Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.0 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹42.7 L+₹72,347.86 (1.72%)Rejected-Finance | L2 | Rejected-Finance Tender Opened your L2 |
| Sl No | Description | Qty | Unit | Gomathi L2 | Suruthi Contractor L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on banks with initial lead
and lift in gravelly soil stiff clay, hard stiff clay, murram,
boulders mixed with gravel as per SS 20-B for foundation. | 159.3 | Cum | 346.14 ₹55,140.1 | 246.52 ₹39,270.64 Lowest |
| 2.00 | Filling River Sand including cost and conveyance loading
unloading from approved quarry to work site and labour charges
for filling, ramming, etc. complete | 120.65 | Cum | 1,897.8 ₹2,28,969.57 Lowest | 1,897.8 ₹2,28,969.57 Lowest |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal
including all cost and conveyance, labour charges etc. | 32.35 | Cum | 5,608.5 ₹1,81,434.98 Lowest | 5,608.5 ₹1,81,434.98 Lowest |
| 4.00 | Brick work in CM 1:5 mix using country Bricks including cost and
conveyance labour charges etc. | 6,040.47 | cum | 56.14 ₹3,39,111.99 | 46.79 ₹2,82,633.59 Lowest |
| 5.00 | Super Structure
Brick work in CM 1:5 mix using country Bricks including cost and
conveyance labour charges etc. | 31.6 | Cum | 6,079.67 ₹1,92,117.57 Lowest | 6,079.67 ₹1,92,117.57 Lowest |
| 6.00 | Supply and errecting sheet centering of size 90 cm x 60cm 10 G
sheet laid over silver oak joist and supported by casurina post of
size 10 cm x 13 cm dia spaced at 75 cm center to center etc.
complete | 131.87 | Cum | 765.12 ₹1,00,896.37 Lowest | 765.12 ₹1,00,896.37 Lowest |
| 7.00 | Above Basement
Supply and errecting sheet centering of size 90 cm x 60cm 10 G
sheet laid over silver oak joist and supported by casurina post of
size 10 cm x 13 cm dia spaced at 75 cm center to center etc.
complete | 380.53 | sqm | 1,016.28 ₹3,86,725.03 Lowest | 1,016.28 ₹3,86,725.03 Lowest |
| 8.00 | Supply and fabrication of steel for RCC works including cost and
conveyance charges etc | 7.5 | MT | 90,584 ₹6,79,380 Lowest | 90,584 ₹6,79,380 Lowest |
| 9.00 | RCC 1 :1.5 : 3 mix using 20mm ISS HBG metal including cost
and conveyance of all materials but excluding centering charges
including labour charges for mixing laying concrete etc.,
complete | 38.89 | Cum | 9,323.2 ₹3,62,579.25 Lowest | 9,323.2 ₹3,62,579.25 Lowest |
| 10.00 | Above Basement
RCC 1 :1.5 : 3 mix using 20mm ISS HBG metal including cost
and conveyance of all materials but excluding centering charges
including labour charges for mixing laying concrete etc.,
complete | 37.84 | Cum | 9,382.5 ₹3,55,033.8 Lowest | 9,382.5 ₹3,55,033.8 Lowest |
Tender Value
₹50 L
EMD Value
₹50,000
Closing Date
3 Oct 2025, 5:00 pmClosed
BDO BP Cuddalore
Block Development office Cuddalore
Construction of Community hall type I at Pethankuppam village in Villangalpattu panchayat Cuddalore Block
2025_RDTN_610373_1
A3/1830/2025-MPLADS III
Open Tender
Civil Works - Buildings
Item Rate
180 days
Block Development office Cuddalore
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹50,000
Yes
13 Nov 2025
30 Sept 2025
3 Oct 2025
30 Sept 2025
3 Oct 2025
30 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_729366.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .