| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 CrAccepted-AOC PHAYANG GOMPA COMPLEX AGLING ROAD SKALZANGLING LEH LADAKH J K 194101 | LEH | LEH | LADAKH | 194101 | ₹12.7 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹12.9 CrRejected-Finance MAIN BAZAR SURANKOTE DISTT POONCH 185121 J K | SURANKOTE | POONCH | J K | 185121 | ₹12.9 Cr | L2 | Rejected-Finance Other than lowest bidder |
| 3 | L3₹16.5 CrRejected-Finance | ₹16.5 Cr | L3 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | M/S KIRAN CONSTRUCTIONS L2 | mirco builders L3 | M/S BETONG CONSTRUCTION CO L1 |
|---|---|---|---|---|---|---|
| 0.00NOTE: Schedule ‘A’ Part - I to Part - IX are Prepriced by MES. Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only. | ||||||
| 1.00 | Total amount of Sch 'A' Part - I (BUILDING Works) | 1 | LUMP SUM | 7,92,00,000 ₹7.9 Cr | 9,45,94,774.42 ₹9.5 Cr | 7,80,00,000 ₹7.8 Cr |
| 2.00 | Total amount of Sch 'A' Part - II (SITE CLEARANCE WORKS) | 1 | LUMP SUM | 45,00,000 ₹45 L | 71,21,801.26 ₹71.2 L | 45,00,000 ₹45 L |
| 3.00 | Total amount of Sch ‘A’ Part - III
(INTERNAL Electrification) | 1 | LUMP SUM | 15,00,000 ₹15 L | 19,73,545.34 ₹19.7 L | 16,00,000 ₹16 L |
| 4.00 | Total amount of Sch ‘A’ Part - IV
(PROTECTIVE WORKS) | 1 | LUMP SUM | 1,75,00,000 ₹1.8 Cr | 2,33,52,304.67 ₹2.3 Cr | 1,70,00,000 ₹1.7 Cr |
| 5.00 | Total amount of Sch ‘A’ Part - V
(ROAD, PATH. HARDSTANDING & CULVERTS WORKS) | 1 | LUMP SUM | 2,12,00,000 ₹2.1 Cr | 2,99,48,369.55 ₹3.0 Cr | 1,78,00,000 ₹1.8 Cr |
| 6.00 | Total amount of Sch ‘A’ Part - VI
(AREA DRAINAGE) | 1 | LUMP SUM | 18,00,000 ₹18 L | 21,86,077.64 ₹21.9 L | 19,10,000 ₹19.1 L |
| 7.00 | Total amount of Sch 'A' Part - VII (External Electrification) | 1 | LUMP SUM | 9,00,000 ₹9 L | 10,32,625.59 ₹10.3 L | 10,00,000 ₹10 L |
| 8.00 | Total amount of Sch ‘A’ Part -VIII
( EXTRNAL WATER SUPPLY WORKS) | 1 | LUMP SUM | 6,00,000 ₹6 L | 7,13,894.88 ₹7.1 L | 7,00,000 ₹7 L |
| 9.00 | Total amount of Sch ‘A’ Part - IX
(LIGHTENING PROTECTION) | 1 | LUMP SUM | 5,50,000 ₹5.5 L | 6,43,774.01 ₹6.4 L | 6,00,000 ₹6 L |
Updated dates
Tender Value
₹12.5 Cr
EMD Value
₹9.5 L
Closing Date
6 Feb 2026, 6:00 pmClosed
Chief Engineer
HQ CE Leh Zone PIN - 901205 C/o 56 APO
CONSTRUCTION OF TECHNICAL BUILDING ALONGWITH ALLIED INFRA UNDER GE 873 EWS
2025_MES_743927_1
180118/E8
Open Tender
Civil Works
900 days
Partapur, leh
Please refer to the tender documents
8 documents required · 8 mandatory
₹3,000
GE 873 EWS
₹9.5 L
Yes
HQ CE Leh Zone
12 Mar 2026
11 Dec 2025
13 Feb 2026
11 Dec 2025
6 Feb 2026
23 Jan 2026
22 Dec 2025
NOTE: Schedule ‘A’ Part - I to Part - IX are Prepriced by MES. Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only.
Total amount of Sch 'A' Part - I (BUILDING Works)
Total amount of Sch 'A' Part - II (SITE CLEARANCE WORKS)
Total amount of Sch ‘A’ Part - III (INTERNAL ELECTRIC SUPPLY))
Total amount of Sch ‘A’ Part - IV (PROTECTIVE WORKS)
Total amount of Sch ‘A’ Part - V (ROAD, PATH. HARDSTANDING & CULVERTS WORKS)
Total amount of Sch ‘A’ Part - VI (AREA DRAINAGE)
Total amount of Sch 'A' Part - VII (EXTERNAL ELECTRIC SUPPLY WORKS)
Total amount of Sch ‘A’ Part -VIII ( EXTRNAL WATER SUPPLY WORKS)
Total amount of Sch ‘A’ Part - IX (LIGHTENING PROTECTION)
SCH 'A PART - X (Miscellaneous B/R and E/M works for Sch 'A' Part-II to Part-X) Note: This schedule is not pre-priced by MES and the rate indicated as "Rs 0.00" under Col 5 signifies this fact only
Supply and fixing, steet metal enclosure powder coated Single phase flame proof DB with 200 Amps rated bus bar 240 V, SPN 8 ways LM6 of size 400 x400 x125 mm for fixing MCBs.C complete all as specified and directed.
M&L for polyethene film, black 125 micron laid in floor over sand cushioning for laying pavement quality concrete, complete all as specified and directed.
(a) Aluminium bus bar 100 amps - 04 Nos, supported with suitable size of heavy duty porcelin stand lock with suitable size of brass nut, bolts and washer with heat shrinkable PVC sleeving. The bar shall be colour coded (red, yellow and blue) for three phases and black for neutral. (b) MCB of SPN, 32 A, 10 KA, with breaking capacity of 25 KA, (c) MCB of SP, 20 A, 10 KA, Make : L & T/Havells - 5 No (4 Motor and 1Stand By)(Outgoing) INDICATING DEVICES (a) LED Indicating lamps for Main Supply indicating R', Y' B' - 01 Set of 3 (b) Digital Voltmeter (Make AE/L&T) - 01 No (c)Current Transformer having Ratio 400/5, 15 VA - 01 Set of 3 (d) Digital Ammeter ( Make(AE/L&T) - 01 N0 (d) Digital Ammeter ( Make(AE/L&T) - 01 N0
M&L for Elestometric Nytral rubber insulation to PP-R pipes suitable for 40mm outer dia 28/19mm thick with chiken wire mesh wire netting 25mm gauge, 20mm mesh with 0.01mm aluminium foil including jointing and fixing material such as solvent adhesive SR-998 complete all as specified and directed .
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.98 MB
archdrg.rar
Additional Documents • 10.87 MB
strdrg.rar
Additional Documents • 4.26 MB
TDDrgs1.rar
Additional Documents • 8.69 MB
CompleteTenderFinal.pdf
Tender Documents • 3.63 MB
BOQ_833198.xls
BOQ • 0.33 MB
TDDrgs.rar
Additional Documents • 19.43 MB
TDDrgs2.rar
Additional Documents • 7.78 MB
Download all tender documents and submit your bid