| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.4 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹25.4 L+₹85,700 (3.50%)Rejected-AOC 5 45 10A PALACE ENCLAVE ARAMANE BAGILU ROAD NEAR VENKATRAMANA TEMPLE DAKSHINA KANNADA KARNATAKA 574227 INDIA | DAKSHINA KANNADA | KARNATAKA | 574227 | L2 | Rejected-AOC Being not L1 | |
| 3 | L3₹27.0 L+₹2.5 L (10.3%)Rejected-AOC NO 94 OLD NO 100 19TH MAIN ROAD 1ST N BLOCK RAJAJI NAGAR BANGALORE 560 010 | BANGALORE | BANGALORE | KARNATAKA | 560010 | L3 | Rejected-AOC Being not L1 | |
| 4 | L4₹29.4 L+₹4.9 L (20.1%)Rejected-AOC | L4 | Rejected-AOC Being not L1 | |
| 5 | L5₹29.4 L+₹4.9 L (20.1%)Rejected-AOC | L5 | Rejected-AOC Being not L1 |
Tender Value
Refer Docs
EMD Value
₹54,000
Closing Date
20 Nov 2021, 6:00 pmClosed
SHRI VINEET MODI
CWE AF North Bangalore Bellary Road JC Nagar Post Bangalore 560006
COMPREHENSIVE MAINT OF LIFTS IN VARIOUS BUILDING INCLUDING MAP ACCN AT CHAF UNDER GE (AF) BANGALORE
2021_MES_468640_3
87440CWEAFNBAN
Open Tender
Civil Works
Item Rate
330 days
GE (AF) BANGALORE
AS PER NIT
6 documents required · 6 mandatory
₹500
GE (AF) BANGALORE
₹54,000
Yes
21 Dec 2021
28 Oct 2021
22 Nov 2021
28 Oct 2021
20 Nov 2021
8 Nov 2021
29 Oct 2021 - 2 Nov 2021
Amount
Comprehensive maintenance and repairs of microprocessor controlled VVV frequency drive electric driven passenger lift of 884 kg carrying 13 passengers ARD facility from ground plus five/six floors consisting of examining, adjusting, lubricating, greasing the parts. Including replacement of connected mentioned following parts such as Relays, Rectifier & Indication Display, Main Contactors transformers, Brake liner & Gear oil, motor oil & servicing lubrication, Gate lock switches, Gate levers, Gate breaks, Gate track rollers, contact switches and limit switches, Floor level with switch and oscillator switch, Car, Counter weight shoes and doors & Gate shoes, Pit Switch and safety Switches, Landing Floorsindicators, Car bush Buttons and Switches and Car indicators,Car top INS penal board, Emergency Alarm buttons, Up & down Indicator Cards, Limit switches and rollers, Aluminium Brackets, Controller MCB and PF & RR, OSG Roller and Lubrication, Guide Lubrication, Auto Door, Track Rollers and Linking Rolls, Door locks contact, Door lubrication and oil, OSG rope, OSG Clips & Main Rope and Xlips, Rope Tension Spring, OSG Safety Switch, RCR Coil rewinding & RCR Coil, bolt & nuts, Buffer spring,All door track rollers & Surclips, Travelling Cable, LOP & COP buttons with indicators, Door opening Buzzer, Stop Button, Door Stop Car & Landing Doors, Door screen sensor, Door screen sensor cable, PC Boards & repair to Mother Boards, Door Opening Emergency Keys, Breaking Releasing Brake handle, Car door frame, Landing and Car door safety switch wiring cables, Door sensor cable, Door contact switches, Door opening & Closing belt, Door limit switches, Door frame, Main Wheel pulley,replacement of main rope, Main brake wheel fill and etc, Main Gear bearing, Main Motor Bearing, Door Motor Rewinding/Replacing, Cabin Car Lights (LED), Exhaust Fan Rewinding and connected parts,cleaning of lifts etc any items connected to the above items will be provided by Contractor/Vendor. etc. complete all as directed by Engr-in - Charge. Make - KONE Loc -Bldg No P-223(G+6) at MAP Accn Pocket-I.
All as per item No 1 above but Make - KONE Bldg No P-224 (G+6) at MAP Accn Pocket-I.
All as per item No 1 above but Make - KONE Bldg No P-225 (G+6)at MAP Accn Pocket-I.
All as per item No 1 above but Make - KONE Bldg No P-226(G+6) at MAP Accn Pocket-II.
All as per item No 1 above but Make - KONE Bldg No P-227 (G+6)at MAP Accn Pocket-II.
All as per item No 1 above but Make - KONE Bldg No P-228 (G+6)at MAP Accn Pocket-II.
All as per item No 1 above but Make - KONE Bldg No P-229 (G+6)at MAP Accn Pocket-II.
All as per item No 1 above but Make - KONE Bldg No P-230 (G+5) at MAP Accn Pocket-II.
All as per item No 1 above but Make - KONE Bldg No P-231 (G+5) at MAP Accn Pocket-III.
All as per item No 1 above but Make - JOHNSON LOC-AIRMEN BILLET-1(G+5)
All as per item No 1 above but Make - JOHNSON LOC-AIRMEN BILLET-2(G+5)
All as per item No 1 above but Make - JOHNSON Bldg No P-265 (G+5)MES QTRS
All as per item No 1 above but Make : ECE Bldg No P-164(G+5)
All as per item No 1 above but Make - ECE Bldg - P-165(G+5)
All as per item No 1 above but Make:- THYSEEN KRUPP LTD at Path lab,(G+4)
All as per item No 1 above but Make:- THYSEEN KRUPP LTD at Path lab,(G+4)
All as per item 1 above but for lift of 544kg 08 passengers . Make - KONEBldg No P-223 (G+6) at MAP Accn Pocket-I.
All as per item No17 above but Make - KONE Bldg No P-224(G+6) at MAP Accn Pocket-I.
All as per item No17 above but Make - KONE Bldg No P-225(G+6) at MAP Accn Pocket-I.
All as per item No17 above but Make - KONE Bldg No P-226 (G+6) at MAP Accn Pocket-II.
All as per item No17 above but Make - KONE Bldg No P-227(G+6) at MAP Accn Pocket-II.
All as per item No17 above but Make - KONE Bldg No P-228 (G+6) at MAP Accn Pocket-II.
All as per item No17 above but Make Johnson Location : MNS Single Md Accn P-262 Lift I(G+6)
All as per item No17 above but Make Johnson Location: MNS Single Md Accn P-262 Lift 2(G+6)
All as per item No17 above but Make:- THYSEEN KRUPP LTD at P127(G+5)
All as per item No17 above but Make:- THYSEEN KRUPP LTD at P128(G+5)
All as per item No17 above but Make:- THYSEEN KRUPP LTD at P129(G+5)
All as per item No 1 above but lift 1020 Kgs capacity 23 Passengers Make :- OTIS Location : OT Complex.(G+2)
All as per item No1 above but bed cum passenger lift of 544 Kgs capacity 15 Passengers Make - OTIS. Location Family Wing(G+2)
All as per item No 1 above but bed cum passenger lift of 544 Kgs capacity 15 Passengers Make - OTIS. Location OT Complex(G+2)
All as per item No 1.00 above but bed cum passenger lift of 544 Kgs capacity 20 Passengers Make - THYSSEN KRUP. Location Med Division(G+1)Note:-Item No 1to 31 : The maintenance certificate duly signed by contractor and concerned Engineer-in-Charg for the lift every month, the lift mechanic to collect the complaint register daily and on completion/rectification of comlaint the register will be updated and signed. Contractor should provide one Skilled Lift mechanic and one helper for 24 Hrs in cycle. If any lift gets struck/block/U/S at site, within 10 min the lift mechanic should attend the complaint and the complaint to be resolved without any further delay. Incase the problem could not be solved the matter to be informed to the contractor as well as to the MES authorities. Further if the Contractor failed to provide Skilled Lift Mechanic and helper at the time of any Lift Complaint a recovery @of Rs.300/- per hour wef the time of lodging the complaint till completion of 24 hrs will be recovered from the Contractors dues. Also in case of any Lift gets repair for want of Spares the Contractor should provide the spare parts in time or with in 24 hours the Lift should be made serviceable failing which a sum @ of Rs.500/- per hour wef the time after 24 hours shall be recovered from the Contractors dues being hospital priority. The Contractor should keep all the spare parts intact for the above mentioned Lifts in the Lift Rooms.
Carrying out Annual Inspection of lift by government lift inspector for worthiness certificate during the currency of contract agreement within due dates including load testing as per lift act and submitting the worthness certificate all as directed by Engineer-in-charge for the lift as per schedule for Sl No10 to 12, 15, 16 and 23 to 31
Carrying out inspection of lift by government lift inspector for Renewal of lift licence as per lift act and submitting the worthness certificate all as directed by Engineer-in-charge for the lift as per schedule for Sl No1 to 9, 13,14 and 17 to 22.
M & L for Spray painting the lift with colour coding as per site required of any capacity from Up to Ground +6 floor rangingafter preparation of rough unequal surface and applying two coats of synthetic enamel paint (as per guidelines of Engineer in charge) over a coat of primer on old steel surafces and floor wise number marking in front of lift in each floor all as specified and as directed.
Dismantling the existing unserviceable hoisting motor of 10 HP capacity 3 phase, 440 volts from site and carrying out rewinding, changing bearing and all connected parts etc including transporting the motor to the workshop and back and fixing to its original position all as specified and directed
S &F ARD system in case of mains power failure and Lift control system failure, the Lift’s own rechargeable and maintenance free battery power shall move the car to the nearest floor and the door shall open automatically for automatic rescue of passengers. A battery run-down indicator shall be providedcomplete with Battery 12 volts and battery charger and make the system functional all as specified and directed.
ICARE LIFTS PRIVATE LIMITED
Man Elevators Company Pvt Ltd
KAALIKA ELEVATORS
Power and Telecom Systems
KARTHIK INCORPORATE
PREMIER ENGINEERING SYSTEMS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .