| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.9 LAccepted-AOC | ₹7.9 L | 1 | Accepted-AOC L1 |
| 2 | 2₹7.9 LRejected-AOC | ₹7.9 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | R. Marimuthu L1 | Arunai Infra L2 |
|---|---|---|---|---|---|
| 1.00 | Manhole Raising inner Dia 0.60 and Wall thickness 0.30m and Height average 0.45 raising the existing manhole of 0.20m using centering and Plain cement concrete 1:1.5:3 using 20mm Metal using old frame and covers the rate including cost and dismantling , centering , concrete and curing charges . The outer Barricading / Safety arrangements will be made as per safety purpose , etc., complete as per standard specification.(With Replacement of Frame) | 10 | Each | 6,306.11 ₹63,061.10 | 6,310.11 ₹63,101.10 |
| 2.00 | Manhole Raising inner Dia 0.60 and Wall thickness 0.30m and Height average 0.45 raising the existing manhole of 0.20m using centering and Plain cement concrete 1:1.5:3 using 20mm Metal using old frame and covers the rate including cost and dismantling , centering , concrete and curing charges . The outer Barricading / Safety arrangements will be made as per safety purpose , etc., complete as per standard specification.(Without Replacement of Frame) | 10 | Each | 5,482 ₹54,820 | 5,486 ₹54,860 |
| 3.00 | Manhole Raising inner Dia 0.60 and Wall thickness 0.30m and Height average 0.30 raising the existing manhole of 0.20m using centering and Plain cement concrete 1:1.5:3 using 20mm Metal using old frame and covers the rate including cost and dismantling , centering , concrete and curing charges . The outer Barricading / Safety arrangements will be made as per safety purpose , etc., complete as per standard specification.(With Replacement of Frame) | 22 | Each | 4,476.11 ₹98,474.42 | 4,480.11 ₹98,562.42 |
| 4.00 | Manhole Raising inner Dia 0.60 and Wall thickness 0.30m and Height average 0.30 raising the existing manhole of 0.20m using centering and Plain cement concrete 1:1.5:3 using 20mm Metal using old frame and covers the rate including cost and dismantling , centering , concrete and curing charges . The outer Barricading / Safety arrangements will be made as per safety purpose , etc., complete as per standard specification.(Without Replacement of Frame) | 75 | Each | 3,652 ₹2.7 L | 3,656 ₹2.7 L |
| 5.00Replacement of Underground Utilities (PVC Pipe) damaged during earthwork excavation for pipe laying works including cost of additional arthwork excavation in all soil strata, including BT/CC road cutting,removal of slushy soil and replacing the pipeline with sound pipe, including supply and delivery of PVC pipes, couplers, jointing materials and required specials, cutting, conveying , laying, jointing and cost of refilling for the additional earthwork etc complete and as directed by the TWAD board officers. | |||||
| 5.01 | 200mm Dia PVC Pipe (6KSC) | 85 | Mtrs | 1,637.34 ₹1.4 L | 1,641.34 ₹1.4 L |
| 5.02 | 110mm Dia PVC Pipe (6KSC) | 40 | Mtrs | 658.28 ₹26,331.20 | 662.28 ₹26,491.20 |
| 5.03 | 160mm Dia PVC Pipe (6KSC) | 15 | Mtrs | 1,017.24 ₹15,258.60 | 1,021.24 ₹15,318.60 |
| 6.00Sub Total | |||||
| 7.00 | GST 18% | 1 | No | 1,20,783 ₹1.2 L | 1,20,968 ₹1.2 L |
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
25 Aug 2025, 3:00 pmClosed
Commr
Tiruvannamalai City Municipal corporation
Reconstruct of Manhole Raising at Ward No 1 to 39 in Thiruvannamalai City Municipal Corporation.
2025_MAWS_596165_2
3974/2025/E2
Open Tender
Civil Works
30 days
Tiruvannamalai City Municipal corporation
Places Refer Tender Notices
2 documents required · 2 mandatory
₹0
₹8,000
17 Mar 2026
22 Aug 2025
25 Aug 2025
22 Aug 2025
25 Aug 2025
22 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx