| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC COIMBATORE CORPORATION | COIMBATORE | COIMBATORE | TAMIL NADU | L1 | Accepted-AOC Accepted | |
| 2 | L2₹8.4 L+₹11,460 (1.38%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SARGURU ENTERPRISES L2 | C BALASUBRAMANIAN L1 |
|---|---|---|---|---|---|
| 1.00 | Clearing the light jungle using JCB etc complete as per the direction of departmental officer | 24 | Hours | 915 ₹21,960 | 909 ₹21,816 Lowest |
| 2.00 | Earth work excavation in all kinds of soils including sand, silt, wet and under water, black cotton, stiff black cotton, clay hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc., excepting all kinds of rock and boulders exceeding 0.014 cum. In volume including rough dressing and dumping the excavated materials away from work site manually within 10m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 9 | Cum | 190 ₹1,710 | 181 ₹1,629 Lowest |
| 3.00 | Plain Cement concrete in 1:4:8 [one cement, four M-sand and eight course aggregate] using 40mm size Hard Broken / Machine crushed Granite Stone Jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification. | 9 | Cum | 5,595 ₹50,355 | 5,590 ₹50,310 Lowest |
| 4.00 | Supplying and erecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over (silver oak joists ) of size 10cm x 6.50cm spread at about 90cm etc. complete complying with standard specification . | 174 | Cum | 500 ₹87,000 | 489 ₹85,086 Lowest |
| 5.00 | Plain Cement concrete in 1:3:6 [one cement, three M-sand and six course aggregate] using 20mm size Hard Broken / Machine crushed Granite Stone Jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification. | 18 | Cum | 6,319 ₹1,13,742 Lowest | 6,319 ₹1,13,742 Lowest |
| 6.00 | Supply and filling with Well gravel layer by layer including labour charges etc completed | 140 | Cum | 400 ₹56,000 | 367 ₹51,380 Lowest |
| 7.00 | Supplying and Laying Rubber Moulded Hydraulic Pressed Paver Block Providing and laying of 83 mm thick high strength of Hydraulic Pressed Paver Block in size of minimum compressive strength of 40 N/mm2 In uniform shape of approved make to be laid in flurring bone pattern with stone dust cushion below the uniform shap of approved non skitting surface in the top and the rate including leveling the base perpareation of pavers as sub base, stone dust cushion 150 mm thick laying out of pavement cut the pieces to fix the edge vibring the paversl sweeping transporting loading unloading of laying paver block as per the standard specifications | 464 | Sqm | 1,100 ₹5,10,400 | 1,090 ₹5,05,760 Lowest |
| 8.00 | Conveying the excavated earth from the site from 0 to 2 km lead including loading and unloading charges etc., completed. | 8 | Cum | 165 ₹1,320 | 163 ₹1,304 Lowest |
| 9.00Add :- GST @ 18% | |||||
Tender Value
₹9.9 L
EMD Value
₹9,950
Closing Date
11 Nov 2025, 3:00 pmClosed
Assistant Commissioner, South Zone
South Zone, Coimbatore Corporation, Kuniyamuthur, Coimbatore 641008
Providing Paver Block and cleaning to Corporation Burial Ground (Muslim Kabarsthan) in Ward No.79,South Zone
2025_MAWS_620435_1
e7 / South Zone / 2025
Open Tender
Civil Works
Works
120 days
South Zone, Coimbatore Corporation
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹9,950
27 Dec 2025
6 Nov 2025
12 Nov 2025
7 Nov 2025
11 Nov 2025
7 Nov 2025
Amount
Clearing the light jungle using JCB etc complete as per the direction of departmental officer
Earth work excavation in all kinds of soils including sand, silt, wet and under water, black cotton, stiff black cotton, clay hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc., excepting all kinds of rock and boulders exceeding 0.014 cum. In volume including rough dressing and dumping the excavated materials away from work site manually within 10m initial lead and 2m initial lift as per the direction of Engineer-in-charge.
Plain Cement concrete in 1:4:8 [one cement, four M-sand and eight course aggregate] using 40mm size Hard Broken / Machine crushed Granite Stone Jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification.
Supplying and erecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over (silver oak joists ) of size 10cm x 6.50cm spread at about 90cm etc. complete complying with standard specification .
Plain Cement concrete in 1:3:6 [one cement, three M-sand and six course aggregate] using 20mm size Hard Broken / Machine crushed Granite Stone Jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification.
Supply and filling with Well gravel layer by layer including labour charges etc completed
Supplying and Laying Rubber Moulded Hydraulic Pressed Paver Block Providing and laying of 83 mm thick high strength of Hydraulic Pressed Paver Block in size of minimum compressive strength of 40 N/mm2 In uniform shape of approved make to be laid in flurring bone pattern with stone dust cushion below the uniform shap of approved non skitting surface in the top and the rate including leveling the base perpareation of pavers as sub base, stone dust cushion 150 mm thick laying out of pavement cut the pieces to fix the edge vibring the paversl sweeping transporting loading unloading of laying paver block as per the standard specifications
Conveying the excavated earth from the site from 0 to 2 km lead including loading and unloading charges etc., completed.
Add :- GST @ 18%
SARGURU ENTERPRISES (BID ID -1507652)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.60 MB
Additional Documents
Additional Documents • 0.20 MB
Tender Documents
Tender Documents • 0.56 MB
BOQ
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .