| 1 | L-1₹7.0 LAccepted-AOC VPO TEH BHARMOUR DISTT CHAMBA HP | CHAMBA | HIMACHAL PRADESH | 176207 | ₹7.0 L | L-1 | Accepted-AOC AOC done |
| 2 | L-2₹7.3 L+₹24,484.49 (3.49%)Rejected-Finance ESD NO II UHL STAGE III BVPCL CHULLAH | LANGNA | MANDYA | KARNATAKA | 571401 | ₹7.3 L+₹24,484.49 (3.49%) | L-2 | Rejected-Finance Not L-1 |
| 3 | L-3₹7.4 L+₹37,146.48 (5.29%)Rejected-Finance RAJINDER KUMAR | CENTRAL DELHI | DELHI | 110054 | ₹7.4 L+₹37,146.48 (5.29%) | L-3 | Rejected-Finance Not L-1 |
| 4 | L-4₹7.7 L+₹63,190.30 (9.00%)Rejected-Finance HPSEBL THALOUT | ₹7.7 L+₹63,190.30 (9.00%) | L-4 | Rejected-Finance Not L-1 |
| 5 | L-5₹7.8 L+₹82,118.60 (11.7%)Rejected-Finance | ₹7.8 L+₹82,118.60 (11.7%) | L-5 | Rejected-Finance Not L-1 |
| Sl No | Description | Qty | Unit | Charanjeet Singh Govt Contractor L5 | Suman Devi Govt. Contractor L8 | RADHA RAMAN L7 | Rajinder Kumar L3 | VIKAS SHARMA L9 | Karnail Singh L1 | NARESH KUMAR L4 | Vijay Kumar L6 | Anil Kumar L2 | sachin ohri govt contractor L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc in all classification of soil in dry or saturated condition upto any depth and lift including pumping and bailing out water where required including stacking the serviceable material and unserviceable material separately as directed and then returning the stacked soil in 15cm(fifteen centimeter) layers when required into plinth and sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus unserviceable excavated earth as directed by the engineer in charge including carriage of material in all leads and lifts disposed material to be neatly dressed leveled as per instructions of the Engineer in charge. | 11.21 | Per cubic metre | 100 ₹1,121 | 170 ₹1,905.7 | 120 ₹1,345.2 | 108 ₹1,210.68 | 150 ₹1,681.5 | 100 ₹1,121 | 70 ₹784.7 Lowest | 150 ₹1,681.5 | 100 ₹1,121 | 150 ₹1,681.5 |
| 2.00 | Filling in plinth with sand under floor including watering ramming consolidating and dressing complete for all floors including carriage of material within all leads and lifts and other incidentalThe rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government.. | 5.82 | Per cubic metre | 600 ₹3,492 | 1,050 ₹6,111 | 250 ₹1,455 Lowest | 530 ₹3,084.6 | 1,000 ₹5,820 | 400 ₹2,328 | 400 ₹2,328 | 1,000 ₹5,820 | 500 ₹2,910 | 1,010 ₹5,878.2 |
| 3.00 | Earth filling in plinth with sand under floor including watering ramming consolidating and dressing complete for all floors including carriage of material within all leads and lifts and other incidentalThe rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government.. | 15.51 | Per cubic metre | 600 ₹9,306 | 315 ₹4,885.65 | 250 ₹3,877.5 Lowest | 340 ₹5,273.4 | 300 ₹4,653 | 250 ₹3,877.5 Lowest | 300 ₹4,653 | 295 ₹4,575.45 | 449 ₹6,963.99 | 300 ₹4,653 |
| 4.00 | Providing and laying cement concrete 1 : 4 : 8 ( one cement : four sand : eight graded crushed stone aggregate 40mm(forty millimetre nominal size) mechanically mixed and curing complete excluding cost of form work in foundation and plinth upto all level including carriage of materials within all leads and lifts inclusive of octroi/royality/Malkhana toll tax/GST/labour cess or other taxes imposed by the Government. | 8.99 | Per cubic metre | 2,800 ₹25,172 | 3,300 ₹29,667 | 2,500 ₹22,475 | 2,720 ₹24,452.8 | 3,305 ₹29,711.95 | 2,700 ₹24,273 | 2,200 ₹19,778 Lowest | 3,250 ₹29,217.5 | 2,758 ₹24,794.42 | 3,305 ₹29,711.95 |
| 5.01 | Providing form work with steel plates 3.15mm(three decimal fifteen millimetre ) thick welded with angle iron in frame of 30x30x5mm(thirty into thirty into five millimeter) size so as to give a fair finish including centering ,shuttering ,strutting and propping etcetera with wooden battens and ballies for all heights of propping and centering below supporting floor to ceiling not exceeding 4 meter and removal of the same for in-situ reinforced concrete and plain concrete work in:- beams cantilevers girders and lintels side and soffit of beams ,beam haunchings, cantilevers, bressumers and lintels in any depth / heights /thickness upto all floor level including enitre carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. | 16.8 | Per square metre | 240 ₹4,032 | 350 ₹5,880 | 100 ₹1,680 Lowest | 290 ₹4,872 | 325 ₹5,460 | 250 ₹4,200 | 250 ₹4,200 | 320 ₹5,376 | 230 ₹3,864 | 325 ₹5,460 |
| 5.02 | Providing form work with steel plates 3.15mm(three decimal fifteen millimeter) thick welded with angle iron in frame of 30x30x5 mm (thirty into thirty into five millimeter) size so as to give a fair finish including centering shuttering strutting and propping etcetera with wooden battens and ballies for all heights of propping and centering below supporting floor to ceiling not exceeding 4 meter and removal of same for in-situ reinforced concrete and plain concrete work in flat surfaces such as soffits of suspended floors roofs landings and the like floors in all thickness in all floor level including carriage of material entire within all leads and lifts and other incidentials and as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax ,GST,labour cess or other taxes imposed by the Government. | 6.14 | Per square metre | 240 ₹1,473.6 | 365 ₹2,241.1 | 100 ₹614 Lowest | 290 ₹1,780.6 | 351 ₹2,155.14 | 250 ₹1,535 | 280 ₹1,719.2 | 345 ₹2,118.3 | 230 ₹1,412.2 | 351 ₹2,155.14 |
| 5.03 | Providing form work with steel plates 3.15mm(three decimal fifteen millimetre) thick welded with angle iron in frame of 30x30x5mm(thirty into thirty into five millimetre) size so as to give fair finish including centering ,shuttering ,strutting and propping etcetera with wooden battens and ballies for all heights of propping and centering below supporting floor to ceiling not exceeding 4 meter and removal of the same for in-situ reinforced concrete and plain concrete work:- in edges of slabs and breaks in floors and walls etcetera upto any width /height complete upto all floor level including enitre carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. | 13.64 | Per Running metre | 240 ₹3,273.6 | 133 ₹1,814.12 | 200 ₹2,728 | 55 ₹750.2 | 115 ₹1,568.6 | 90 ₹1,227.6 | 50 ₹682 Lowest | 105 ₹1,432.2 | 230 ₹3,137.2 | 115 ₹1,568.6 |
| 6.00 | Providing and laying reinforcement cement concrete work of grade M-25(M-twenty five )design mix to obtain the minimum crushing strength of 25 N/mm2 (twenty five Newton per millimeter square ) with minimum cement content of 400 kg (Four hundred kilogramme ) per cubic meter mechanically mixed and vibrated including curing complete excluding cost of form work and reinforced concrete work in suspended floors, roofs, landing and shelves and their supports balconies beams,girders, bressumers and cantilevers upto all floor level/height including entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. | 4.35 | Per cubic metre | 4,800 ₹20,880 | 5,600 ₹24,360 | 5,000 ₹21,750 | 3,800 ₹16,530 Lowest | 5,755 ₹25,034.25 | 4,500 ₹19,575 | 4,000 ₹17,400 | 5,580 ₹24,273 | 5,900 ₹25,665 | 5,755 ₹25,034.25 |
| 7.00 | Steel reinforcement (Sail/RINL/Shyam steel Tisco, Jindal panther (JSPL) make)for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more including entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. | 753.6 | Per Kilogramme | 85 ₹64,056 Lowest | 92 ₹69,331.2 | 92 ₹69,331.2 | 88 ₹66,316.8 | 95 ₹71,592 | 85 ₹64,056 Lowest | 85 ₹64,056 Lowest | 90 ₹67,824 | 89 ₹67,070.4 | 95 ₹71,592 |
| 8.00 | Brick work using second class common burnt clay building bricks in foundation and plinth in cement mortar 1:6(one cement: six sand ) including curing complete including carriage of materials within all leads and lifts inclusive of octroi/royality/Malkhana toll tax/GST/labour cess or other taxes imposed by the Government. | 8.6 | Per cubic metre | 5,800 ₹49,880 | 6,000 ₹51,600 | 5,400 ₹46,440 | 5,200 ₹44,720 Lowest | 6,145 ₹52,847 | 6,000 ₹51,600 | 5,500 ₹47,300 | 5,811 ₹49,974.6 | 5,499 ₹47,291.4 | 6,145 ₹52,847 |
Tender Value
₹8.1 L
EMD Value
₹16,200
Closing Date
6 Aug 2022, 9:00 amClosed
Executive Engineer, Una Division, HPPWD, Una
Executive Engineer, Una Division, HPPWD, Una
Job 8 Construction of Boundary wall with grill and embankment at PHC Dehlan Tehsil Una Distt. Una Sub Head C.O Waiting area and Shed Deposit Work
2022_PWD_63247_1
Job 8 Construction of Boundary wall with grill and
Open Tender
Civil Works - Others
Item Rate
30 days
Una
Please refer to Bidding Documents
14 documents required · 14 mandatory
₹500
₹16,200
13 Sept 2025
1 Aug 2022
6 Aug 2022
1 Aug 2022
6 Aug 2022
1 Aug 2022
Amount
Excavation in foundation trenches etc in all classification of soil in dry or saturated condition upto any depth and lift including pumping and bailing out water where required including stacking the serviceable material and unserviceable material separately as directed and then returning the stacked soil in 15cm(fifteen centimeter) layers when required into plinth and sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus unserviceable excavated earth as directed by the engineer in charge including carriage of material in all leads and lifts disposed material to be neatly dressed leveled as per instructions of the Engineer in charge.
Filling in plinth with sand under floor including watering ramming consolidating and dressing complete for all floors including carriage of material within all leads and lifts and other incidentalThe rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Earth filling in plinth with sand under floor including watering ramming consolidating and dressing complete for all floors including carriage of material within all leads and lifts and other incidentalThe rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying cement concrete 1 : 4 : 8 ( one cement : four sand : eight graded crushed stone aggregate 40mm(forty millimetre nominal size) mechanically mixed and curing complete excluding cost of form work in foundation and plinth upto all level including carriage of materials within all leads and lifts inclusive of octroi/royality/Malkhana toll tax/GST/labour cess or other taxes imposed by the Government.
Providing form work with steel plates 3.15mm(three decimal fifteen millimetre ) thick welded with angle iron in frame of 30x30x5mm(thirty into thirty into five millimeter) size so as to give a fair finish including centering ,shuttering ,strutting and propping etcetera with wooden battens and ballies for all heights of propping and centering below supporting floor to ceiling not exceeding 4 meter and removal of the same for in-situ reinforced concrete and plain concrete work in:- beams cantilevers girders and lintels side and soffit of beams ,beam haunchings, cantilevers, bressumers and lintels in any depth / heights /thickness upto all floor level including enitre carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government.
Providing form work with steel plates 3.15mm(three decimal fifteen millimeter) thick welded with angle iron in frame of 30x30x5 mm (thirty into thirty into five millimeter) size so as to give a fair finish including centering shuttering strutting and propping etcetera with wooden battens and ballies for all heights of propping and centering below supporting floor to ceiling not exceeding 4 meter and removal of same for in-situ reinforced concrete and plain concrete work in flat surfaces such as soffits of suspended floors roofs landings and the like floors in all thickness in all floor level including carriage of material entire within all leads and lifts and other incidentials and as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax ,GST,labour cess or other taxes imposed by the Government.
Providing form work with steel plates 3.15mm(three decimal fifteen millimetre) thick welded with angle iron in frame of 30x30x5mm(thirty into thirty into five millimetre) size so as to give fair finish including centering ,shuttering ,strutting and propping etcetera with wooden battens and ballies for all heights of propping and centering below supporting floor to ceiling not exceeding 4 meter and removal of the same for in-situ reinforced concrete and plain concrete work:- in edges of slabs and breaks in floors and walls etcetera upto any width /height complete upto all floor level including enitre carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government.
Providing and laying reinforcement cement concrete work of grade M-25(M-twenty five )design mix to obtain the minimum crushing strength of 25 N/mm2 (twenty five Newton per millimeter square ) with minimum cement content of 400 kg (Four hundred kilogramme ) per cubic meter mechanically mixed and vibrated including curing complete excluding cost of form work and reinforced concrete work in suspended floors, roofs, landing and shelves and their supports balconies beams,girders, bressumers and cantilevers upto all floor level/height including entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government.
Steel reinforcement (Sail/RINL/Shyam steel Tisco, Jindal panther (JSPL) make)for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more including entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government.
Brick work using second class common burnt clay building bricks in foundation and plinth in cement mortar 1:6(one cement: six sand ) including curing complete including carriage of materials within all leads and lifts inclusive of octroi/royality/Malkhana toll tax/GST/labour cess or other taxes imposed by the Government.
Second class brick work using common burnt clay building bricks in superstructure above plinth level up to all floor level in cement mortar 1:6 (one cement :six sand) and curing complete including carriage of materials within all leads and lifts inclusive of octroi/royality/Malkhana toll tax/GST/labour cess or other taxes imposed by the Government.
Providing and laying Kota stone slab flooring 20mm(twenty millimeter)(average) thick base of cement mortor 1:4(one ceent:four sand) laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete 25mm(Twenty five millimeter) thick complete upto any floor level height including entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. .
Providing and laying Kota stone slab 25mm(twenty five millimetre) thick in risers of steps skirting dado and pillars laid on 12mm(tweleve millimeter) thickcement mortar 1:3 (one cement : three sand) and jointed with grey cement slurry mixed with grey colour to match the pigment including rubbing and polishing complete upto any floor level height including entire carriage of material within all leads and lifts and other incidentials and as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. .
15mm (fifteen millimetre)cement plaster in single coat on fair side of brick/concrete/stone walls for interior plastering in all floor level including arrises, internal rounded angles, chamfers and/or rounded angles not exceeding 80mm (eighty millimetre) in girth and finished even and smooth in cement mortar 1:6 ( one cement : six sand) including curing and carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
15mm (fifteen millimetre)cement plaster in single coat on rough side of brick/concrete/stone walls for interior plastering in all floor level including arrises, internal rounded angles, chamfers and/or rounded angles not exceeding 80mm(eighty millimetre) in girth and finished even and smooth in cement mortar 1:6( one cement :six sand) including curing and carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providig and fixing Structural steel work riveted, bolted or welded in builtup section, trusses and framed work including cutting hoisting fixing in position and applying a priming coat of approved steel primer all complete including entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. .
Providing and fixing Steel (Tata/Sail)work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar worksincluding entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. .
Providing and fixing 0.60mm thick prepainted steel sheet in roofing over steel members/ trusses ,prepainted steel hot dipped metallic zinc coated sheet with top coat of regular modified polyster (R.N.P.) organic coating of 20(twenty) microns over 5(five) microns primer coating to back coat of polyster of five micron over 5 (five ) microns primer coating including fixing with prepainted iron J or L hooks bolts and nuts 6mm diametre with prepainted limpet and rubber washers complete with all accessories as required as per the direction of Engineer-in-charge. including carriage of material with in all leads and lifts and other incidentals. The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and fixing ridges or hips 60 cm (sixty centimetre) overall in prepainted steel street hot dipped metallic zinc coated sheet with top coat of regular modified polyster ) organic coating of 20 microns over 5 microns priimer coating g plus back coat of polyster of Five micron over 5 (five ) microns primer coating 0.60mm (zero point sixty millimetre ) thickness (having 1060mm( one thousand sixty millimetre ) covered with over all width 1126mm(one thousand one hundred twenty six millimetre ) fixed with J or L hooks 6mm (six millimetre ), dia with prepainted G.I. limpet and bitumen washers complete with all accessories as required as per the direction of Engineer in charges. including carriage of material with in all leads and lifts and other incidentals The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and fixing M.S.BP sheet 1.66mm to 2mm(one point sixty six millimetre to two millimetre) thick in eaves board/facia/soffits/ceiling including cutting,fixing and welding to steel roof members and applying a coat of red lead primer complete as per instruction of Engineer-in-charge(Base members of steel work shall be measured & paid separately) including carriage of material within all leads and lifts and other incidentalsThe rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Finishing walls with with water proofing cement paint of shade (Neolac/Assian/Dulux/Berger)having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives New work (Two or more coats applied @ 3.84 kg./ 10 sqm. . including entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. .
Painting steel work with deluxe multi surface paint system for interiors and exterior using Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture including entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. .
Providing plinth protection 50mm thick in cement concrete 1:3:6(one cement: three sand: six graded stone aggregate 20mm( twenty millimetre ) nominal size)including carriage of material with in all leads and lifts and other incidentals The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and fixing garden bench(Delux Model) 1.60 metre long having capacity of four person with ornamental legs and arms of cast iron and back and feet rectangular hollow section 65mmx 25mm 8 numbers strips and 50mmx25mm 5 numbers strips including welding and painting etc.including carriage of material with in all leads and lifts and other incidentals The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Anil Kumar
Rajinder Kumar
NARESH KUMAR
Charanjeet Singh Govt Contractor
Vijay Kumar
RADHA RAMAN
Suman Devi Govt. Contractor
VIKAS SHARMA
sachin ohri govt contractor
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .