Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.5 L+₹2,675.97 (1.09%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.5 L+₹9,266.05 (3.79%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹2.6 L+₹19,570.55 (8.01%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹2.9 L+₹48,327.27 (19.8%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹4.0 L
EMD Value
₹7,980
Closing Date
5 Aug 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Bowli repair at kharlad and well repair wno 5 ghagrore
2026_RDPR_317838_16
e-NIT No.141/REW/K of 2026-27 Dated 25/07/2026
Open Tender
Civil Works
Percentage
90 days
BASOHLI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹7,980
12 Aug 2026
25 Jul 2026
6 Aug 2026
25 Jul 2026
5 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 4.25 | cum | 1,740.45 | ₹7,396.91 |
| 2 | Earth work in excavation by manual in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth upto 1.5mtr. | 24.24 | Cum | 479.3 | ₹11,618.23 |
| 3 | Providing and laying in position dry stone agg excluding the cost of centring and shuttering, all work Upto plinth level 40mm nominal size (crusher) | 1.68 | Cum | 4,826.5 | ₹8,108.52 |
| 4 | Providing and laying in position Cement Concrete of specified grade excluding the cost of centring and shuttering, all work Upto plinth level (1:3:6) 1 cement:3 coarse sand:6 graded stone aggreagate 20mm nominal size (crusher) | 24.3 | Cum | 5,733.6 | ₹1,39,326.48 |
| 5 | 30% boulders | 10.33 | cum | 937 | ₹9,679.21 |
| 6 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse
sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:
Cement mortar 1:6 (1 Cement : 6 coarse sand) | 7.58 | Cum | 5,402.9 | ₹40,953.98 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.69 | Cum | 7,788 | ₹13,161.72 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level | 1.34 | Cum | 12,320 | ₹16,508.8 |
| 9 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 4.18 | sqm | 416.5 | ₹1,740.97 |
| 10 | 15mm Cement plaster on the rough side of single or half brick wall of mix:1 : 4 ( 1 cement : 4 fine sand) | 20.82 | sqm | 306.85 | ₹6,388.62 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.89 MB
BOQ_1044036.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .