during Period of 1 year with all Cost of Men Misc. Consumable T&P etc. Required for Satisfactory Completion of the work as per Technical Specifications & Direction of the Supervising Engineer.
Quartrely Routine Tower to Tower Patrolling from one end to other end of following Transmission lines and Submission of Patrolling report in Triplicate in Perescribed Proforma Mentioning the Stolen /Missing Tower part & Tower Accossries Tree falling in Range of Line Corridor Damage to Earth Wire Conductor Jumper Insulator & other Line Accessories damage to Foundation ,copping, Chimney ,Earthing etc.The Patrolling shall be done every Quarter the Period of 1 Year with all due Care of Safty & Precautions.
220KV Sultanpur-Tanda Therma Line on S.C Towers (Line Length 69.87Km , 69.87Km x4 time = 279.48Km)
220KV Sultanpur-New Tanda Line on S.C Towers (Line Length 66.35Km up to Lilo point , 66.35Km x4 time = 265.4Km)
220KV Amethi -Raibrealy Line D/C Line (Line Length 44.57Km, 44.57Km x4 time = 178.28Km)
220KV Sultanpur-Sangipur Ckt-I Lilo @ 220KV S/S Amethi only Lilo portion from 220KV S/S Amethi to Lilo point (Line Length 3.42Km , 3.5Km x4 time = 14Km)
Emergency Patrolling of the above Transmission Lines the event of Tripping/Break Down of the Line (to Commence with 2 hrs of Intimation for the same if Tripping/Breakdown in Day Time and by 07:300 AM if Tripping /Breakdown in Night Hours) as per Instruction of Supervising Engineer during the Period of 1Year as per Details given below
Emergency Patrolling of the above Transmission line up to 35Km Distance ( one job each Emergency Patrolling)
Emergency Patrolling of the above Transmission line 30Km to 70Km Distance ( one job each Emergency Patrolling)
Periodic Cutting of different type of Trees like Mango Neem Sheeshem,Peepal,Semal,Eucalyptus,Popular etc. having Girth 0.5 Meter to 1.0 Meter and falling in the Range of Corridore of above transmission line to provide minimum clerance of about 8 Meter between tree and Conductor on boath side if Tower/Line with all due Care of Safty & Precaution to Avoid any Damage of Building Power & Telephone Line Passing Nearby ,Crops, other Nearby Tree etc.The work Includes Eliminating & Cleaning the Lines Site after Cutting of Tree during the Period of 1Year (150 No Tree x4 Times in ayear =600 No Trees)
Periodic Lopping/Chopping of different type of Trees like Mango NeeSheeshem,Peepal,Semal,Eucalyptus,Popular etc. having Girth 0.5 Meter to 1.0 Meter and falling in the Range of Corridore of above transmission line to provide minimum clerance of about 8 Meter between tree and Conductor on boath side if Tower/Line with all due Care of Safty & Precaution to Avoid any Damage of Building Power & Telephone Line Passing Nearby ,Crops, other Nearby Tree etc.The work Includes Eliminating & Cleaning the Lines Site after Cutting of Tree during the Period of 1Year (1000 No Tree x4 Times in ayear =4000 No Trees)
Quartarly Hot spot Scanning of Section towers mid span joint ,repair seleves & Jumper of followling transmission lines
220KV Sultanpur-Tanda Therma Line on S.C Towers (Line Length 69.87Km)
220KV Sultanpur-New Tanda Line on S.C Towers (Line Length 66.35Km up to Lilo point )
220KV Sultanpur-Sangipur Ckt-I Lilo @ 220KV S/S Amethi only Lilo portion from 220KV S/S Amethi to Lilo point (Line Length 3.42Km )
Checking & Tightening of Jumpers alongwith replacement of all defected /burnet jumpers of all phases (Once in a year after thermal scanning)
Replacement of missing tower part along with fabrication work and fixing after shifting of tower parts, nut & bolts from UPPTCL store to work site of above mentioned lines.
Re-Fixing & Tightening of Dislocated /Shifted Conductor Vibration Dampers to its Place Including Replacement of Fasteners, if Required to be Provided by Department as Per Requirment of 132KV Transmission Lines.
Attending Brekdown due to failure of Suspension Disc Insulator /Polymer string along with mobilization of skilled gang including carriage of material from store to site and site to store for completion of work.(70KN Disc Insulator/Polymer String)
Attending Brekdown due to failure of Tension Disc Insulator /polymer string along with mobilization of skilled gang including carriage of material from store to site and site to store for completion of work.(160KN Disc Insulator/Polymer String)
Cleaning of porceline Disc Insulator String of Suspension/Tension Tower by removing all type foreign particles sticking on the surface of Disc Insulator
Replacement /Repairing of damaged portion of conductor /replacement of P.G clamp from the conductor of above 220KV Transmission lines by way of releasing of respective phase conductor from suspension fitting of the towers if required between the section towers cutting of the damaged portion /part portion of conductor jointing new conductor with the help of mild span joint & dead end fitting by making compression joint finally restringing & sagging of the conductor as per Sag chart with clamping the conductor at suspension tower as required as details below
(i) 1 conductor of of 1 span section
(ii) 1 conductor of more than 1 span section and length up to 1 KM
(iii) 1 conductor of more than 1 span section and length between 1 KM to 2KM
(iv) 1 conductor of more than 1 span section and length more than 2KM
Replacement /Repairing of damaged portion of earth wire /replacement of P.G clamp from the earth wire of above 220KV Transmission lines by way of releasing of respective earth wirer from suspension fitting of the towers if required between the section towers cutting of the damaged portion /part portion of earth wire jointing new earth wire with the help of mild span joint & dead end fitting by making compression joint finally restringing & sagging of the earth wire as per Sag chart with clamping theearth wire at suspension tower as required as details below
(i) 1 earth wire of 1 span section
(ii)earth wire more than 1 span section and length up to 1 KM
(iii) 1 earth wire more than 1 span section and length between 1 KM to 2KM
(iii) 1 earth wirer more than 1 span section and length more than 2KM
M/S W.M. ELECTRIC WORKS
M/S SHEKHAR ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .