| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹38.6 LAccepted-AOC | ₹38.6 L | L 1 | Accepted-AOC Accept |
| 2 | L 2₹39.3 L+₹72,510.77 (1.88%)Rejected-AOC AT JHARIGUMTA PO TENTULIKHUNTI PS TENTULIKHUNTI DIST NABARANGPUR | ₹39.3 L+₹72,510.77 (1.88%) | L 2 | Rejected-AOC Reject |
| 3 | L 3₹39.9 L+₹1.3 L (3.36%)Rejected-AOC | ₹39.9 L+₹1.3 L (3.36%) | L 3 | Rejected-AOC Reject |
| 4 | L4₹43.0 L+₹4.5 L (11.5%)Rejected-AOC | ₹43.0 L+₹4.5 L (11.5%) | L4 | Rejected-AOC Reject |
| 5 | L 5₹51.8 L+₹13.2 L (34.2%)Rejected-AOC | ₹51.8 L+₹13.2 L (34.2%) | L 5 | Rejected-AOC Reject |
Tender Value
₹51.8 L
EMD Value
₹51,800
Closing Date
9 Mar 2026, 5:30 pmClosed
Superintending Engineer
Superintending Engineer, M.I. Division, Jeypore
C.C.Lining at LMC From RD 450m to 1350m Of Ratiaguda MIP in Boipariguda Block of Koraput District under MIPSP Scheme
2026_CEMIB_126700_2
MIDJEY22/2025-26
Open Tender
Civil Works - Water Works
Percentage
120 days
Boipariguda
Please Refer Tender Document
2 documents required · 2 mandatory
₹10,000
₹51,800
Yes
18 Jun 2026
27 Feb 2026
10 Mar 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing shrub Jungles uprooting stumps and small bushes and trees below 1M girth on premeasurement etc. complete as directed by engineer-in-charge | - | One Sqm | - | - |
| 2 | Excavation of foundation in all kinds of soil soil with all leads and lifts and delifts including dressing and leveling the bed to proper slope and level & making it fit for laying concrete & removing the debris clear of work site with all leads and lifts and delifts including dewatering from foundation if necessary etc complete in all respect as directed by the Engineer-In-Charge. | 1 | One Cum | 1 | ₹1 |
| 3 | Filling in foundation and plinth with good quality sand in foundation bed with all leads and lifts including watering and ramming and compaction including cost, conveyance and royalty of the material etc complete as directed by the Engineer-in-charge. | - | One Cum | 1 | - |
| 4 | Cement concrete in M15 grade using 20 mm down graded size crusher broken granite chips of approved quality quarried and free from weathered skin and foreign materials including mixing the materials by use of concrete mixtures and laying concrete in layers not exceeding 0.15 m in depth to required level curing vibrating with vibrators, finishing etc with all leads lifts and delifts complete in all respect to proper profile and leveling including dewatering if necessary and cost, conveyance and royalty and other taxes etc of materials including hire & running charges of the machineries complete as directed by the Engineer - in - Charge. | - | One Cum | 1 | - |
| 5 | Reinforced Cement Concrete M20 grade with crushed granite 20mm down graded hard granite crusher broken chips of approved quality free from skin materials mixing by concrete mixer including hoisting lowering and laying the concrete in position to proper slope and level and compacting by vibrators in layers not exceeding 0.15m depth and finishing the exposed surface smooth including watering, curing for required period cost, conveyance, hire and running charges of all machineries, royalty and other taxes of all materials labour, T & P materials required for this item etc, complete as directed by the Engineer in charge. | - | One Cum | 1 | - |
| 6 | Straightening, cutting, bending, binding, fitting and placing uncoated HYSD bar reinforcement and laying in position including cost of binding wire 18 to 20 gauge and fixing of reinforcement including lapping where necessary with all leads, lifts from bending yard to placement spot including cost ,conveyance & all taxes of reinforcement as directed by the Engineer-in-charge. | - | One Qntl | - | - |
| 7 | Excavation loading, unloading and carriage by mechanical means in all kinds of soil including stoney earth , gravel and moorum etc, interspread with boulders up to ½ cum size with all lifts and delifts (including trimming of slopes bed to design sectionand) including dewatering if any & depositing the excavated materials away from the work site as per the specification and as directed by the Engineer in charge. | 1 | One Cum | - | - |
| 8 | Providing rigid shuttering with the box type steel shuttering plates with keys for immediate construction joints in raft of weir barrages and dam blocks including cost of all materials, labour complete as directed by the Engineer in Charge including removal of form complete as directed by the Engineer in charge. | 1 | One Sqm | - | - |
| 9 | Filling in foundation and plinth with excavated earth with all leads & lifts including watering and ramming and compaction etc. complete in all respects as per specification and direction of the Engineer-in-charge. | - | One Cum | - | - |
| 10 | Providing weep holes in Brick masonry/Plain/Rainforced concrete abutment,wing wall/ return walls with 100 mm dia P.V.C. pipe extending through the full width of the structure with slope of IV: 20H towards drawing face complete as per drawing & technical etc. complete in all respects as directed by the Engineer-in-charge | 1 | R.M | - | - |
stage.html
html • 0.14 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.38 MB
Ratiaguda.pdf
Tender Documents • 5.07 MB
BOQ_583371.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .