Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹41,000Accepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹45,100+₹4,100 (10.0%)Accepted-Finance | 2 | Accepted-Finance L2 | |
| 3 | 3₹50,030+₹9,030 (22.0%)Accepted-Finance | 3 | Accepted-Finance L3 |
| Sl No | Description | Qty | Unit | Swami Krupa Enterprises | Sai Surgical Works | RIDDHI SIDDHI ENTERPRISES |
|---|---|---|---|---|---|---|
| 1.00Work of fabrication and repairing of Clutch and Brake assembly of Hydro Extractor machine No. 4 of capacity 50 kg at Municipal Power Laundry. | ||||||
| 1.01 | Work of dismantle & removable of Main drive assembly, Hub, Main Dum for repairing overhauling. | 1 | Job Work | 2,500 ₹2,500 Lowest | 3,500 ₹3,500 | 4,000 ₹4,000 |
| 1.02 | Work of fabrication and supply of following spare parts
1) EN-8 Shaft- 1 No., size- O.D. 25.5 mm x Length- 930mm
2) G.M. Bush- 1 No., size- I.D. 26.5mm x 51 O.D. x 39mm Length
3) G.M. Bush- 1 No., size- I.D. 27mm x 53 O.D. x 38mm Length
4)G.M. Bush- 1 No., size- I.D. 27.5mm x 57 O.D. x 37mm Length
5)S.S. 304 full threaded Nut-Bolt- 8 Nos., size- 15mm x 75mm | 1 | Job Work | 30,500 ₹30,500 Lowest | 31,650 ₹31,650 | 34,800 ₹34,800 |
| 1.03 | Work of installation of repaired Clutch and Brake assembly of Hydro Extractor Machine No. 4 | 1 | Job Work | 4,500 ₹4,500 Lowest | 5,300 ₹5,300 | 5,980 ₹5,980 |
| 1.04 | Minor miscellaneous work such as machining, drilling, tapping, threading, fastening, etc., as per requirement and site condition. | 1 | Job Work | 3,500 ₹3,500 Lowest | 4,650 ₹4,650 | 5,250 ₹5,250 |
Tender Value
Refer Docs
Closing Date
27 Oct 2025, 4:00 pmClosed
Asst. Engg.
Assistant Engineering, bhoiwada, dadar
Work of fabrication and repairing of Clutch and Brake assembly of Hydro Extractor machine No. 4 of capacity 50 kg at Municipal Power Laundry.
2025_MCGM_1229985_1
Dy.Ch.Eng.(MandE)/1555
Open Tender
Civil Works - Others
Item Rate
30 days
Assistant Engineering
Please refer Tender documents.
3 documents required · 3 mandatory
₹428
31 Oct 2025
15 Oct 2025
28 Oct 2025
15 Oct 2025
27 Oct 2025
15 Oct 2025
Amount
Work of fabrication and repairing of Clutch and Brake assembly of Hydro Extractor machine No. 4 of capacity 50 kg at Municipal Power Laundry.
Work of dismantle & removable of Main drive assembly, Hub, Main Dum for repairing overhauling.
Work of fabrication and supply of following spare parts 1) EN-8 Shaft- 1 No., size- O.D. 25.5 mm x Length- 930mm 2) G.M. Bush- 1 No., size- I.D. 26.5mm x 51 O.D. x 39mm Length 3) G.M. Bush- 1 No., size- I.D. 27mm x 53 O.D. x 38mm Length 4)G.M. Bush- 1 No., size- I.D. 27.5mm x 57 O.D. x 37mm Length 5)S.S. 304 full threaded Nut-Bolt- 8 Nos., size- 15mm x 75mm
Work of installation of repaired Clutch and Brake assembly of Hydro Extractor Machine No. 4
Minor miscellaneous work such as machining, drilling, tapping, threading, fastening, etc., as per requirement and site condition.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_2122695.xls
BOQ • 0.35 MB
SBD.pdf
Tender Documents • 0.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .