| Sl No | Description | Qty | Unit | K Ganesan L2 | SUDHAKAR CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.001.Construction of Drain and Deck Slab From Munichandiran House to Culvert @ M.Doddi H/O Thiyagarsanapalli.Estimate Amount: Rs.14.00 Lakhs | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 220.22 | Cum | 165.11 ₹36,360.52 | 164.7 ₹36,270.23 |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 31.46 | cum | 5,393.72 ₹1.7 L | 5,380.25 ₹1.7 L |
| 4.00 | Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc., | 635.27 | Sqm | 548.32 ₹3.5 L | 546.95 ₹3.5 L |
| 5.00 | Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc., | 15.24 | Sqm | 579.14 ₹8,826.09 | 577.69 ₹8,804 |
| 6.00 | Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 71.76 | Cum | 6,145.9 ₹4.4 L | 6,130.55 ₹4.4 L |
| 7.00 | Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour | 156 | Sqm | 579.14 ₹90,345.84 | 577.69 ₹90,119.64 |
| 8.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.44 | mt | 91,996.29 ₹40,570.36 | 91,766.64 ₹40,469.09 |
| 9.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 4.57 | cum | 9,121 ₹41,682.97 | 9,098.23 ₹41,578.91 |
| 10.00 | Provision For Name Board Charges | 1 | no | 500.75 ₹500.75 | 499.5 ₹499.50 |
Updated dates
Tender Value
₹26.9 L
EMD Value
₹27,000
Closing Date
13 Feb 2026, 3:00 pmClosed
The Block Development Officer (V.P) Shoolagiri
The Block Development Office Shoolagiri
Krishnagiri District Shoolagiri Block under the Scheme General Fund (Village Panchayat)_2025_26 Construction of Drain 2Nos in Thiyagarsanapalli Panchayat Package No_2025_26_SGI_120
2026_RDTN_654918_1
Rocno_1657_2025_E2
Open Tender
Civil Works
The Block Development Office Shoolagiri
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹27,000
Yes
The Block Development Office Shoolagiri
16 Mar 2026
11 Feb 2026
13 Feb 2026
11 Feb 2026
13 Feb 2026
11 Feb 2026
11 Feb 2026
1.Construction of Drain and Deck Slab From Munichandiran House to Culvert @ M.Doddi H/O Thiyagarsanapalli.Estimate Amount: Rs.14.00 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,
Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Provision For Name Board Charges
Provision For Photocharges
2.Construction of Anganwadi Building @ M.Doddi H/O Thiyagarsanapalli.Estimate Amount Rs:-17.25 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,
Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Provision For Writing Name Board Charges
Provision Photo Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.60 MB
PB120.pdf
Tender Documents • 0.71 MB
TB120.pdf
Tender Documents • 0.72 MB
BOQ_785240.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid