Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC | ₹10.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.5 L+₹49,997 (5.00%)Rejected-Finance | ₹10.5 L+₹49,997 (5.00%) | L2 | Rejected-Finance L2 |
| 3 | L3₹10.7 L+₹74,997 (7.50%)Rejected-Finance | ₹10.7 L+₹74,997 (7.50%) | L3 | Rejected-Finance L3 |
| 4 | L4₹11.0 L+₹99,995 (10.0%)Rejected-Finance | ₹11.0 L+₹99,995 (10.0%) | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
2 Dec 2024, 3:00 pmClosed
EE/SWD-I, PHE Dte.
33 and 33/1, Chetla Central Road, (2nd Floor), Kolkata 700027
Engagement of expertise to improve the performance and functionality at the end of consumers (FHTC) of the water supply system using Hydraulic Isolation Structures near Birlapur (CT) under South 24-Parganas Water Supply Division-I, PHE Dte.
2024_PHED_768491_1
29/2024-2025/EE/SWD-I/WBPHED
Open Tender
CIVIL WORKS
Item Wise
30 days
South 24 Parganas
Please refer Tender documents.
4 documents required · 4 mandatory
₹20,000
13 Jun 2025
12 Nov 2024
4 Dec 2024
14 Nov 2024
2 Dec 2024
14 Nov 2024
Amount
Detailed study of Uttar Raypur WSS Field study Network mapping and digitization. Documentation of operational schedule. Pressure and flow measurement as per satisfaction of EIC
Field Survey and network with Pressure and Yield survey using Pressure Gauges and Flowmeter of Uttar Roypur LDS
Field Survey and network with Pressure and Yield survey using Pressure Gauges and Flowmeter of Budge Budge I Rising Main to Uttar Roypur W/S Scheme (900 Cum OHR)
Recording of OHR Loading and Water Distribution Data (confirming receipt of 55 Lpcd)
The agency should also study the existing data available with PHED and ISA Team under JJM and make a comparitive analysis
Report: Analysis of the field data and identification of the bottlenecks in the system. Preparation of appropriate maps using QGIS (forming shapefiles) and AutoCAD. Checking of LDS in Water Gems / Epanet. Recommendations of appropriate interventions for improving the efficiency of the system. Estimates for the proposed interventions. Suggesting sequence of implementation for proposed interventions as per satisfaction of EIC.
Suggestions of necessary interventions.
Estimate of proposed interventions using rates of PWD/ PHED / UDMA / PW & ID /SE SWC Approved rates and other Govt approved Schedules
Submissions of Hard Copy (6 Nos) and Soft Copies (in pendrive) of AutoCAD , QGIS , Epanet or Water Gems
Checking of applications of the Suggestions by executing agency at the consumer end in terms of the Functionality Assesment of the FHTCs under JJM
For studying the results of application of the point (2.04) the agency may use the data put forwarded by PHED, Block Administration, PRI Bodies or ISA Team. The team may also attend meeting of District admisnistration regarding the issue.
Qureshi Md Fayyaz Ahmed (BID ID -5803048)
ENGENIUS PROJECT SOLUTIONS (BID ID -5803290)
JYOTI NARAYAN KADAM (BID ID -5803765)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .