Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-Finance | ₹9.6 L | L1 | Accepted-Finance L-1 |
| 2 | L2₹9.7 L+₹5,056.50 (0.53%)Rejected-Finance | ₹9.7 L+₹5,056.50 (0.53%) | L2 | Rejected-Finance L-2 |
| 3 | L-3₹9.8 L+₹14,780.54 (1.54%)Rejected-Finance 892 PANKI GANGA GANGA KANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹9.8 L+₹14,780.54 (1.54%) | L-3 | Rejected-Finance L-3 |
Tender Value
₹9.7 L
EMD Value
₹97,240
Closing Date
15 Jul 2026, 3:00 pmClosed
CHIEF ENGINEER, KMC
Motijheel
Construction of RCC Stone from vishal tent house to Rang Factory via Magadevan tample gate in ward 63 under Zone02
2026_NNKAN_1166041_1
17/AA-2/25-26
Open Tender
Civil Works
Fixed-rate
45 days
zone 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹97,240
30 Jul 2026
3 Jul 2026
15 Jul 2026
3 Jul 2026
15 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Making of Bandha by Sand filling bag including material all complete. | - | bag | 57.7 | - |
| 2 | Desilting /cleaning of open nala under foul position and liquid mud etc all complete. | 45 | cum | 190 | ₹8,550 |
| 3 | Dewatering of drain by pumpset etc all complete. | - | hr | 228 | - |
| 4 | Class -150 brick work in 1:4 Cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. required for proper completion of the work. Etc all complete. Ch-6(305) | - | cum | 6,600 | - |
| 5 | 12mm Thick Cement plaster1;4 in single coat on Both side of single or half brick wall for interior plasting upto flor two level including internal rounded angles chamfers and/or rounded angles not exceeding 80mm in girth and finishing even and smooth. | - | sqm | 182 | - |
| 6 | RCC works with Cement approved coarse sand and 2 cm (3/4'') gauge approved stone ballast in the proportion 1:2:4 (1 Cement:6 aggregate) in lintels of doors and windows excluding supply of reinforcement and its bending the same with 24 BWG bindinh wire and necessary centring and Shuttering etc. and also including supply of all materials labours and tools and plants etc. required for proper completion of work stone ballast but for slab including shuttering mat. Lab etc all complete. | - | cum | 8,600 | - |
| 7 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not include in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authrized overlapping shall be measured up to floor two level (Over all Rate) 12mm to 32mm tor etc all complete. | - | qtl | 7,200 | - |
| 8 | Add 18% G.S.T | 1 | tax | 1,48,332.78 | ₹1,48,332.78 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.31 MB
100stamp.pdf
Tender Documents • 0.30 MB
BOQ_2187061.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .