Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹32.2 L
EMD Value
₹33,000
Closing Date
16 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director, DRDA
DRDA, Collectorate Campus, Vengikkal, Tiruvannamalai
Tiruvannamalai District Providing Infrastructure Development works to AGAMT 2021-22 Village Panchayts at Aruthirapattu Panchayat of Tiruvannamalai Block in Package No. TVM/2021-22/68
2022_RDTN_239147_1
Roc.No.1250/2022/A13 Dt.22.06.2022 68
Open Tender
Civil Works
Lump-sum
180 days
Tiruvannamalai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹33,000
25 Aug 2022
4 Jul 2022
16 Aug 2022
4 Jul 2022
16 Aug 2022
4 Jul 2022
45 days
Amount
Part I : Rejuvenation of Sedhan kulam with Construction of Batting Ghat, Retaining Wall, Baby pond lining and inlet at aruthrapattu panchayat.
Desilting of Sedhan kulam kulam in Aruthirapattu Panchayat. (35.0 x 33.0m )
Clearing light jungles including cost and conveyance of all materials and all labour charges etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc.
In Let & Out Let
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 :4 : 8mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erection of centering for retaining wall and bathing ghat including cost and conveyance of all material and all labour charges etc, complete
Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Refilling Earth filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Construction of Baby Pond Lining wall to 0 Kulam in 0 Panchayat.
Earth work excavation and depositing onsides with initial lead of 10 meter and initial lift of 2 meters in sand,silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth SS 20 B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to all material to site and all labour charges etc., complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour chages etc.,
Construction of Retaining wall
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Supplying and filling Sand in foundation and basement with Excavated earth complete complying to standard specification
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer
Cement concrete 1:3:6 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as balin
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon
Construction of Bhathing Ghat
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Provision for Name Board
Part II : Construction of CC Pavement in VPSC Street Aruthirapattu panchayat.(77M)
Earth work excavation for foundation in all clauses of soils and subsoils to full depth as may be directed ,exept in hard rock requring blasting but inclusive of shoring ,shuttering with initial lead and lift etc.,including levelling the sites complete
Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification
Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Provision for Bitumen Pad
Provision for Name Board
Part III : Contuction of Kitchen Shed (Type II) PUES at Aruthurapattu panchayat
Earth work excavating and deposition on bank with intial lead and lift all clauses of soil such as hard stiff clay soil ,stiff black cotton soil small size boulders and hard gravel soil as per SS 20 B for foundation..
Sand filling with river sand including all cost and conveyance of all labour charges etc., Complete.
Cement concrete in 1:4:8 mix using 40mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete.,
Random Rubble Masonry in CM 1:5 mix using required bond stone with simultaneous pointing including all cost and conveyance of labour charges etc.,
Brick work in CM 1:5 mix using country bricks size of 9'' X 43/8'' x 23/4" including all cost and conveyance of labour charges etc.,Complte
Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm ceter to center etc..
Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc.,
R C C 1:11/2:3 mix usinig 20mm ISS HBG metal including all cost and conveyance of labour charges etc.,
Plastering with CM 1:3 mix using 10 mm thick including all cost and conveyance of labour charges etc.,
Plastering with CM 1:5 mix 12mm thick including all cost and conveyance of labour charges etc., complete.
Weathering course with brick jelly concrete to 0.075m thick and one course to pressed tiles of size of 20cm X 20cm X 2cm and top of pointing with CM 1:3 mix including all cost and conveyance of labour charges etc.,
Terrace Floor finshed with one course of pressed tiles of size 20x20x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Granolithic flooring with CC 1;2:4 mix using 10mm -12mm ISS chips HBG metal including all cost and conveyance of labour charges etc.,
Supply of Door of size of 0.90 x 2.10 including all cost and conveyance etc.,
Supply of Window of size of 1.20 x 1.30 including all cost and conveyance etc.,
Distempering two coats using best quality and approved colour oil bound distemper over one coat of cemet paint including all cost of labour charge etc.,
Cement paint using best quality and approved cemet paint over the one coat cement priemr including all cost conveyance
Painting with approved colour including all cost and conveyance of labour charges etc.,
Providing Platform & Water Supply arrangements(Pipe line & Sintex Tank)
Supply and delivery of 2 HP Three phase submersible pumpset with out panelBoard having duty condition of 50 lpm x 50 m head
Supply and delivery of 2 HP Three phase panel Board with two level guard and auto start suitable for 2 HP submersible pumpset
MS koisk box
1000 lit Sintex Tank
HDPE Hose 32mm Dia
Nylon Rope
32 mm GI Pipe
32 mm GI Nipple
32 mm GI Elbow
32 mm GI Union
Brass Cromium Tap
20mm GI coupling
Shellac
Provision for Name Board
Part IV : Construction of threasing floor in Aruthurapattu panchayat.
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges,etc,
C.C.1:2:4 mix using 20mm metal etc. completed
Cement Concrete 1:3:6 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges,etc,
suplling and errecting of steel centering etc completed
Providing Name Board
Part IV : Construction of threasing floor in ADC at Aruthurapattu panchayat.
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges,etc,
C.C.1:2:4 mix using 20mm metal etc. completed
Cement Concrete 1:3:6 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges,etc,
suplling and errecting of steel centering etc completed
Providing Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Jeevan Construction
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .