Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.7 LAccepted-AOC | L1 | Accepted-AOC L1 tenderer | |
| 2 | Rejected-Technical AFL HOUSE LOK BHARTI COMPLEX FIFTH FLOOR WEST SIDE MAROL MAROSHI ROAD ANDHERI E MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | - | Rejected-Technical NOT SATISFIED BQR CONDITION 3 |
Tender Value
Refer Docs
EMD Value
₹85,000
Closing Date
3 Jul 2020, 2:00 pmClosed
CE/Hydro
Chief Engineer,Hydro,fifth floor,NPKRR Maaligai 144,AnnaSalai,Chennai-600002
Reconditioning and refurbishment of Pelton Wheel Runner coupled with 35MW Generator at Suruliyar Power House in Tirunelveli Generation Circle
2020_EB_165077_1
HE2389
Open Tender
Electrical and Maintenance Works
Works
90 days
Suruliyar
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹85,000
Yes
4 Dec 2020
29 May 2020
4 Jul 2020
29 May 2020
3 Jul 2020
1 Jun 2020
Amount
Charges for transport of runner from suruliyar Power House to companys workshop
Charges for DPT,MPT and UT to check and detect any new cracks in all 22 buckets of the runner, hub and flange area on top and bottom of the runner in presence of Board Engineer.
Charges for preheating the pitting and worn out area of runner buckets for cleaning, grinding and machining with special tools and tackles ( all 22 buckets)
Charges for Preheating, welding of wornout areas with suitable welding electrode and post heating of already detected defects at site such as i) Crack repair on bucket no 1, 2, 4, 5, 10, 13, 16, 17, 19, 20 21 & 22 and broken buckets 2,3 & 5 ii) Nose damage in bucket No 1 & 15 iii) pitting marks observed in all 22 buckets iv) All 22 bucket splitter reconditioning and all 22 buckets knife edge reconditioning v) Charges for MPI test at site after the reconditioning of runner for performance checking after 6 months and 12 months vi)Reconditioning of any extra crack or defects noticed during the inspection at work site
Charges for final finishing, polishing, final DPT, MPI and UT after rectification of defects in all 22 buckets of the runner, hub and flange area on top and bottom of the runner in presence of Board Engineer.
Charges for stress relieving of the whole runner after rectification works
Charges for static and dynamic balancing of runner
Charges for transport of runner from company's workshop to suruliyar Power House.
Local transport and handling charges
CGST in % (For Bidders inside TamilNadu)
SGST in % (For Bidders inside TamilNadu)
IGST in % (For Bidders outside TamilNadu)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .