Tender Value
₹16.0 L
EMD Value
₹16,500
Closing Date
19 Sept 2024, 3:00 pmClosed
Bdo ,Arimalam
Pt.Union Office , Arimalam
Package No. 3 Renovation of Buildings 6 nos at K.Pudupatti PUES in Kaikkulanvayal Panchaya
2024_RDTN_484390_1
Arm/SIDS/Package-3
Open Tender
Civil Works
Item Rate
180 days
Arimalam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹16,500
21 Sept 2024
14 Sept 2024
19 Sept 2024
14 Sept 2024
19 Sept 2024
14 Sept 2024
Amount
Repairs to RCC Roof School Building at K Pudupatti PUES in Kaikulanvayal Panchayat
Chipping of concrete and roughening the surface
Dismantling Existing pressed Tiles and Removeing Debrices away from Site including all cost and conveyance and all Labour charges etc Complete
Finishing the top of the roof with one course of Machine PressedTiles of size 23x23x2 cm of approved quality laid in CEMENT MORTAR 1:3(One cement and three sand) 12 mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar,red oxide, etc., complete complying with standard specification (50% New tiles )
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
White washing two coats using shell lime including cost and conveyance and all labour charges etc
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Block Board Painting two coats over one coat of Primary Coat including cleaning preparing the surface including cost and conveyance of all materials to site and all labour charges etc complete (For OLD Wall)
Exterior Emulsion over one coat including Cleaning, preparing the Surface including cost and conveyance of all materials to site and all labour charges etc complete (For OLD Wall)
Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete
Provision for Cup Doards
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work.
Provision For Electrification Works
Wiring provision for Future Upgradation works with Smart class facility
Light & Fan Point
15Amps plug point
LED Light
Provision for Pedestal for Keeping
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Exterior Emulsion over one coat including Cleaning, preparing the Surface including cost and conveyance of all materials to site and all labour charges etc complete
Supply and Fixing with Cudappah slab 20-30mm thick for cup Board etc completed.,
Repairs to RCC Roof School Building at K Pudupatti Computer Class Room PUES in Kaikulanvayal Panchayat
Chipping of concrete and roughening the surface
Dismantling Existing pressed Tiles and Removeing Debrices away from Site including all cost and conveyance and all Labour charges etc Complete
Finishing the top of the roof with one course of Machine PressedTiles of size 23x23x2 cm of approved quality laid in CEMENT MORTAR 1:3(One cement and three sand) 12 mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar,red oxide, etc., complete complying with standard specification (50% New tiles )
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Paving the floor with kotta stone of size 610x610x20mm cm 1:3 20mm thick including cost and conveyance and all labour charges etc
White washing two coats using shell lime including cost and conveyance and all labour charges etc
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Block Board Painting two coats over one coat of Primary Coat including cleaning preparing the surface including cost and conveyance of all materials to site and all labour charges etc complete (For OLD Wall)
Exterior Emulsion over one coat including Cleaning, preparing the Surface including cost and conveyance of all materials to site and all labour charges etc complete (For OLD Wall)
Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete
Provision For Electrification Works
Wiring provision for Future Upgradation works with Smart class facility
Light & Fan Point
15Amps plug point
LED Light
Provision for Pedestal for Keeping
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Exterior Emulsion over one coat including Cleaning, preparing the Surface including cost and conveyance of all materials to site and all labour charges etc complete
Supply and Fixing with Cudappah slab 20-30mm thick for cup Board etc completed.,
Provision for Cup Doards
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work.
Repairs to Tiled Roof School Building @ K.Pudupatti PUES in KaiKulanvayal Panchayat
Chipping of concrete and roughening the surface
Best tiled roofing with Mangalore tiles,over ceiling tiles of best quality including CW reepers -10Sqm 50% New Tiles
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Block Board Painting two coats over one coat of Primary Coat including cleaning preparing the surface including cost and conveyance of all materials to site and all labour charges etc complete (For OLD Wall)
Exterior Emulsion over one coat including Cleaning, preparing the Surface including cost and conveyance of all materials to site and all labour charges etc complete (For OLD Wall)
Painting two coats using Enamel Paint for Old Wood Work including cost and conveyance of all materials to site and all labour charges etc complete
Provision for Pedestal for Keeping
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Exterior Emulsion over one coat including Cleaning, preparing the Surface including cost and conveyance of all materials to site and all labour charges etc complete
Supply and Fixing with Cudappah slab 20-30mm thick for cup Board etc completed.,
Provision for Cup Doards
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work.
Renovation of SSA Model PUES School Building @ K.Pudupatti in Kaikulanvayal Panchayat
Pointing with CEMENT MORTOR 1:3 MIX to tiles pointing including all labour chrges etc., complete
PLASTERING WITH CEMENT MORTER 1:3MIX 10MM THICKNESS including cost of conveyance of all materials to work site and all labour charges etc. complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Paving the floor with kotta stone of size 610x610x20mm cm 1:3 20mm thick including cost and conveyance and all labour charges etc
White washing 2 coats with shell lime including cost and conveyance of all labour charges etc., complete.
Distembering two coats including cost of conveyance of all materials to work site and all labour charges etc. complete
Emulsion two coats including cost of conveyance of all materials to work site and all labour charges etc. complete
Painting two coats old iron works including cost and conveyance of all materials to site and all labour charges etc., complete.
Painting Two Coats with Approved Black Oxide for Old Black Board Including all cost and all labour charges etc., complete
Supplying and fixing PVC Rain Water Down Fall Pipes of Following dia metre etc
Provision For Electrification Works
Wiring provision for Future Upgradation works with Smart class facility
Light & Fan Point
15Amps plug point
LED Light
Provision for Pedestal for Keeping
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Exterior Emulsion over one coat including Cleaning, preparing the Surface including cost and conveyance of all materials to site and all labour charges etc complete
Supply and Fixing with Cudappah slab 20-30mm thick for cup Board etc completed.,
Provision for Cup Doards
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work.
Renovation to Boys Toilet at K Pudupatti PUES in Kaikulanvayal Panchayat
Chipping of concrete and roughening the surface
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Supplying and Fixing of creamic Tiles including cost and conveyance of all materials to site and all labour charges etc., complete.
Dadooing of walls with glazed tiles of size 15 cm x15cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2 including cost and conveyance of all materials to site and all labour charges etc., complete.
White washing two coats using shell lime including cost and conveyance and all labour charges etc
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Office
Exterior Emulsion over one coat including Cleaning, preparing the Surface including cost and conveyance of all materials to site and all labour charges etc complete (For OLD Wall)
Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete
Supplying and fixing of RCC rings for Leach pit including all charges etc complete
900mm Rings for Toilet
600mm Rings for Urinal
Supplying and fixing of cover slab including all charges etc complete
900mm Cover Slab
600mm Cover Slab
Supply and Fixing of Indian type Water closet 580x440mm of approved quality
Provision for water Supply Arrangements
Supply and Providing 1000 Lit HDPE Tank
Supply and Fixing of 20mm dia PVC pipe
Supply and Fixing of 50mm dia PVC pipe
Supply and Fixing of 20mm dia PVC Coupler
Supply and Fixing of 20mm dia PVC Bend
Supply and Fixing of 20mm dia PVC Tee
Supply and Fixing of 50mm dia PVC Coupler
Supply and Fixing of 50mm dia PVC Elbow
Supply and Fixing of Water Tap
Renovation to Girls Toilet K Pudupatti PUES in Kaikulanvayal Panchayat
Chipping of concrete and roughening the surface
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Supplying and Fixing of creamic Tiles including cost and conveyance of all materials to site and all labour charges etc., complete.
Dadooing of walls with glazed tiles of size 15 cm x15cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2 including cost and conveyance of all materials to site and all labour charges etc., complete.
White washing two coats using shell lime including cost and conveyance and all labour charges etc
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Office
Exterior Emulsion over one coat including Cleaning, preparing the Surface including cost and conveyance of all materials to site and all labour charges etc complete (For OLD Wall)
Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete
Supplying and fixing of RCC rings for Leach pit including all charges etc complete
900mm Rings for Toilet
600mm Rings for Urinal
Supplying and fixing of cover slab including all charges etc complete
900mm Cover Slab
600mm Cover Slab
Supply and Fixing of Indian type Water closet 580x440mm of approved quality
Provision for water Supply Arrangements
Supply and Providing 1000 Lit HDPE Tank
Supply and Fixing of 20mm dia PVC pipe
Supply and Fixing of 50mm dia PVC pipe
Supply and Fixing of 20mm dia PVC Coupler
Supply and Fixing of 20mm dia PVC Bend
Supply and Fixing of 20mm dia PVC Tee
Supply and Fixing of 50mm dia PVC Coupler
Supply and Fixing of 50mm dia PVC Elbow
Supply and Fixing of Water Tap
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K.Dhanasekaran (BID ID -1140859)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .