| 1 | L1₹7.7 LAccepted-AOC | L1 | Accepted-AOC AWARD OF WORK TO L1 BIDDER AND REJECT L2 BIDDER DUE TO NOT L1 BIDDER. | |
| 2 | Rejected-Technical 11TH FLOOR BIRLA BUILDING 9 1 R N MUKHERJEE ROAD B B D BAG KOLKATA WEST BENGAL 700001 | KOLKATA | WEST BENGAL | 700001 | - | Rejected-Technical NOT L1 BIDDER |
Tender Value
₹7.7 L
EMD Value
₹9,700
Closing Date
23 Nov 2024, 11:00 amClosed
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P.
Annual Maintenance Contract (AMC) of AC of 33/72 Somnath dragline of Khadia Project for a period of 365 days.
2024_NCL_320703_1
KHD/G.M. (Excv)/E-Tender/24-25/626
Open Tender
Excavation Department Work
Item Rate
365 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
5 documents required · 5 mandatory
₹9,700
19 Dec 2024
7 Nov 2024
25 Nov 2024
7 Nov 2024
23 Nov 2024
8 Nov 2024
7 Nov 2024 - 12 Nov 2024
Amount
Scope of Work/Technical Specifications etc.: 1. To carry out periodic / scheduled inspection and maintenance of entire cabin and PCR AC system as per the check sheet and OEM recommendations, once in a month. 2. Attend and rectify minor breakdown/repair if any within 24 hrs. of complaint. To change / clean AC filters, compressor oil as and when required or as per maintenance manual. 3. To do leakage test using nitrogen, refill the refrigerant gas if any leakages and rectifying the cause. 4. To check sub parts of AC system such as compressor, evaporator, blower assy., thermostat, fuse, electrical connections, AC belt, etc. on regular basis and ensure their proper working so as to ensure comprehensive good cooling is provided by A.C.s reliably. To change/repair any sub part if it malfunctions. 5. To ensure working of both cooling as well as heating systems throughout the contract period. 6. All tools and tackles shall be provided by the AMC holder. 7. Planning of spares for maintenance and repair to be procured and provided by project/NCL shall be required to be done by AMC holder. 8. If a machine remains breakdown for a complete month, no payment shall be made for that machine in that particular month.
Annual Charges for Annual Maintenance Contract (AMC) for OEM fitted Plant Air Conditioning System of PCR, Operator cabin and rest room of 33/72 Somnath dragline of Khadia Project for a period of 365 days.
Total impact of GST for the purpose of CTC
M/s. GMMCO LIMITED (BID ID -1100495)
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_332436.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .