Loading…
Loading…
Tender Value
₹17.0 L
EMD Value
₹1.7 L
Closing Date
16 Jun 2026, 1:00 pm
EXECUTIVE OFFICER
NPP MAU
WARD NO 35 MUNSHIPURA PURVI SAGEER AHMAD KE MAKAN SE FIROZ AHMAD KE MAKAN HOTE HUE DAOOD KE MAKAN, PAPPU KE MAKAN SE JAMALUDDIN KE MAKAN V BASEER KE MAKAN SE LALU KE MAKAN TK MITTI BHARAI, NALI PATIYA V INTERLOCKING KA KARYA
2026_DOLBU_1130509_2
68-176
Open Tender
Civil Works
120 days
WORK
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,560
EXECUTIVE OFFICER
₹1.7 L
4 Jun 2026
4 Jun 2026
16 Jun 2026
4 Jun 2026
16 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site Clerance including labour and matrlals and including grass cutting /Dressing and carrage of matrials by Head load | 1 | job | 5,000 | ₹5,000 |
| 2 | Dismenteling of Brick Work including Stacking of materials as directed by the Engineer-in-Charge with the distance of 60.00m. Work SI No. 692 | 17.89 | Cum | 435 | ₹7,782.15 |
| 3 | E/W filling In embankment with cartage soil up to 8.00 km distances etc com. | 419.63 | Cum | 301 | ₹1,26,308.63 |
| 4 | E/W in Excavation in ordenery soil in foudation including labour and matrials and T /P with all com. Work SI No. 251 | 103.45 | Cum | 115 | ₹11,896.75 |
| 5 | C.C. Work in 1:6:12 in cement, fine sand and 40 mm Gauge Brick Ballast including labour and matrials , T /P with all com. Work SI No. 273 | 21.95 | Cum | 3,250 | ₹71,337.5 |
| 6 | M-150 B/W in 1:4 in cement and coar sand mortar including labour and matrials , T /P Cum 31.41 4980.00 156422.00 with all com. Work SI No.305
(Deduction of old Bricks and Brick Bats Rs.37749.00 ) | 66.25 | Cum | 4,980 | ₹3,29,929.98 |
| 7 | 12 mm thick plaster work in 1 :3 with cement and fine sand etc all complete. SJ.No 584 | 187.04 | Sqm | 189 | ₹35,350.56 |
| 8 | R.C.C. Work in 1:1.5:3 in cement coarse sand and 20mm gauge including labour and matrials , T /P with all com. Work SI No.285 | 0.66 | Cum | 9,430 | ₹6,223.8 |
| 9 | MS work in R.C.C. work including labour and matriaJs , T /P with all Work SI No.504 | 0.52 | Qtl | 5,650 | ₹2,938 |
| 10 | Construction of Granular sub base (GSB) by providing coarse graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per Clause 401 .. | 40.68 | Cum | 3,492.6 | ₹1,42,078.97 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.43 MB
tech6801.pdf
Tender Documents • 6.53 MB
BOQ_2166754.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid