| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹2.5 CrAccepted-AOC | ₹2.5 Cr | l1 | Accepted-AOC accept |
| 2 | l2₹2.5 Cr+₹1.8 L (0.73%)Rejected-AOC | ₹2.5 Cr+₹1.8 L (0.73%) | l2 | Rejected-AOC rejected |
Tender Value
Refer Docs
EMD Value
₹4.8 L
Closing Date
10 Nov 2022, 3:00 pmClosed
The Project Director
The Project Director, DRDA, Vellore
Vellore District MRL-40 Ponnai to Embalavariyur Via S.N.Palayam km 0/485 to 4/700 TN26162
2022_RDTN_121586_1
TN26162
Open Tender
Civil Works - Roads
Piece-work
180 days
DRDA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4.8 L
19 Dec 2022
26 Oct 2022
10 Nov 2022
26 Oct 2022
10 Nov 2022
26 Oct 2022
Amount
IMPROVEMENTS TO THE ROAD FROM MRL-40 PONNAI TO EMBALAVARIYUR (VIA) SN PALAYAM . KM 0/485 - 4/700.
Clearing and grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201
Scarifying the existing bituminous road surface to depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as pwr technical specification clause 301.4
Excavation in soil using Hydraulic Excavator and Tippers with disposal upto 1000m. Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5m and lead upto 1000m as per Technical Specification Clause 302.3.
Construction of embankment using tractor with grader with approval Materials deposited at site from road way cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5 (Filling with cut Earth )
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000m as per Technical Specification Clause 303.1
Construction of embankment with approval Materials deposited at site from road way cutting and excavation from drain and foundation of other structures graded and compacted to meat requirement of tables 300.1 and 300.2 asper technical specification clause 301.5 (Gravel Shoulder)
Providing, laying, spreading and compacting stone aggregates to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired density
Providing and applying Primer Coat with bitumen emulsion (SS –I) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85kg/ sqm using mechanical means as per Technical Specification Clause 502.
Providing and applying Tack Coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.275 kg per sqm on the prepared granular surface treated with prime & cleaned with Hydraulic broom as per Technical Specification Clause 503.
Surface Dressing (Bottom layer) using Bituminous Penetrations grade/ modified bitumen) Binder Providing and laying surface dressing as wearing course consisting of a layer of bituminous binder laid on the prepared surface, follwed by a cover of crushed stone aggregates of specified size and rolling with three wheel 80-100kN static roller including cleaning the road surface as per Technical specification Clause 507. Using mechanical means (13.2mm)
Surface Dressing (Top layer) using Bituminous Penetrations grade/ modified bitumen) Binder Providing and laying surface dressing as wearing course consisting of a layer of bituminous binder laid on the prepared surface, follwed by a cover of crushed stone aggregates of specified size and rolling with three wheel 80-100kN static roller including cleaning the road surface as per Technical specification Clause 507. Using mechanical means (9.5mm)
Provision of 15 nos rumble strips covered with premix bituminous carpet ,15 -20 mm high at center ,250 mm wide placed at 1m center to -center at approved location to control, marked with white strips of road marking paint .
Providing and fixing name board
Providing and fixing logo of PMGSY Project
Providing and fixing citizen information board of PMGSY Project
Providing and fixing maintainance information board of PMGSY Project
Providing and fixing of Retro reflectorised cautionary ,mandatory signs,with defination Plate made out of high intensity grade Prismatic sheeting conforming to IRC -67:2010 & ASTM D 4956-09 , TyPes IV sPecification and fixing over 1.5 mm thick aluminium sheet fixed on back suPPort frame of 25 mm x25mmx3 mm mild steel angle and suPPorted on the mild steel angle iron 75 mm x75 mm x 6mm firmly fixed to the ground by means ProPerly designed foundation with M 15 grade cement concrete 45 cm x45 cm x60 cm below ground level ect comPlete including 7 years warranty for the retro reflective sheeting as Per clause 6.9 of IRC 67-2010 sPecification ( as Per MORT & sPec. no 801)
60 cm Equilateral trainagle ( cautionary ) sign board
60 cm circular ( mandatory ) sign board
Chevron sign 90 cm
Reflectors
Road marking with hot applied thermoplastic compound with reflectorising glass beard on bituminous surface
Kilometer Stone Reinforced Cement Concrete M15 grade kilometer stone /local stone of standard design as per IRC:8 fixing in position including painting and printing, etc., as per drawing and Technical Specification Clause 1703
(ii) Ordinary Kilometer Stone (Precast)
iii) 200m Stone (pre-cast)(HM stone)
iv ) Guard stone
CONSTRUCTION OF 1.50 M SPAN RCC SLAB CULVERT AT CH.535
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000m as per Technical Specification Clause
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000m as per Technical Specification Clause 202
Dismantling, Clearing away and carefully stacking materials useful or re use. Removal of cur stone slabs
Earth work excavation for foundation of structures up to 3 m depth as per drawing and Technical Specification Clause 1104 including setting out, construction of sharing and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and back filling in trenches with excavated suitable material.
Supply and filling foundation basement with filling sand in layers not more than 15 cm thick well ramed wated and compacted complete complying with standrad specifications.
Cement concrete 1:2.5:5 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.(20mm Metal)
Cement concrete 1:1.5:3 mix using 20mm HBG metal for all RCC item of works excluding cost of Reinforcement and fabricating charges ,centring and shuttering but including curing and shall be finished smooth with cement mortar 1:3,12mm thiock and with kraft paper without claiming extra as directed by the departmental officers complete complying with standrad specifications.
Supplying and fabricating and placing in position MS Steel or Ribbed Tor steel for all Reinforced cement concrete works as per the design given including cost of steel and Binding wire in all floors etc., complete complying with standard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate).the Binding wire shall supplied by the contractor.
Providing and fixing 20 mm thick compressible fiber board in expansion joint complete as per Drawing and MORD Technical Specification
Providing and fixing THAR paper for baring between bed black and deck slab.
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wint wall, return wall with 100 mm dia AC pipes extending throught the full width of the structues with slope of 1 (V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614,709,1204.3.7
Gravel filling between body wall including cost and conveyance of Gravel,labour for filling,watering and compacting etc., complete complying with standrad specificationsand as directed by the departmental officer.
CONSTRUCTION OF 2.00 m SPAN RCC SLAB CULVERT AT CH.685
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000m as per Technical Specification Clause
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000m as per Technical Specification Clause 202
Dismantling, Clearing away and carefully stacking materials useful or re use. Removal of cur stone slabs
Earth work excavation for foundation of structures up to 3 m depth as per drawing and Technical Specification Clause 1104 including setting out, construction of sharing and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and back filling in trenches with excavated suitable material.
Supply and filling foundation basement with filling sand in layers not more than 15 cm thick well ramed wated and compacted complete complying with standrad specifications.
Cement concrete 1:2.5:5 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.(20mm Metal)
Cement concrete 1:1.5:3 mix using 20mm HBG metal for all RCC item of works excluding cost of Reinforcement and fabricating charges ,centring and shuttering but including curing and shall be finished smooth with cement mortar 1:3,12mm thiock and with kraft paper without claiming extra as directed by the departmental officers complete complying with standrad specifications.
Supplying and fabricating and placing in position MS Steel or Ribbed Tor steel for all Reinforced cement concrete works as per the design given including cost of steel and Binding wire in all floors etc., complete complying with standard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate).the Binding wire shall supplied by the contractor.
Providing and fixing 20 mm thick compressible fiber board in expansion joint complete as per Drawing and MORD Technical Specification
Providing and fixing THAR paper for baring between bed black and deck slab.
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wint wall, return wall with 100 mm dia AC pipes extending throught the full width of the structues with slope of 1 (V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614,709,1204.3.7
Gravel filling between body wall including cost and conveyance of Gravel,labour for filling,watering and compacting etc., complete complying with standrad specificationsand as directed by the departmental officer.
CONSTRUCTION OF 2.00 m SPAN RCC SLAB CULVERT AT CH.760
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000m as per Technical Specification Clause
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000m as per Technical Specification Clause 202
Dismantling, Clearing away and carefully stacking materials useful or re use. Removal of cur stone slabs
Earth work excavation for foundation of structures up to 3 m depth as per drawing and Technical Specification Clause 1104 including setting out, construction of sharing and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and back filling in trenches with excavated suitable material.
Supply and filling foundation basement with filling sand in layers not more than 15 cm thick well ramed wated and compacted complete complying with standrad specifications.
Cement concrete 1:2.5:5 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.(20mm Metal)
Cement concrete 1:1.5:3 mix using 20mm HBG metal for all RCC item of works excluding cost of Reinforcement and fabricating charges ,centring and shuttering but including curing and shall be finished smooth with cement mortar 1:3,12mm thiock and with kraft paper without claiming extra as directed by the departmental officers complete complying with standrad specifications.
Supplying and fabricating and placing in position MS Steel or Ribbed Tor steel for all Reinforced cement concrete works as per the design given including cost of steel and Binding wire in all floors etc., complete complying with standard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate).the Binding wire shall supplied by the contractor.
Providing and fixing 20 mm thick compressible fiber board in expansion joint complete as per Drawing and MORD Technical Specification
Providing and fixing THAR paper for baring between bed black and deck slab.
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wint wall, return wall with 100 mm dia AC pipes extending throught the full width of the structues with slope of 1 (V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614,709,1204.3.7
Gravel filling between body wall including cost and conveyance of Gravel,labour for filling,watering and compacting etc., complete complying with standrad specificationsand as directed by the departmental officer.
CONSTRUCTION OF 2.00 m SPAN RCC SLAB CULVERT AT CH.4540
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000m as per Technical Specification Clause
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000m as per Technical Specification Clause 202
Dismantling, Clearing away and carefully stacking materials useful or re use. Removal of cur stone slabs
Earth work excavation for foundation of structures up to 3 m depth as per drawing and Technical Specification Clause 1104 including setting out, construction of sharing and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and back filling in trenches with excavated suitable material.
Supply and filling foundation basement with filling sand in layers not more than 15 cm thick well ramed wated and compacted complete complying with standrad specifications.
Cement concrete 1:2.5:5 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.(20mm Metal)
Cement concrete 1:1.5:3 mix using 20mm HBG metal for all RCC item of works excluding cost of Reinforcement and fabricating charges ,centring and shuttering but including curing and shall be finished smooth with cement mortar 1:3,12mm thiock and with kraft paper without claiming extra as directed by the departmental officers complete complying with standrad specifications.
Supplying and fabricating and placing in position MS Steel or Ribbed Tor steel for all Reinforced cement concrete works as per the design given including cost of steel and Binding wire in all floors etc., complete complying with standard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate).the Binding wire shall supplied by the contractor.
Providing and fixing 20 mm thick compressible fiber board in expansion joint complete as per Drawing and MORD Technical Specification
Providing and fixing THAR paper for baring between bed black and deck slab.
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wint wall, return wall with 100 mm dia AC pipes extending throught the full width of the structues with slope of 1 (V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614,709,1204.3.7
Gravel filling between body wall including cost and conveyance of Gravel,labour for filling,watering and compacting etc., complete complying with standrad specificationsand as directed by the departmental officer.
CONSTRUCTION OF 6.00 m SPAN RCC SLAB CULVERT AT CH. 730
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000m as per Technical Specification Clause
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000m as per Technical Specification Clause 202
Dismantling, Clearing away and carefully stacking materials useful or re use. Removal of cur stone slabs
Earth work excavation for foundation of structures up to 3 m depth as per drawing and Technical Specification Clause 1104 including setting out, construction of sharing and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and back filling in trenches with excavated suitable material.
Supply and filling foundation basement with filling sand in layers not more than 15 cm thick well ramed wated and compacted complete complying with standrad specifications.
Cement concrete 1:2.5:5 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.(20mm Metal)
Cement concrete 1:1.5:3 mix using 20mm HBG metal for all RCC item of works excluding cost of Reinforcement and fabricating charges ,centring and shuttering but including curing and shall be finished smooth with cement mortar 1:3,12mm thiock and with kraft paper without claiming extra as directed by the departmental officers complete complying with standrad specifications.
Supplying and fabricating and placing in position MS Steel or Ribbed Tor steel for all Reinforced cement concrete works as per the design given including cost of steel and Binding wire in all floors etc., complete complying with standard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate).the Binding wire shall supplied by the contractor.
Providing and fixing 20 mm thick compressible fiber board in expansion joint complete as per Drawing and MORD Technical Specification
Providing and fixing THAR paper for baring between bed black and deck slab.
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wint wall, return wall with 100 mm dia AC pipes extending throught the full width of the structues with slope of 1 (V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614,709,1204.3.7
Gravel filling between body wall including cost and conveyance of Gravel,labour for filling,watering and compacting etc., complete complying with standrad specificationsand as directed by the departmental officer.
CONSTRUCTION OF CAUSEWAY @ Ch 1335
Earth work excavation for foundation of structures up to 3 m depth as per drawing and Technical Specification Clause 1104 including setting out, construction of sharing and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and back filling in trenches with excavated suitable material.
Cement concrete 1:2.5:5 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Gravel filling between body wall including cost and conveyance of Gravel,labour for filling,watering and compacting etc., complete complying with standrad specificationsand as directed by the departmental officer.
Construction of granular sub-base by providing well graded material, spreeding in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clauses 402
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired density
Construction of un-reinforced, dowel jointed at expansion and construction joint only,plain cement concrete pavemnet. Thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreeding the concrete with sholves, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete salbs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause
Providing and Laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works head walls and parapets Clause 1106
CONSTRUCTION OF RETAINING WALL
Earth work excavation for foundation of structures up to 3 m depth as per drawing and Technical Specification Clause 1104 including setting out, construction of sharing and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and back filling in trenches with excavated suitable material.
Ch.685 - 800 (Right side)
Ch.3980 - 3995 (Right side)
Supply and filling foundation basement with filling sand in layers not more than 15 cm thick well ramed wated and compacted complete complying with standrad specifications.
Ch.685 - 800 (Right side)
Ch.3980 - 3995 (Right side)
Cement concrete 1:2.5:5 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Ch.685 - 800 (Right side)
Ch.3980 - 3995 (Right side)
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Ch.685 - 800 (Right side)
Ch.3980 - 3995 (Right side)
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Ch.685 - 800 (Right side)
Ch.3980 - 3995 (Right side)
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wint wall, return wall with 100 mm dia AC pipes extending throught the full width of the structues with slope of 1 (V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614,709,1204.3.7
Ch.685 - 800 (Right side)
Ch.3980 - 3995 (Right side)
Filter media behind abutment wing wall and return wall complete as per drawing and Technical specification
Ch.685 - 800 (Right side)
Ch.3980 - 3995 (Right side)
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
NS CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .