Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹8.9 L+₹28,976.19 (3.36%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹9.1 L+₹51,692.06 (5.99%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹9.3 L+₹62,092.65 (7.19%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | A G ELAVARASAN L1 | B.poongodi Construction L4 | S T S CONSTRUCTION L3 | R.Jayalakshmi L2 |
|---|---|---|---|---|---|---|---|
| 1.00Construction of New Multi Purpose Building at Arasanapalli in K Bandarapalli panchayat | |||||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 mand initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 23.18 | Cum | 218.94 ₹5,075.03 Lowest | 234.76 ₹5,441.74 | 232.13 ₹5,380.77 | 226.85 ₹5,258.38 |
| 3.00 | Filling execavated earth including cost and conveyance of all materials to work site and all labour charges etc complete | 14.97 | Cum | 100.42 ₹1,503.29 | 107.68 ₹1,611.97 | 106.47 ₹1,593.86 | 39.43 ₹590.27 Lowest |
| 4.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 8.85 | Cum | 4,550.1 ₹40,268.39 | 4,878 ₹43,170.3 | 4,823.19 ₹42,685.23 | 4,429 ₹39,196.65 Lowest |
| 5.00 | Brick work in cement Mortor 1:5 (One cement and five sand) using second class Bricks of size 23 x 11.5 x 7.5 cms for the following including mixing mortar and all other labour charges etc complete. (Below Ground Level) | 25.34 | Cum | 5,065.91 ₹1,28,370.16 Lowest | 5,432.12 ₹1,37,649.92 | 5,371.08 ₹1,36,103.17 | 5,261.99 ₹1,33,338.83 |
| 6.00 | Supplying and errecting shuttering including necessary support for plane surface including all R.C.C Works etc., Complete.(Above Ground Level) | 22.97 | Sqm | 454.43 ₹10,438.26 Lowest | 487.28 ₹11,192.82 | 481.8 ₹11,066.95 | 470.85 ₹10,815.42 |
| 7.00 | Supplying and errecting shuttering including necessary support for plane surface including all R.C.C Works etc., Complete. | 56.78 | Sqm | 908.85 ₹51,604.5 Lowest | 974.55 ₹55,334.95 | 963.6 ₹54,713.21 | 941.7 ₹53,469.73 |
| 8.00 | R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete | 13.48 | Cum | 7,638.16 ₹1,02,962.4 Lowest | 8,190.31 ₹1,10,405.38 | 8,098.29 ₹1,09,164.95 | 7,654 ₹1,03,175.92 |
| 9.00 | Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor. | 1.7 | MT | 76,242.56 ₹1,29,612.35 Lowest | 81,755.1 ₹1,38,983.67 | 80,835.48 ₹1,37,420.32 | 78,998.31 ₹1,34,297.13 |
| 10.00Cement Concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | |||||||
Tender Value
Refer Docs
EMD Value
₹21,000
Closing Date
10 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO BP
BDO BP
Tirupathur District - Construction of New Multipurpose building at Arasanapalli in K.Bandarapalli Panchayat at Natrampalli Block MLACDS - JPT -2026-27- Package - 03
2026_RDTN_716880_1
A2/2204/2026
Open Tender
Civil Works
Item Rate
180 days
Natrampalli Block
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹21,000
12 Nov 2026
23 Oct 2026
11 Nov 2026
23 Oct 2026
10 Nov 2026
23 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of New Multi Purpose Building at Arasanapalli in K Bandarapalli panchayat | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10 mand initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 23.18 | Cum | - | - |
| 3 | Filling execavated earth including cost and conveyance of all materials to work site and all labour charges etc complete | 14.97 | Cum | - | - |
| 4 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 8.85 | Cum | - | - |
| 5 | Brick work in cement Mortor 1:5 (One cement and five sand) using second class Bricks of size 23 x 11.5 x 7.5 cms for the following including mixing mortar and all other labour charges etc complete. (Below Ground Level) | 25.34 | Cum | - | - |
| 6 | Supplying and errecting shuttering including necessary support for plane surface including all R.C.C Works etc., Complete.(Above Ground Level) | 22.97 | Sqm | - | - |
| 7 | Supplying and errecting shuttering including necessary support for plane surface including all R.C.C Works etc., Complete. | 56.78 | Sqm | - | - |
| 8 | R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete | 13.48 | Cum | - | - |
| 9 | Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor. | 1.7 | MT | - | - |
| 10 | Cement Concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | - | - | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
Tendernotice_2.pdf
PDF • 4.64 MB
BOQ_861115.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .