Tender Value
₹3.4 L
EMD Value
₹3,500
Closing Date
4 Apr 2026, 5:00 pmClosed
ESTATE OFFICER, PJTAU
Admn. Office, PJT Agricultural university, Rajendranagar, Hyderabad
Connecting existing Soak Pits to Sewage Treatment Plant (STP) at Boys and Girls Hostels of Babu Jagjivanram Agricultural College, Sircilla
688985
10/PJTAU/EO/TPA/2025-26, Dt. 25-03-2026
OPEN
Civil Works
RAJANNA SIRICILLA
11 documents required · 11 mandatory
₹122
₹3,500
28 Mar 2026
28 Mar 2026
28 Mar 2026
Earth work excavation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means.
Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed Granite metal from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for mixing, laying concrete in foundations , ramming, finishing top surface to the required level, curing including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No. 402) HAND MIXING
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS.
Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)
S/F of 75mm dia 3 M Single Socket PVC/SWR pipe- 4Kg/sq.cm
Providing 110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm of ISI marked including cost of necessary PVC Bends, shoes, PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials to site, operational & incidental charges, all labour charges for fixing at site etc., and Overheads & Contractors profit complete for finished item of work. (APSS No. 1328)
Constructing 904.0 mm (3’0”) dia solid block masonry inspection chamber as per IS - 4111: Part- 1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3prop;½”thick both inside and outside fitted with 20” dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.
TBSP-B.I-01
Total
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Connecting existing Soak Pits to Sewage Treatment Plant (STP).doc
TENDER_DOCUMENT • 0.47 MB
BOQ-Connecting existing Soak Pits to Sewage Treatment Plant (STP).xls
TENDER_DOCUMENT • 0.03 MB
Download all tender documents and submit your bid