Loading…
Loading…
Tender Value
₹57.6 L
EMD Value
₹1.2 L
Closing Date
5 Jan 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
CNW
13 conditions · 2 needing a document upload
Turn Over: The tenderer must have minimum average annual contractualturnover of 1.5 V/N crores; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in casebalance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of thefourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii) One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. **Note:Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. **Similar work shall mean "Supply, Installation and commissioning of minimum 10 KLD capacity of Water Recycling Plant/Effluent Treatment Plant/Sewage Treatment Plant".
13 conditions · 2 needing a document upload
A. Documents to be uploaded only in the website by the Tenderer Following Annexures duly filled and signed are to be uploaded online only prior to Closing of Tender. Original copy of all the documents to be submitted to office within 7 days whenever demanded by the Railway. Otherwise, Railway reserves rights to Reject/Accept such tender/offer without any reference to the tenderer/tenderer's. Annexures are available at Upload/View Document menu in Home Page of IREPS portal for works tender. 1. The details of the works completed by the tenderer during the last three years to be filled in Annexure-I. 2. The details of Plants and Machinery with the tenderer to be filled in Annexure- II. 3. Details of Personnel and Organization of the Tenderer to be filled in Annexure-III. 4. Details of Works presently on hand of the Tenderer to be filled in Annexure- IV. 5. The details regarding Association of Railway Officer s with the tenderer to be filled in Annexure- V. 6. List of the Arbitration cases of the Tenderer during last Five years to be filled in Annexure-VI. 7. List of the Court cases of the Tenderer during last Five years to be filled in Annexure- VII. 8. NEFT MANDATE FORM. All Payments to the agency including the refund of the Earnest Money of the unsuccessful bidder preferably will be remitted through NEFT. The Tenderer is required to submit Bank details and A/C No. etc. in Annexure-VIII.
B . Documents to be uploaded in the website as well as submitted in tender boxes by the Tenderer If online payments have been made no documents are to be deposited. Following Documents are to be uploaded in the website as well as submitted in the appropriate tender boxes prior to Closing of Tender where online payment has not been made by the tenderer. Incase of non-receipt of these documents, the offer will be summarily rejected. 1 . Details of Cost of Tender Document and Earnest Money Deposit. Original copies of money Receipt or Instrument towards cost of purchase of Tender Document and Earnest Money Deposit are to be submitted in the appropriate tender boxes prior to closing of tenders specified in the NIT and the website.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Demand for the Financial Criteria, Association of Railway Officers, List of Arbitration cases, Court cases and Mandate for NEFT are to be uploaded with a scanned copy duly filled in and signed as per annexure no. IV, V, VI, VII, VIII respectively. These Annexures are available in View Document menu at Home page and is downloadable. The details of the uploaded documents should be produced whenever demanded for verification on written request at any point of time of the tender and contract within 7 days.Otherwise, Railway reserves rights to Reject/Accept such tender/offer without any reference to the tenderer/tenderer's.
Annexure:- IV, V , VI and VII
Supply, installation & commissioning of Phytorid technique ETP of 40 KLD capacity at Newly Constructed Coaching Depot, Madhupur including provision of reutilization of water for coach cleaning purpose on turnkey basis.
M-EnHM-38-Tender-ASN-01-R~ER
M-EnHM-38-Tender-ASN-01-R
Open
Works - General
18 Months
Paschim Bardhaman, West Bengal
₹0
₹1.2 L
5 Jan 2026
12 Dec 2025
22 Dec 2025
5 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 57,60,418 | ||
| — | 1.00 | — | — | ||
| Supply, installation & commissioning of Phytorid technique ETP of 40 KLD capacity at Newly Constructed Coaching Depot Madhupur including provision of reutilization of water for coach cleaning purpose on turnkey basis. | — | — | — | 54,63,058 | |
| — | 1.00 | — | — | ||
| Operation and Maintenance of ETP for a period of One year. | — | — | — | 2,97,360 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
Checklist-updatedAnnexure-V_1.pdf
ATTACHMENT
TDETPMDPCoachingdepot.pdf
ATTACHMENT
ComlCompliance-U-IVVVIVII_1.pdf
ATTACHMENT
CondnMaster-updatedAnnexureV_1.pdf
ATTACHMENT
TechComp-IIIIII_2.pdf
ATTACHMENT
TDETPMDPCoachingdepot.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .